“Challenges and Possible Solutions in the Power Sector” A PRESENTATION TO THE ECONOMICS ASSOCIATION OF ZAMBIA R P SISALA MANAGING DIRECTOR 10 TH JULY.

Slides:



Advertisements
Similar presentations
Achieving Price-Responsive Demand in New England Henry Yoshimura Director, Demand Resource Strategy ISO New England National Town Meeting on Demand Response.
Advertisements

Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
BI Marketing Analyst input into report marketing Report TitleElectricity in Botswana Report SubtitleCountry profile of power market trends and investment.
BI Marketing Analyst input into report marketing Report TitleElectricity in Zambia Report Subtitle Country profile of power sector, market trends and investment.
Sistan & Balouchestan Electric Power Distribution Company
SOUTHERN AFRICAN POWER POOL 1 BRIEF ON SAPP POWER PROJECTS by Eng. Musara Beta Chief Market Analyst SAPP Coordination Centre Zimbabwe Mining Indaba, Harare,
Southern African Power Pool
Load Shedding in Zambia: What Should be the Plan Presentation to the EAZ July 2014 Monthly Discussion Forum Mulungushi International Conference Centre.
Responding to the Electricity Challenges: Five Point Plan Overview 19 December 2014 Confidential 1.
SHOULD THE ZAMBIAN GOVERNMENT INVEST IN RAILWAYS?  Zambia is a landlocked country bordering with Angola, Democratic Republic of Congo (DRC), Tanzania,
1 Power Sector in Tanzania Recent Developments, Current Crisis, Issues, Challenges and Solutions.
ZPC – Power and Energy Projects
TARIFF REGULATION IN THE NIGERIAN ELECTRICITY SUPPLY INDUSTRY
Previous Efforts in the Electricity Sector to Improve Energy Efficiency On Supply Side  Maximum use of natural gas.  Increase of generation efficiency.
Energy and Poverty Reduction Strategy Process, the Zambian Case Presented at the Energy Access for the Rural Poor Workshop Hotel VIP, Maputo, Mozambique,
Energy Infrastructure in Latin America the View of the IDB May 6, 2011 Miami, Florida Sustainable Energy for all.
PUBLIC FINANCE AND URBAN GROWTH “THE CASE FOR A NATIONAL URBAN POLICY FOR ZAMBIA” Presentation to the IGC Cities Research Conference: 21 st -22 nd May,
Assessing the Potential of Energy Efficiency Programmes in South Africa by Modelling Selected Policy Interventions Alison Hughes Energy Research Centre,
Input-Output Analysis of Climate Change: Case Study of Efficiency Driven Policy Choice of Indian Response Strategy Joyashree Roy Jadavpur University, Kolkata,
Infrastructure for Development Investing in Clean Energy.
Powering Africa – SAPP Strategies
Plant Utility System (TKK-2210)
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 14 Energy Efficiency Module 14: DEMAND-SIDE MANAGEMENT.
The Efficiency of Energy Efficiency Program Tom Van Paris Vice President-Member Services & Communications October 18, 2012.
Exploring Energy Opportunities In India NABC Conference June 29, 2006.
Eskom’s contribution to the solar park initiative
Overview of the SAPP and the Energy Network in Southern Africa
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 13 Energy Efficiency Module 13: SUPPLY-SIDE MANAGEMENT.
GDS Associates, Inc. 1 Virginia Energy Efficiency and Conservation Savings Potential Presented by Richard F. Spellman Vice President GDS Associates, Inc.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Distributed Generation Programs, Incentives and Interconnections Ian Loughran, P.Eng. DSM Program Leader Renewable Energy Programs
Energy & Environment Initiatives. 2 Technology Finance Group Supports demonstration projects & activities creating awareness The demonstration projects.
Financing Options To Enable RET Deployment A Presentation at the Experts Meeting on RETS and Green Energy For Rural Development 9-11 February 2010 Geneva.
