Tenix Defence Systems Paperless Contracting: from Concept Development to Capability Deployment Using DCMS* and SGML/XML Technology in the Documentation.

Slides:



Advertisements
Similar presentations
WG 2 (data exchange) During the transitional period and till the Single Authorisation electronic information and communication system is implemented,
Advertisements

Integrated Project Management IPM (Without IPPD) Intermediate Concepts of CMMI Project meets the organization Author: Kiril Karaatanasov
Configuration management
Software change management
Configuration management
A BPM Framework for KPI-Driven Performance Management
Supplier Contract Management © 2006 Oracle Corporation – Proprietary and Confidential 2. Author & Negotiate 5. Amend4. Monitor and Track 6. Renew & Closeout.
Microsoft Business Value Planning Services Microsoft has launched a new Software Assurance benefit to help customers identify, unlock, and capture the.
HP Quality Center Overview.
Chapter 2 The Software Process
Extracting data from reports into Excel What is involved in mining report data for Excel? What is involved in mining report data for Excel? Why export.
ITIL: Service Transition
Improving Process for Better Software. Who We Are An experiential learning program that provides technology solutions for our partners, and real- world.
Software Engineering General Project Management Software Requirements
8 Systems Analysis and Design in a Changing World, Fifth Edition.
© 2008 Prentice Hall11-1 Introduction to Project Management Chapter 11 Managing Project Execution Information Systems Project Management: A Process and.
Project Execution.
Igal Kaptsan Research Director Applied Research, Bentley Systems Change Management.
1 PMIG PUBLIC SECTOR PROCUREMENT BEST PRACTICES & LESSONS LEARNED Kevin James Barrie Kroukamp.
Symposium on "The Effectiveness of Modelling and Simulation” MSG-031 Briefing on Progress so farPoland, 13 October 2005 Progress to date on NMSG 031 The.
CS 4310: Software Engineering
Construction Category Management Planning Version 1.1 (May 2015)
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
© VESP International Pty Limited To Contents Slide CLICK to advance slides/ bullet points within slides Integrated Master Planner An Overview.
The MEDIN “Data Clause” –Good data management is essential if data are to be re- useable. – Often data management is only considered as an afterthought,
CS 360 Lecture 3.  The software process is a structured set of activities required to develop a software system.  Fundamental Assumption:  Good software.
Fundamentals of XML Management Greg Alexopoulos Systems Engineer Documentum.
© 2002 Thought Process Associates Ltd. All rights reserved. A library management system to support the re-use of information from.
Configuration Management (CM)
An Integrated Control Framework & Control Objectives for Information Technology – An IT Governance Framework COSO and COBIT 4.0.
IT Requirements Management Balancing Needs and Expectations.
Lecture 11 Managing Project Execution. Project Execution The phase of a project in which work towards direct achievement of the project’s objectives and.
Development Process and Testing Tools for Content Standards OASIS Symposium: The Meaning of Interoperability May 9, 2006 Simon Frechette, NIST.
1 Schema Registries Steven Hughes, Lou Reich, Dan Crichton NASA 21 October 2015.
Customer Story Leggett & Platt’s Enterprise Procurement System.
Georgia Institute of Technology CS 4320 Fall 2003.
DITA Single Source technology. What is Single Source? Single source technology is a concept of publishing documents when same content can be used in different.
XML Working Group Joan Ugljesa NDIA PMSC May 3,
Practical Experiences With the Adoption of XML in Commercial Publishing Richard Kidd Neil Hunter
Introduction Procurement of Consultant Services (based on PPA 2004 and Best Practices) Presented by: NM Lema Macrh, 2013.
Health eDecisions Use Case 2: CDS Guidance Service Strawman of Core Concepts Use Case 2 1.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 1 Diploma of Project Management.
The IBM Rational Publishing Engine. Agenda What is it? / What does it do? Creating Templates and using Existing DocExpress (DE) Resources in RPE Creating.
HP PPM Center release 8 Helping IT answer the tough questions
BSBPMG404A Apply Quality Management Techniques Apply Quality Management Techniques Project Quality Processes C ertificate IV in Project Management
Modularization Also Known As: reuse, single sourcing, structured authoring What is it? Breaking down content into smaller chunks that can be reused in.
Component: Support Services Financial & Supply Chain Management Date : 16 September 2015 Presenter: MC Skenjana Ideal Clinic Realisation.
Software Development Process CS 360 Lecture 3. Software Process The software process is a structured set of activities required to develop a software.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
XML 2002 Annotation Management in an XML CMS A Case Study.
Microsoft Dynamics GP Paperless Automation David Adams Channels Sales Support Manager The Challenges, Benefits & Value.
Open Interchange Consortium XZIG /11/12 1 XML & E-COMMERCE SPECIAL INTEREST GROUP (XZIG) 18: :00 Tue 12/11/2002 Stream: E-commerce Tenders.
Systems Analysis and Design in a Changing World, Fifth Edition
ITIL: Service Transition
Microsoft Dynamics GP Paperless Automation
The Five Secrets of Project Scheduling A PMO Approach
Systems Analysis and Design in a Changing World, 4th Edition
Object-Oriented Software Engineering Using UML, Patterns, and Java,
Enterprise Content Management Owners Representative Contract Approval
Content & the Supply Chain
The Organizational Context
General Services Department
Chapter 2 – Software Processes
Presented to Department of Information Technology February 24, 2010
Health Ingenuity Exchange - HingX
Store Opening Management
HingX Project Overview
Project Procurement Management
General Services Department State Purchasing Division
Presentation transcript:

Tenix Defence Systems Paperless Contracting: from Concept Development to Capability Deployment Using DCMS* and SGML/XML Technology in the Documentation Cycle DCMS = Document & Content Management System

Documentation Cycle

Templ3.ppt (Presentation Template) 3 Tenix Defence Systems Existing Defence Doco Processes  Expensive:  DAO budget ~ 2% of Defence Acquisition Budget  Prime’s Doco ~ 10% of contract price (e.g. ANZAC)  Doco for failed tenders must be amortised across those won  Doco for hundreds to thousands of subcontracts/POs  Costs too much time:  3-5 years from capability concept to contract  Concept doco  EOI  design study  tender  contract  1-5 years from contract to first capability delivery  Contract  subcontracts  engineering  production

Templ3.ppt (Presentation Template) 4 Tenix Defence Systems Existing Acquisition Processes  Risky  Inefficient evaluation of bid responses against requirements (time, access to relevant source docs)  Inadequate capture of negotiation contexts  Clauses  Amendments  Specifications  Difficulties connecting clauses to source data  Difficulties associating reports with requirements  Problems more difficult and costly to fix if not recognised early

Templ3.ppt (Presentation Template) 5 Tenix Defence Systems Problem Areas (cost & risk)  Authoring and assembling paper documents  Cost to discover and reuse existing knowledge  Cost and time to chase paper or reinvent the wheel  Difficult to learn from previous mistakes  Cumbersome/inadequate version and release controls  Existing word processing technology is unsuitable  Limited capabilities to enforce content and format standards  Style and other WP related conflicts cause system crashes when multiple authors work on the one document  Author expertise and time wasted on formatting  Cost of lost work and rework

Templ3.ppt (Presentation Template) 6 Tenix Defence Systems Problem Areas (cost & risk)  Circulating paper  Paper moves at snail-mail pace  Paper processes fundamentally sequential not parallel  Paper easily held up or lost: can delay or abort review process  Fragmentation and re-assembly for review problematic  Tracking, controlling and auditing paper  Can’t readily track progress or location of paper documents  Limited capacity to record contexts against paper content  No capability to maintain cross links from paper content to other documents or contractual requirements  Problems reading, manually administering and circulating reports

Tenix Defence Systems SOLUTION: ELIMINATE PAPER! PROGRESS ELECTRONIC DOCUMENTS AT LIGHT SPEED!

