Scheduled Versus Event Driven Testing of Distribution Protection IEDs Dr. Alexander Apostolov, Benton Vandiver, Will Knapek, OMICRON electronics.

Slides:



Advertisements
Similar presentations
Testing of IEC Based Protection Systems
Advertisements

Utilizing IED Capability to Reduce Wiring Terrence Smith, GE Digital Energy Multilin Richard Hunt, GE Digital Energy Multilin Jakov Vico, GE Digital Energy.
Electrical Installation
1S25 Arc Fault Monitor. 1S25 Arc Fault Monitor 1S25 Arc Fault Monitor Electrical arc short circuits in metal clad switchgear may occur for many different.
1. Four LLs were published in February Transmission Relaying – Undesired Blocking 2.Lack of Separation for Critical Control Power Supply Leads.
Inspection & Preventive maintenance of breakers
Model H Free Standing Static Transfer Switch. Why choose a model H static transfer switch? Increases power availability. True solid state. Rugged, reliable.
Model W Wall Mount Static Transfer Switch. Why choose a model W static transfer switch? Increases power availability. Integrated maintenance bypass. True.
VAMP 300 IED functionality Feeder relay Motor relay
Model B1 19-inch Rack Static Transfer Switch. Why choose a model B1 static transfer switch? Increases power availability. True solid state. Rugged, reliable.
Fuses vs Circuit Breakers for Low Voltage Applications
Motor Starter Coordination
RMM Systems, LLC By Sam Rietta RMM Systems, LLC is a manufacturer's representative firm focused on providing value added sales solutions by providing.
NERC Lessons Learned Summary December NERC lessons learned published in December 2014 Three NERC lessons learned (LL) were published in December.
Protection and Relay Schemes. Agenda  Introduction of Protective Relays  Electrical System Protection with Protective Relays  Conclusion.
Graphic Symbol Location 1. DIN Terminal X52 The machine is powered by electricity using copper cable with 5 wires (3 phase wires + neutral wire +
FP5000 Refer to for the latest information on this constantly evolving productwww.eatonelectrical.com.
Megger - Substation overview product groups, 2600 products.
SYMAP-BC SYMAP-BC.
Generator Management Relay
EAS Lessons Learned Summary Lessons Learned Published in May 2014.
The Islamic University of Gaza
September 2014 Lesson Learned Summary. September 2014 LLs 2 Three NERC lessons learned (LL) were published in September 2014 LL Redundant Network.
The Association of Electrical and Medical Imaging Equipment Manufacturers Understanding GFCIs Developed by the NEMA 5PP Personnel Protection Technical.
1 PCA2 On-load Protection Condition Analyser. 2 PCA2 online testing concept Concept introduction: PCA2 is a new system test approach intended to save.
Lucas Phillips Anurag Nanajipuram FAILURE MODE AND EFFECT ANALYSIS.
During a mains supply interruption the entire protected network is dependent on the integrity of the UPS battery as a secondary source of energy. A potential.
1 Lesson 3 Computer Protection Computer Literacy BASICS: A Comprehensive Guide to IC 3, 3 rd Edition Morrison / Wells.
Chapter 14: Inspection and Maintenance
INTEROPERABILITY Tests IOP11/ IEC Interoperability with IEC IEC INTEROPERABILITY BETWEEN ABB, ALSTOM and SIEMENS STATUS REVIEW.
1 Industrial Systems A dvanced L ine P rotection S ystem.
G650 Generator Protection & Control System
Copyright © SEL 2009 Then Versus Now: A Comparison of Total Scheme Complexity Bob Morris, Roy Moxley, and Christina Kusch Schweitzer Engineering Laboratories,
Electrical Installation 2
Adaptive Protection of Distribution Feeders Alexander Apostolov, Benton Vandiver.
ea technology Effective Condition Assessment of MV Switchgear
1 Lesson 3 Computer Protection Computer Literacy BASICS: A Comprehensive Guide to IC 3, 3 rd Edition Morrison / Wells.
NERC Lessons Learned Summary April NERC lessons learned published in April 2015 Two NERC lessons learned (LL) were published in April 2015 LL
Frankfurt (Germany), 6-9 June 2011 EL-HADIDY – EG – S5 – 0690 Mohamed EL-HADIDY Dalal HELMI Egyptian Electricity Transmission Company Egypt EXAMPLES OF.
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
A smart signalling system for Indian railways Smart signalling system – user’s view Full capacity realisation Flexibility of movements Easy to operate.
Need for protection Power system must be kept in operation continuously without major breakdowns This can be achieved in two ways: 1.Implement a system.
Fundamentals I: Accounting Information Systems McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Risk Management & Corporate Governance 1. What is Risk?  Risk arises from uncertainty; but all uncertainties do not carry risk.  Possibility of an unfavorable.
FACILITATOR Prof. Dr. Mohammad Majid Mahmood Art of Leadership & Motivation HRM – 760 Lecture - 25.
Situational Awareness UPDEA - Workshop. Awareness of the Situation 25,623 Alarms in 8 Hours 53 Alarms / min (average) 80% Are consequential Things to.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
Utility Engineers, PC.  Generation  Transmission  Distribution.
Alain Schenk, Switzerland, ALPHA 3, Block 3.1, Selected paper Barcelona May ASSESSMENT OF PROTECTION SCHEMES: A KEY FACTOR FOR RELIABILITY.
NERC Lessons Learned Summary LLs Published in September 2015.
"... To design the control system that effectively matches the plant requires an understanding of the plant rivaling that of the plant's designers, operators,
Modern Maintenance. Management
E.Sbrissa EP/TA3 - IC ATLAS EDR_MAG Magnet Project Fault analysis, QA & Failure rate.
Distribution Automation The utilization of IEDs (Intelligent Electronic Devices) and advanced communications to unlock the benefits of operational efficiency.
April 7, 2015 Washington, D.C. Area Low-Voltage Event Operations Training Seminar 2016 Erik Johnson System Operations Training (ERCOT)
PROPRIETARY INFORMATION - © 2015 WOODWARD, INC. PAGE 1 HighPROTEC-2 MRI4-2 Feeder Relay Sales presentation 2015/08/10.
HighPROTEC-2 MRA4-2 Directional Feeder Relay Sales presentation
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
Common Problems with Performance/Testing of Batteries
Protection and Relay Schemes
Sub Station.
HighPROTEC-2 MCA4-2 Directional Feeder Relay Sales presentation
Presented by: LADWP November 14, 2017
ABB SACE Maintenance Preventive Maintenance Program
Chapter 7 System Protection
HighPROTEC-2 MRDT4-2 Transformer Protection with differential Sales presentation 2015/08/10.
Wojciech Szela, Edward Gdowik – PECO
Agenda Introduction of Protective Relays
Reduce Customer Down Times to a Maximum
Fuses vs Circuit Breakers for Low Voltage Applications
Presentation transcript:

Scheduled Versus Event Driven Testing of Distribution Protection IEDs Dr. Alexander Apostolov, Benton Vandiver, Will Knapek, OMICRON electronics

Page: 2 Conventional Fault Clearing System

Page: 3 Maintenance (Event-driven) Testing Requirements –In case of events: –Incorrect protection system operation –Failure to operate –Undesired operation –Testing requirements to: determine the reason for the maloperation confirm that a required corrective action has been successfully implemented

Waveform Replay

Fault Simulation

Page: 6 Preventive Maintenance Testing Versus Monitoring –Care and servicing by company personnel for the purpose of maintaining the components of the fault clearing system in satisfactory operating condition –Systematic inspection and testing in order to determine problems with the relays or other system components and prevent their failure to operate when necessary.

Page: 7 Preventive Maintenance Testing Versus Monitoring –Risks such as equipment failure or human errors that may lead to problems bigger than the eventual benefit from scheduled testing –Significant number of monitoring functions available in advanced multifunctional protection intelligent electronic devices

Page: 8 Existing Systems It’s time to re-evaluate the fault clearing system to optimize the test process as new technologies are integrated. Areas to consider: –CT and VT circuit supervision –CB and Trip circuit supervision –Analog inputs supervision –Power Supply supervision –Communication channel supervision –Relay availability / health supervision

Page: 9 Monitoring Functions of the IED CT and VT Circuit Supervision Logic for monitoring the individual phases to determine the circuit integrity (CT Failure logic) Operational conditions such as blown fuses (LOP) Analog Input supervision is also possible where conditions such as, –abnormal phase imbalance (a ratio error) –unexpected sequence components appear (when 3-Ph balanced system conditions are expected) –stub bus logic, or pole dead logic

Page: 10 Monitoring Functions of the IED CB and Trip Circuit Supervision Traditional trip circuit supervision Monitor the performance of the CB for accumulated duty (total interrupted current kA) Slow Operation Pole Disagreement Flashover Logic Breaker Failure (BF) Logic.

Page: 11 Monitoring Functions of the IED Power Supply Supervision Station Battery Conditions such as: –Loss of DC –Reduced Operating Voltage –Relay Power Supply Trouble / Failure –Redundant Supply Failover Scheme Communication Channel Supervision –Monitoring by guard, check-back, or watch dog –Failover to backup system or scheme

Page: 12 Monitoring Functions of the IED Relay Availability / Health Supervision Self Diagnostics as internal health monitor (A/D, Main & Sub Processors, Memory, Operating System, Firmware, Output Controller, etc.) Fail Safe Alarm and remedial action taken Time stamped events log with error codes

Page: 13 Once Commissioned, What’s Next? Define what a Scheduled Test consists of –If Settings or Firmware is changed – test with same test plan used for commissioning (or subset) [No Ad Hoc testing, eliminate variables, H errors] –Exercise relay output contacts, verify 52b operates –Visual inspection of wiring, insulation, terminals –Event file, Logs, Waveform Capture, Metering –File compare of IED to source settings file –Testing interval determined by Reliability Counsel, critical asset, events Under any circumstance, NEVER change a setting to perform a Scheduled or Routine test – this violates the integrity of the commissioned IED and requires re- commissioning it.

Page: 14 What Scheduled Tests Are Required? They differ by the type and vintage of Protection Relay, (its importance to the system, its economic impact if it fails) and what impact those tests have on the commissioned status of the relay. E/M relays should be tested according to Mfg recommendations and schedules E/M relays are affected by their environment. Oxidation, moisture, dust, insulation breakdown, mechanical wear, vibration, and tolerance adjustments require routine attention Any changes to E/M relays prompt re-commissioning

Page: 15 What Scheduled Tests Are Required? Static relays which are not fully digital can have extended test intervals over E/M relays as the environmental and mechanical weaknesses are removed by design Due to switches, potentiometers, and variable resistors, they should be tested according to the Mfg requirements to maintain calibration Routine checks are needed to verify availability and health Any changes should be treated as re-commissioning

Page: 16 IEC Based System

GOOSE Page: 17

Page: 18 Conclusions Maintenance testing plays an important role in the asset management of IEDs Proper use of all monitoring functions allows a significant reduction in the requirements for scheduled testing and covers not only the protection devices themselves, but also other components of the fault clearing system IEC plays an important role and allows reduction of the maintenance tests