The ICT Sector in Zambia Presented by: Ministry of Communications and Transport Overview & Investment Perspective.
MINISTRY OF ENERGY AND WATER DEVELOPMENT INVESTMENT OPPORTUNITIES IN THE ENERGY SECTOR Name: Patrick Mubanga Venue:Pamodzi Hotel Date:26 th January 2010.
REGONAL MULTI-STAKEHOLDER CONSULTATION ON “FINANCING ACCESS TO UTILITIES FOR ALL” ENSURING SUSTAINABLE ACCESS TO ELECTRICITY FOR THE POOR THROUGH INTERNAL.
Presenter: Peter Busch
AFREPREN/FWD Cogen Centre Training Workshop on Cogeneration in Africa
Efficiency Vermont your resource for energy savings The Economic Benefits of Energy Efficiency.
Smart Metering and the Smart Grid How does it work and what can it do? Will Chaney 1Energy Awareness Week, 3-8 May 2010.
Towards Sustainable Universal Access Siven Naidoo Meeting of the Technical Group and the Sherpas of the Secretary-General’s High-level Group On Sustainable.
ELECTRIFICATION FOR DEVELOPMENT C T Gaunt University of Cape Town.
POTENTIAL AND STRATEGIES FOR DEMAND SIDE MANAGEMENT Dr. Ajay Mathur Director General, Bureau of Energy Efficiency.
Name of Building(s) or Project Speaker(s) Organization(s)
Biofuels at the level of the Common Market for Eastern and Southern Africa (COMESA) Presented to First High Level Biofuels Seminar in Africa Addis Ababa,
Demand Response: Keeping the Power Flowing in Southwest Connecticut Presented by: Henry Yoshimura Manager, Demand Response ISO New England September 30,
Management and Organisation of Electricity Use Electrical System Optimisation Belgrade November 2003.
1. 2 Energy Efficiency Consultation Workshop International Experience in Energy Efficiency August , Bangkok, THAILAND by Vincent David Econoler.
Reasons for Pursuing DG in Ontario Presented by: Mark Wolnik Markham Energy Corp -Director March 5, 2003.
2008 Electricity Distribution Maintenance Summit Stream 3A: Funding, Investment and Financial issues 10 June 2008 Theo van Vuuren Divisional Executive.
INVESTMENT AND TRADE OPPORTUNITIES IN ZIMBABWE. OUTLINE OF PRESENTATION Country Profile Why investing in Zimbabwe? Opportunities: Agriculture Energy Mining.
World Bank Framework for Energy Trade in South East Europe David Kennedy World Bank.
CUBA ELECTRIC INDUSTRY
1 19 th World Energy Congress – 2004 Round Table 1 – Non Fossil Fuels: Will They Deliver? Jerson Kelman President, Brazilian Water Agency - ANA.
SOUTHERN AFRICAN POWER POOL PPP Power Projects in Southern Africa
Demand Response
CHALLENGES AND INVESTMENT OPPORUNITIES: THE CASE OF ZESA By Mr Ikhupuleng Dube, System Development Manager – Zimbabwe Electricity and Transmission Company.
BI Marketing Analyst input into report marketing Report TitleElectricity in Namibia Report Subtitle Country profile of power sector, market trends and.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
1 Potomac Electric Power Company Case 9155 & Delmarva Power & Light Case 9156 EmPOWER MARYLAND DRAFT NON-RESIDENTIAL ENERGY EFFICIENCY AND.
INTRODUCTION TO DEMAND SIDE MANAGEMENT(DSM) PRESENTED TO ZAMBIA ASSOCIATION OF MANUFACTURERS ENERGY EFFICIENCY AND CONSERVATION WORKSHOP 5-6 SEPTEMBER.
AFRICAN DEVELOPMENT BANK KENYA- SPAIN Multilateral Partnership Meeting Nairobi, 9 December 2013.
SCALING UP FAMILY PLANNING (SUFP) PROJECT IN ZAMBIA Ben Bellows Population Council 26 January 2016 Panel: Transitioning from pilot to scale: Challenges.
National Coordinator Cancer Prevention Ministry of Health Zambia
Economic Operation of Power Systems
THE REPUBLIC OF MALAWI MALAWI PRESENTATION AT
Stakeholders’ Workshop on RE Guidelines
Report to the UPDEA 39th General Assembly
Convergence of EVs, Battery Storage
Potential Benefits for Market Transformation to Inverter A/C
Presentation transcript:

