Northeast Ohio Areawide Coordinating Agency Kamm’s Corners Development Corporation.

Slides:



Advertisements
Similar presentations
Washington Street Redesign Andrew Brunn, Kamila Misiak, Sarah Thomas The Long Term Solution.
Advertisements

What is the S-48 Corridor? Study Area What’s Happened So Far? Previous Tasks  Project InitiationJune 2005  Existing ConditionsOct  Planning.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
City of High Springs - Traffic Study City of High Springs Traffic Study Sept. 16th, 2003 Public Meeting #2.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
US 52 Corridor Study Public Meeting November 15, 2010.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Borough of Madison Samson Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Federal Aid SRTS Application Reconstruction.
City of Portland SW 6 th Avenue & Jackson Street Intersection Solution Study 1 Presented By: Josh Crain Robert Acevedo Xiaowei Wu Chengxin Dai.
Ed Cox City of Sacramento, Department of Public Works Bicycle Solutions in Sacramento.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Virginia Street Corridor Plan. From our Tier One University, world renowned recreation and our Midtown entertainment area to abundant cutting edge business.
Contact: Beth Morris
Florida Department of Transportation, November 2009
Redwood Road & 35th Avenue Traffic Study. Problems Observed: High collision rate along the corridor was found at McArthur Boulevard intersection, with.
Slide 1. Slide 2 Introduction How did you get to school as a child?
Northeast Ohio Areawide Coordinating Agency Olmsted Township Trustees.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
Plan Purpose:  To provide pedestrian environments that are safe, attractive, and accessible to community institutions, employment and retail services.
Designing For Complete Streets In Nashville Metropolitan Government of Nashville and Davidson County, Karl F. Dean, Mayor John W. Lynch, Director, Department.
Efficiency through technology and collaboration Road Diet (Roadway Reconfiguration) Every Day Counts 3 Innovative Safety Initiative.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
Pinehurst School Traffic Safety Pinehurst School Traffic Safety Meeting January 27-28, 2015.
University Bike Master Plan. University Policy  Bicycle committee recommends that the current policy for bicycles on sidewalks be changed to create a.
Utah Collaborative Active Transportation Study.  Regional Collaboration.
Virginia Street Bus RAPID Transit Extension Presentation to RTC July 17, 2015 Project Purpose Extend RAPID to UNR Improve pedestrian safety & access Create.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
August 2004 Hickory by Choice Linking Land Use and Air Quality Planning.
Borough of Madison Woodland Avenue Reconstruction Engineering CY2009 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
Going from 4 Lanes to 3 Lanes Jefferson City’s McCarty Street Project.
A Handbook That Outlines When traffic impact studies should be required What analyses should be included How the study should be reviewed and used Who.
APWA Management & Public Administration Committee Creating Complete Streets to Accommodate All Users May 23, 2012.
May 1, 2014 East Gude Drive Pedestrian Road Safety Audit Stakeholder Pedestrian Safety Meeting.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Town of Cobourg Division Street Improvements Public Information Centre October 1, 2015 Image Courtesy of Google 2015.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
23 rd Avenue Corridor Greenway Community Open House November 6, 2013.
The Main Street Bike Lane Project LADOT Bike Program.
Oregon Transportation Commission October 14, 2015 OR 99 Rogue Valley Corridor Plan.
What is a TSP? Provides City with guidance for operating and improving a multimodal transportation system Focuses on priority projects, policies, and programs.
Northside Transportation Network Community Meeting November 17 th, 2010 UROC.
What is a TSP? Provides City with guidance for operating and improving a multimodal transportation system Focuses on priority projects, policies, and programs.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
Rainier Avenue South Pilot Project Update Seattle Bicycle Advisory Board Project Manager Jim Curtin September 2, 2015.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
Shoreline Drive/Greene Lane Park/McAllister Point Aquidneck Island Reuse Planning Authority Surplus Properties at NAVSTA Newport, Rhode Island March 6,
South/West Corridor Transit Improvements ZARZAMORA AND MILITARY PRIMO BRT PROJECTS ENVIRONMENTAL AND PRELIMINARY DESIGN PHASE September 9, 2014 VIA Community.
Lompoc Walkability Assessment September 24, 2009.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
Virginia Street Bus RAPID Transit Extension City of Reno Council Meeting April 29, 2015.
Union Park District Council Streets & Utilities CIB Proposal Pedestrian Safety & Traffic Improvements in the Snelling-Selby Area.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
SR 44 at Grand Avenue Volusia County, FL River to Sea CAC/TCC Meetings May 17, 2016.
University Drive Road Diet September 8, Goals and Objectives A. Reduce vehicular speed in the corridor. B. Provide an attractive bicycle accommodation.
2040 LONG RANGE PLAN UPDATE Congestion Management Process Plan (CMPP) Major Update February 24, 2016.
Norwalk Bikeway and Pedestrian Transportation Plan Fitzgerald & Halliday, Inc. with Alta Planning + Design and Stantec Innovative Planning, Better Communities.
Bicycle Safety Countermeasures Module 4.
Urban Street Design Standards Overview of Project and Details
Bicycle Lanes for the City of Boston
UGA Bicycle Facilities Study
Ad Hoc Advisory Group presentation, August 3, 2016
SR 60/Kennedy Boulevard and Jackson Street Resurfacing Projects
River to Sea TPO Meeting US 92/International Speedway Boulevard
General Meyer Avenue Complete Streets Improvements Project
Protected Bicycle Lanes Finally Pedal Their Way to KC…
MPO Board Presentation
New Hanover Comprehensive Plan
Presentation transcript:

Northeast Ohio Areawide Coordinating Agency Kamm’s Corners Development Corporation

Timeline 2014 DeliverablesCompletion Outline project goals and objectives,May 2014 Identify Steering Committee members June 2014 Steering Committee Meeting #1June 2014 Existing Conditions Summary September 2014 Community Meeting #1 September 2014 Draft list of recommendations November DeliverablesCompletion Steering Committee Meeting #2January 2015 Draft prioritized implementation planMarch 2015 Community Meeting #2March 2015 Community Meeting #3 May 2015 Finalize list of recommendations May 2015 Develop draft reportMay 2015 Steering Committee Meeting #3May 2015 Finalize prioritized implementation plan June 2015 Final reportJune 2015 City Council and Planning Commission adoption June 2015

Rocky River Drive Plan Goals Identify transportation improvements for motorists, pedestrians, transit riders, and cyclists Improve gateways to the neighborhood and connections to Cleveland Hopkins, Rocky River Reservation Update 2002 Master Plan to reflect trends in property values, foreclosures, vacancy in order to develop a redevelopment strategy Analyze options for City owned parking at Albers and West 168 th Street

Community Feedback

Study Area 2002 Master PlanCurrent Study

Street Sections and Lane Widths Typical road width is 52 feet Outer lanes widen south of Puritas Typical lane width is 12’-15’ Standard lane width is 11’ Excessive width encourages speeding, which is unsafe

Population and Housing Trends Overall, population is declining Slowing between 2000 – 2010 Growth in young adults and adults Population, Household, and Dwelling Units PopulationHouseholds Dwelling Units ,0586,0886, ,8706,3476, ,0426,8027, ,4526,7586,913 Change %-10%-5% Age Characteristics Under Age 1818 to 2425 to 4445 to 6465+Total 19805,5342,3645,0854,0302,43919,452 Percent of Total28%12%26%21%13%100% 19904,2191,3055,5833,3202,61517,042 Percent of Total25%8%33%19%15%100% 20003, ,9603,0742,31814,870 Percent of Total24%7%33%21%16%100% 20103,2001,2364,0223,9321,66814,058 Percent of Total23%9%29%28%12%100%

Crashes: Lorain to Puritas & Puritas to Brookpark

Traffic Volumes Rocky River Drive 24-hour volumes range between 10,000 and 17,000 Volumes are highest near Lorain Ave Volumes generally decrease going south away from Lorain Ave Volumes expected to decline by 10%-15% by ,000 13,000 16,000 15,000 10,000 12,000 13,000

Traffic Analysis DD DC BA BA CC BA AA DD AM 7:15a-8:15a PM 4:30p-5:30p LorainCDD ChatfieldCCD ValleyviewAAB FairwayBAB PuritasCCC HomewayBAB Cleveland PkwyAAA BrookparkDDD D or better is acceptable operation PM peak from 4:30p-5:30p is the heaviest hour of traffic

Create neighborhood gateway on southern end of study area (consistent with wayfinding) New Gas Station at Brookpark and Rocky River Drive Will include gateway landscaping – signage to West Park, Kamm’s Corners Cleveland Parkway Denotes separation from airport uses (i.e., rental car facilities) Extend wayfinding to Brookpark Preliminary Recommendations

Proposed Traffic Operations: North of Homeway ALTERNATE: BUFFER STRIPING ALTERNATE: ON-STREET PARKING

Current Configuration

Proposed Configuration

Proposed Traffic Operations: South of Homeway

Current Configuration

Proposed Configuration

Preliminary Recommendations Existing: Metroparks Multiuse Path Puritas Avenue Bike Lanes Plans: Puritas connector to Metroparks Lorain Avenue east of W. 150 th Triskett Road (W. 140 th to Lorain) Proposed (by Cleveland Bikeway Implementation Plan) Rocky River Drive Connectors to Grayton Road and Cleveland Hopkins Airport

Crosswalks Install high visibility crosswalks at intersections Install mid-block crossings and/or pedestrian islands at several locations, particularly near schools or on walking routes to school Preliminary Recommendations

Benefits of 3-lane Roadway SAFETY: 29% Reduction in crashes, improved visibility for left-turning cars & crossing pedestrians, reduced speeding LIVABILITY: driving lanes are further away from sidewalk, median could be landscaped where turn lanes aren’t needed OPERATIONS: separating left turns reduces delay, side street through movements are easier

Benefits of 3-lane Roadway FHWA: 1 of 9 Proven Safety Countermeasures

Benefits of 3-lane Roadway ODOT is supportive of 3-lane roads that operate at LOS D or better 3-lane roadway supports recommendations from various City of Cleveland planning efforts: Bikeways Plan (2014) Street Typologies Plan (2013) Complete and Green Streets Ordinance (2011)

Next Steps Incorporate public comments Finalize recommendations Develop implementation plan and preliminary cost estimates Stakeholder Meeting 3 Draft final report

Ryan Noles or ext. 273 Melissa Thompson or ext. 344 Ben Campbell or ext. 1200