Templ3.ppt (Presentation Template) 8 Tenix Defence Systems US Paperless Contracting  $US 400+ M Standard Procurement System (SPS)  Major business analysis published to Web  Bespoke technology requiring dedicated hardware & systems  Based on American Management Systems Inc’s Procurement Desktop  SPS Probably the wrong type of solution for Australia  Too expensive  Too rigid  Not easily adopted by overseas or Australian suppliers  We can solve many of the same problems for a tiny fraction of the cost by establishing appropriate standards and generic applications

Templ3.ppt (Presentation Template) 9 Tenix Defence Systems Enabling Generic Technologies  Requirements development & tracking systems  Structured authoring (SGML/XML editors)  Document Type Definitions (DTDs) define & control document structure  Document structure determines formats, not author  Replacing MS Word with a structured editor might cut authoring costs by 50%  Document & content management systems (DCMS )  Vault (version and release controls)  Electronic workflow management  Structured query facilities  Component management and reuse  Tracking, reporting and audit capabilities  2-way link management

Templ3.ppt (Presentation Template) 10 Tenix Defence Systems Supporting Standards  Develop DTD (schema) standards to support the technology  DTDs can map document content to capability requirements  DTD control facilitates document component discovery and reuse  DTD control facilitates document assembly, fragmentation and re- assembly as required to facilitate review, evaluation and reporting  DTDs can encompass capability request and supplier response within the same container element to maintain 1:1 relationships between requirements and responses  Appropriate DTDs can maintain the 1:1 requirement to content relationship through all tiers of the supply chain  DTD derived styles and templates can even help tame MS Word

Templ3.ppt (Presentation Template) 11 Tenix Defence Systems Structured Authoring  Reduce document creation costs  Standardise content structure and presentation  Separate content development from formats  Find and safely re-use existing content  Flow-down content to form contract documents  Accrue savings from the whole supply chain:  Acquisition authority  Prime contractors  Lower tiers

Templ3.ppt (Presentation Template) 12 Tenix Defence Systems Progress At Light Speed  Automate review and signoff  Edit, review and approve docs via electronic workflows  Automate evaluations  Fragment, reassemble and circulate for review and analysis  Eliminate ‘paper chases’  Powerful searching of electronic content  Track progress and locate circulating documents at any time  Reduce cycle time from concept to delivery  Commerce at Light Speed vs snail mail

Templ3.ppt (Presentation Template) 13 Tenix Defence Systems Automate Monitoring & Audit  Maintain direct links between requirements tracking tool and document content  Automate tracking of supplier responses and performance against specific requirements  Automate reporting against specific requirements  Record and track annotations to tender responses and other documents  Achieve more detailed oversight sooner

Templ3.ppt (Presentation Template) 14 Tenix Defence Systems LOWER TIER PRIME DAO PRIME LOWER TIER NAVY ARMY RAAF PROTOTYPE selected doc types RFTRFT RESPONSERESPONSE CLIENT REQUIREMENTS CONTRACTCONTRACT LOWER TIER PRIME Proposed Demonstration Project  Structural concept DAO PRIME LOWER TIER NAVY ARMY RAAF PROTOTYPE selected doc types RFTRFT RESPONSERESPONSE CLIENT REQUIREMENTS CONTRACTCONTRACT STANDARDS DTDs, Schemas, Word templates for selected doc types

Templ3.ppt (Presentation Template) 15 Tenix Defence Systems Demonstration Project  Prototype enabled by existing technologies  Requirements tracking  Tenix: XTie  DAO: DOORS?  SGML authoring (Defence & many suppliers already own technology)  FrameMaker+SGML  ArborText Adept/Epic  XMetaL  DCMS  Tenix: existing SIM (RMIT) installation  Boeing: existing Parlance (XyEnterprise) installation  DAO: support for trial implementation?  MS Word  Everyone

Templ3.ppt (Presentation Template) 16 Tenix Defence Systems Demonstration Project  Proposed roles and responsibilities for prototype  DAO:  Sponsor project and help identify sources of funding  Acquisition management subject matter experts  DEFPUBS? DTD / MS Word template analysis & design  Tenix/other AIDN members:  Prime supplier/lower tier subject matter experts  SIM environment  Aspect/RMIT/other DCMS suppliers?  Project management  System integration  DCMS consulting & R&D

Templ3.ppt (Presentation Template) 17 Tenix Defence Systems Demonstration Project  Next Steps  DAO/Defence expression of interest and sponsorship  Establish joint working party  Determine sources of funding  /Vic Dept State & Regional Development has already indicated verbally that they would consider a request to provide some seed money.  Formalise and submit proposal