“Challenges and Possible Solutions in the Power Sector” A PRESENTATION TO THE ECONOMICS ASSOCIATION OF ZAMBIA R P SISALA MANAGING DIRECTOR 10 TH JULY 2008 ZESCO LIMITED

PRESENTATION LAYOUT 1.Overview of Zambian Power Sector 2.Outline of ZESCO Power System 3.The Power Supply Challenge 4.ZESCO System Status 5.Strategies to Overcome the Deficit 6.Conclusion

1.OVERVIEW OF ZAMBIAN POWER SECTOR

I.MAJOR ECONOMIC ACTIVITIES  Mining  Agriculture  Tourism  Industry & Commerce  Construction And Housing

II.POWER SECTOR PLAYERS ZESCO-PUBLIC UTILITY  Public Utility  Generation, Transmission, Distribution and Supply COPPERBELT ENERGY CORPORATION  Privately Owned  Transmission & Distribution to Mines  BSA with ZESCO to Purchase Power and Sell to Copperbelt Mines (Ex- ZCCM)  80MW Gas Turbines LUNSEMFWA HYDRO POWER COMPANY  Privately Owned  Generation Capacity-37MW  Some transmission lines into Kabwe  PSA with ZESCO for Sale of Bulk Power

2. OUTLINE OF ZESCO POWER SYSTEM

I.ZESCO FACT SHEET  Vertically integrated utility  Annual turnover: US$$300million  Assets in excess of US$3.0billion  Customer base: over 300,000  Employees: 3,900  Sales: 9,450GWh  National maximum demand: +1,500MW  Customer/employee ratio: 80  Approx. 50% sales to CEC & other mining customers  5% exports to regional markets  Access rates-27%

II.GENERATION ASSETS  Kafue Gorge - 900MW (990MW)  Kariba North Bank - 600MW (720MW)  Victoria Falls - 108MW  Small Hydros - 24MW TOTAL INSTALLED CAPACITY 1,640MW (1850MW)

III.TRANSMISSION ASSETS  330KV - 2,008km  220KV - 548km  132KV - 85km  88KV - 704km  66KV - 3,014km  High Voltage Substations - 27  National Control Centre - 01  Regional Control Centres - 03

IV.DISTRIBUTION ASSETS  66kV+3,000km  33kV & 11KV+6,500km  MV lines+20,000km  In excess of 5,000 substations  6 Diesel fired power stations 8MW

D R CONGO TANZANIA MALAWI MOZAMBIQUE ZIMBABWE NAKONDE KASAMA ISOKA CHINSALI MPOROKOSO LUWINGU MPIKA PENSUL O SERENJE CHIPATA CHIRUNDU LEOPARDS HILL KARIBA SOUTH MUSONDA FALLS (5MW) LUSIWASI (12MW) MULUNGUSHI (20MW) MSORO LUNDAZI MFUE AZELE LUNSEMFWA (18MW) CHISHIMBA FALLS LUNZUA (0.75MW) MBALA SAMFYA KASHIKISHI PETAUKE MOMBUTUTA CHIENGI LUAPULA RIVER To Sumbuwanga KALUNGWISHI RIVER MPULUNGU NAMIBIA BOTSWANA ANGOLA KALAB O MONGU SENANGA SESHEKE SOLWEZI ITEZHI – TEZHI (120MW) VICTORIA FALLS (108MW) MUZUMA MICHELO LUANO KITWE MAPOSA KANSUSWA KABWE KAPIRI MPOSHI MPONGWE LUSAKA WEST KAFUE WEST KAFUE TOWN KAFUE LOWER (750MW) KAFUE GORGE 900MW(1080MW) KARIBA NORTH (600MW(750MW) LAKE KARIBA MAZABUKA MUMBWA MANSA MAMBILIMA KAFUE RIVER ZAMBEZI RIVER CHAMBESHI RIVER WEST LUNGA at West Lunga River (2.5MW) KASEMPA CHIKATA FALLS (3.5MW) MUFUMBWE LUKULU KAOMA 220kV 22 o East 33.5 o East 8o8o 18 o KATIMA MULILO ZAMBEZI LUANGWA 132kV 88kV 66kV 330kV EXISTING POWER\SUBSTATIONS AND POWER LINES PROPOSED POWER\SUBSTATIONS AND POWER LINES 330kV 220kV 132kV 88kV 66kV HYDRO POWERSTATION SUBSTATION DIESEL STATION PROPOSED HYDROPOWERSTATION PROPOSED SUBSTATION PROPOSED DIESEL STATION CHONGWE CHAVUMA KABOMPO MWINILUNGA KANSANSHI LUMWANA (Mine) KAPUTA NCHELENGE CHAMA KUNDABWIKA (101MW) KABWELUME (62MW) KAWAMBWA TEA MBERESHI LUSIWASI EXTENSION (40MW) KARIBA NORTH EXTENSION (600MW(750MW) BATOKA GORGE (800MW) DEVILS GORGE (800MW) BWANA MKUBWA ROMA COV. NAMPUNDWE MAAMBA KATIMA MULILO KABOMPO Gorge (34MW) Luangwa Bridge Mkushi Farm Block Mkushi Central Kawambwa Town Chambasitu SHANGOMBO MUYOMBE ZESCO GRID (66 – 330kV)

3. THE POWER SUPPLY CHALLENGE - REGIONAL AND ZAMBIAN PERSPECTIVE

I.MAIN DRIVERS OF ELECTRICTY DEMAND AND THE DEFICIT  Economic Growth of more than 5% in most of the SADC member countries resulting in unprecedented growth in electricity consumption and demand  Driven by increased demand for base metals resulting in high metals prices on world market  New mining companies established and others expanded  Growth in other sectors such as industry, commerce, agriculture, housing, etc  Country electrification programmes – rural and urban  Inadequate investment in generation and transmission infrastructure over the last 20 – 30 years

II.ENERGY DEMAND PROJECTIONS  EXISTING CAPACITY TO BE EXHAUSTED AROUND 2007/08  BOTH NATIONAL AND REGIONAL DEMAND TO SURPASS CURRENT CAPACITY  NEED FOR NEW POWER PLANTS  ELECTRICITY IS KEY TO NATIONAL ECONOMIC DEVELOPMENT

Installed Capacity Future demand SAPP DEMAND PROJECTIONS 1998 TO 2010

THE CHALLENGE WAS IDENTIFIED AND COMMUNICATED BUT NOT ADEQUATELY ADDRESSED

III.CHALLENGES NOT ADEQUATELY ADDRESSED  CAPITAL INVESTMENT REQUIREMENTS -Power projects have long gestation periods -Pre-feasibility & feasibility studies plus EIA -Project packaging and mobilisation of finance -Plus project implementation 5 – 7years -Power sector investments require huge capital outlay -Characterised by long payback periods -But private sector requires short term returns -Power projects compete for capital with more lucrative projects with short term returns

CHALLENGES NOT ADEQUATELY ADDRESSEDCont’d  SUB-ECONOMIC TARIFFS -Tariffs in Zambia too low & not cost reflective -Cannot meet typical investment requirements -Legacy of socialist economy -Topic flavoured by socio-political issues

COMPARISON OF REGIONAL TARIFFS (2007)

CHALLENGES NOT ADEQUATELY ADDRESSEDCont’d  SURPLUS CAPACITY - Zambia was an energy surplus nation -Economy went through period of stagnation -Did not anticipate high rate of economic recovery -

CHALLENGES NOT ADEQUATELY ADDRESSEDCont’d  STAKEHOLDERS AND LOBBY GROUPS -Sector opened to private investment through Electricity Act CAP 433 of Govt. established OPPI in Package of incentives for private sector investment in power projects put in place -Future generation projects to be private sector driven -Endless debates on privatisation and/or restructuring of ZESCO but no new Megawatts -Private sector was seen as panacea for future energy requirements but none came to invest -Generation projects taken away from ZESCO -

ZESCO’S RESPONSE -ZESCO recognised that time was being lost in privatisation and other debates about the structure of the industry -Not permitted to invest in new generation projects -Saw that the nation would one day wake up to a power deficit -Need for quick intervention at least to delay day of reckoning - Took the option of changing scope of its Power Rehabilitation Project to include uprating -Uprating of Kafue Gorge and Kariba North Bank to add 210MW of additional capacity at minimal cost -This action delayed project completion but it was worthwhile ZESCO’S RESPONSE TO CHALLENGES

4. ZESCO SYSTEM STATUS

-PRP in progress at Kafue Gorge and Kariba North Bank power stations -Total 450MW not available -Available capacity 1,170MW -Current national demand 1,450MW -The deficit is a peak period phenomenon, sufficient capacity during off-peak periods -Load management otherwise known as load shedding required in order to maintain balance of supply and demand during peak periods ZAMBIA: CURRENT DEFICIT

TYPICAL LOAD MANAGEMENT SCHEDULE STATIONCAPACITY ( MW) Kariba North400 Kafue Gorge490 Victoria Falls90 Lunsemfwa30 Snel Imports120 Total Generation1,130 Available Capacity (Less transmission Losses) 1,074 Lusaka allocation258 Ndola allocation55 C/belt Division allocation103 CEC allocation470 Kansanshi allocation75 Bwana Mkubwa12 Others102 TOTAL ALLOWABLE LOAD 1,074

5. STRATEGIES TO OVERCOME THE DEFICIT

I.SHORT TERM STRATEGIES  DEMAND SIDE MANAGEMENT  Reduction in peak demand by voluntary load reduction -otherwise power rationing and load shedding by ZESCO  Process efficiencies  Use energy efficient appliances equipment e.g. - replace incandescent lamps with Compact Fluorescent Lamps (CFLs)  Shifting of load away from peak periods -switch off unnecessary appliances during peak periods e.g. electric geysers, swimming pool pumps, borehole pumps -business houses can shift (some) production processes to off-peak and benefit from off-peak tariffs  Power factor improvements -large consumers such as mines, industry and agriculture -carefully selected process equipment -retro-fitting capacitor units on inductive equipment such as electric motors

 UPRATING OF EXISTING POWER STATIONS  Kafue Gorge- 900MW TO 990MW  Kariba North Bank- 600MW TO 720MW  Additional capacity:- 210MW ZESCO to accelerate PRP -complete Kafue Gorge December complete Kariba North Bank March 2009  Similar projects being undertaken at regional level SHORT TERM STRATEGIES cont’d

PROMOTING ENERGY EFFICIENCY STRATEGIES - USE OF CFL’s Suspension of duty and VAT Partnerships with retailers Encourage use by consumers 8/30/2015

Save 80% USE OF ENERGY SAVING lamps – Compact Flourescent Lamps (CFLs).. Dimmer Switchers INDOOR LIGHTING: Hotels, Homes 8/30/2015

INCANDESCENT VS ENERGY SAVER BULB TYPE OF BULB WATTAGE100W18W AVERAGE COSTK 2,000.00K AVERAGE LIFE SPAN6-12 MONTHS 5-6 YEARS AVERAGE ENERGY USED PER MONTH (for 3 bed room home 6HRS/DAY) 144kWh25.92kWh COST OF ENERGY USED PER MONTH (CURRENT TARIFF K70/kWh) K12,384.00K2, /30/2015

METER INSTALLATION PROGRAMME Prepaid meter installed in Lusaka-22,000 Further 60,000 in Phase 2 of Lusaka 65,000 in Copperbelt 70,000 in other urban areas by 2010 Reduction in non-technical losses Increased Energy savings 8/30/2015

ENERGY MANAGEMENT RESIDENTIAL SWITCHING OFF APPLIANCES e.g GEYSERS,SWIMMING POOL PUMPS, SECURITY LIGHTING,DEEP FREEZERS, BOREHOLE PUMPS etc.. DURING PEAK LOAD TIMES SET GEYSER 60 DEG. CORRECT INSULATION 8/30/2015

MANAGING GEYSERS Switching off 2kw geysers between hrs 24hrs K170,000 10hrs Savings-K121,000 Switching off 3kw geysers between 07-21hrs 24hrs 10hrs Savings-K138,000 8/30/2015

SECURITY/OUTDOOR LIGHTING HOMES, HOTELS, INDUSTRY Save 80% by replacing ML 160w with Master Ecotone 45w/65w lamps

COMMERCIAL INSTALL ROOM OCCUPANCY SENSORS – to switch off lights & air-conditioning in unoccupied rooms INSTALL POWER FACTOR CORRECTION EQUIPMENT (where lots of electric motor are in use) REPLACE ORDINARY BULBS WITH ENERGY SAVERS (CFLs) REPLACE MERCURY VAPOUR LAMPS WITH METAL HALIDE LAMPS (45W/60W FOR 160W) FOR OUTDOOR LIGHTING

ROOM OCCUPANCY SENSORS INSTALL IN EACH ROOM SWITCHES OFF LIGHTS & AIRCONS IN UNOCCUPIED ROOMS

INDUSTRIAL INSTALL ELECTRIC MOTOR OPTMISERS ON BIG MOTORS USE Variable Speed Drives (VSDs) for pulley coupled drives INSTALL POWER FACTOR CORRECTION EQUIPMENT(CAPACITOR BANKS) DO NOT START ALL YOUR MACHINES AT THE SAME TIME TO AVOID CREATING LOCAL PEAK LOADS ARREST ALL COMPRESSED AIR LEAKS INSULATE ALL STEAM PIPES CORRECTLY

Intelligent because it matches power input to shaft load Saves up to 40% energy Has inbuilt soft start/stop Reduces inrush currents 8/30/2015 INTELLIGENT MOTOR CONTROLLERS

Floor mounted Capacitor Bank Power factor correction Reduces KVA input Save up to 15% energy

VARIABLE SPEED DRIVES (VSD) SAVE UP TO 15% ERNEGY

STREET LIGHTING : USE METAL HALIDE LAMPS REPLACE THE INEFFICIENT MERCURY VAPOUR LAMPS WITH METAL HALIDE LAMPS 400W/250W MV LAMPS WITH 160W METAL HALIDES METAL HALIDES HAVE INBUILT SENSORS TO RUN DIM WHEN NO TRAFFIC ON ROAD ENHANCED BRIGHTNESS

REVISED SAPP PROJECTIONS 2005 TO 2020

 INCREASE GENERATION CAPACITY BY BUILDING NEW PLANT Zambia has an estimated hydro power potential of 6,000MW of which less than 2,000MW has been harnessed. Sites yet to be developed include Kafue Gorge Lower, Itezhi Tezhi, Kalungwishi, Mambilima, Batoka Gorge, Devil’s Gorge, Kabompo, etc II.MEDIUM TO LONG TERM STRATEGIES

 In Zambia planned projects include the following ZESCO projects:  Itezhi Tezhi -Capacity120MW -Cost US$250Million -Implementation 2008 – 2012  Kariba North Bank Extension -Capacity:360MW -Cost:US$300Million -Implementation:2008 – 2012 MEDIUM TO LONG TERM STRATEGIES cont’d

 INCREASE GENERATION CAPACITY BY BUILDING NEW PLANT  Other planned projects in Zambia include:  Kafue Gorge Lower600 – 750MW  Maamba(Coal fired)300 – 450MW  Similar projects planned or in progress at regional level MEDIUM TO LONG TERM STRATEGIES cont’d

 REGIONAL INTERCONNECTIONS TO OTHER UTILITIES (TO SHARE REGIONAL GENERATION CAPACITY)  Existing -Zambia – Zimbabwe:2 x 330KV -Zambia – DRC:1 X 220KV  Planned -Livingstone – Hwange (Zimbabwe):1 x 330KV -Livingstone – Katima Mulilo (Namibia):1 x 220KV (Phase 1 on Zambian side complete, phase 2 in Namibia in progress) -Kafue – Livingstone:upgrade existing 220KV to 330KV -Zambia – DRC:1 x 330KV -Zambia – Tanzania – Kenya:double circuit 330KV - Planned interconnectors between Other planned projects in Zambia include:  Kafue Gorge Lower600 – 750MW  Maamba(Coal fired)300 – 450MW  Similar projects planned or in progress at regional level MEDIUM TO LONG TERM STRATEGIES cont’d

Map of Southern Africa Equator 45

6.CONCLUSION  Power sector crucial to dynamic economic growth  Massive investments required in power sector  Cost reflective tariffs an important element in all efforts  Demand Side Management crucial to manage deficit  The task is heavy but not insurmountable  Need for all stakeholders to play their part

THANK YOU