ENGINEERING DESIGN A-001. ENGINEERING DESIGN A-002 POND Comal County U.S.281 RODEO DRIVE SPEAKER : AMANDA WATSON.

Slides:



Advertisements
Similar presentations
Golf Course Construction Planning TRF 250 Golf/Sports Field Construction.
Advertisements

Preliminary Design of Galvez Estates Subdivision.
TRAILS AS TRANSPORTATION Design & Construction Michael J. Kubek, P.E. Ohio Department of Transportation, District 12 Production Administrator.
Locating and Eliminating Illicit Connections June 28, 2006 James Walls.
I-69 Strategic Planning Corridor Study: Fulton To Eddyville, KY Fulton, Hickman, Graves, Marshall, Livingston, Lyon Counties Public Meeting November 15,
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
Wes Marshall, P.E. University of Connecticut May 2007 CE 276 Site Design Final Exam Outline.
Rockville Strip Mall Presented by ScarlettENGINEERING.
Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda.
Introduction Transportation System Objectives : Military; Knit together the inhabitants of a territory by providing mutual access and communication; Economic.
SITE & GRADING PLANS CHAPTER 6. SITE ANALYSIS: DRAINAGE TRAFFIC (VEHICULAR, PEDESTRIAN, TRANSPORTATION) WEATHER (RAIN, SUN, SNOW, WIND) VICINITY NEIGHBORHOOD.
Worksession Crash Impediments Ordinance Orange County BCC May 5, 2015.
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
Sustainable Water Infrastructure Ivy Anderson Andey Nunes.
Design for Water Quality CE 365K Hydraulic Engineering Design Spring 2015 David R. Maidment.
Engineering and Technical Plans Description, process and standards Dh 2005.
Prepared for: NEW YORK STATE PLANNING FEDERATION April 14, 2015 Prepared by: BME ASSOCIATES Peter G. Vars, P.E. Essential Skills: Reading and Interpreting.
Master Plan Update Chapter 213 of the Local Government Code provides that Cities may engage in Comprehensive Planning which may:  include but not be limited.
Green Building Residential Construction
Presents Project Crimson March 1, 2006 Sarah Grace Cade Harrelson Cochrane Jamison Libby Probst Justin Williams.
Team Tech meeting May 22, 2006 State Traffic Commission & DEP Storm Water Permitting State Traffic Commission Permitting & Storm Water Permitting State.
© 2006 ITT Educational Services Inc. CD230 Architectural Design & Drafting: Unit 10 Slide 1 Unit 10 Commercial Construction.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Sustainable Design Chad Sims Jason Sells.
Community Development Department ISLAND WALK REZONING REQUEST APPLICATION #2648.
JUNE 19, 2012 BCC APPEAL HEARING ON BZA #SE , April 5, 2012 APPLICANT/APPELLANT: TONY RAHBANY.
WRIGHT ENGINEERING BY: CHAMPION HEIGHTS COMMERCIAL BUILDING ERIC BEALS RYAN KRAUSE CAMERON MILLER RANDY RODRIGUEZ HORACIO MONTEJANO.
Access Management: South Carolina’s Experience Rick Werts Director of Traffic Engineering South Carolina Department of Transportation.
Community Development Department FUTURE LAND USE MAP AMENDMENT SMALL-SCALE LU-MIN & ZONING MAP AMENDMENT RZ-OTH
Chapter 33 Dam Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Give reasons why.
Quality Avenue “Safe Streets” Improvements City of Lakeland, Minnesota Paul Pinkston Hamline University August 18, 2015.
Community Development Department FUTURE LAND USE MAP AMENDMENT SMALL-SCALE LU-MIN & ZONING MAP AMENDMENT RZ-OTH
TAOYUAN ENVIRONMENTAL SCIENCE & TECHNOLOGY PARK BUSINESS INVITATION SEMINAR PRESENTATION OF PREFERENTIAL MEASURE & COUNSELING ENVIRONMENTAL PROTECTION.
FEBRUARY 21, 2012 BCC PUBLIC HEARING ON BZA # SE , Nov. 03, 2011 APPELLANT/APPLICANT: CHANTEL PRESTON.
Evaluation and Redesign of Rojeeb Street. Objectives ▪ Evaluation of existing conditions of Rojeeb Street. ▪ Estimation of future conditions of Rojeeb.
Planning Construction Chapter 15. Private Sector  Most buildings and other structures are built for ordinary people. These people make up the private.
November 11, 2008 BCC PUBLIC HEARING ON BZA #SE , September 4, 2008 APPLICANT/APPELLANT: Christian Haitian Church, Inc.
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
(Continued from May 22, 2007) BCC PUBLIC HEARING ON BZA # SE , 4/5/07 APPLICANT: Knowledge Tree Learning Center June 26, 2007.
Energy Huntsville Opportunity Report and Government Collaboration February 2016.
Community Development Department Special Exception Vehicle Rental and Leasing St. Joe Plaza.
Permit Process & Application Guide
Chapter 3 Facility Design and Construction. Chapter Objectives 1.Describe the process of facility design and construction 2.Demonstrate proficiency in.
“State Road 100 MPC Lots” Comprehensive Plan Amendment & Rezoning City Council Public Hearing November 17, 2015.
Fundamental Concepts for Design of Special Hazard and Fire Alarm Systems Chapter 1.
Community Development Department Neoga Lakes Future Land Use Map (FLUM) Amendment.
Comprehensive Thinking and Planning
Texas Commission on Environmental Quality. SUBCHAPTER A GENERAL PROVISIONS SUBCHAPTER B GENERAL REQUIREMENTS FOR THE PRODUCTION, CONVEYANCE, AND USE OF.
Community Development Department FUTURE LAND USE MAP AMENDMENT SMALL-SCALE LU-MIN-07-03a & ZONING MAP AMENDMENT RZ-OTH
Ordinance 480-YYY Modifications to Zoning Ordinance 480 regarding On-Site Sewage Facilities (OSSF)
Parking Lot Design Civil Engineering and Architecture
LIFE CYCLES OF AIKEN COUNTY PUBLIC SCHOOLS CONSTRUCTION PROJECT October 8, 2013.
Texas Commission on Environmental Quality
Urban Runoff Pollution Ordinance 2017 Proposed Update
CROSS CONNECTION CONTROL PROGRAM
Sustainability Assessment of Family House - Case Study
Design of a Commercial Shopping Center
Commercial Office Building
Wangard & Reinders Family Multi-Family Development
Design of a Commercial Shopping Center
Parking Lot Design Civil Engineering and Architecture
The sport hall.
Regulation Amendment AM April 3, 2018.
Commercial Office Building
Competency: Create site plan drawings
HILL COUNTRY FAMILY FITNESS CENTER
Chapter 6 Site Construction.
Use of Domestic Reclaimed Water
Washoe County Board of Adjustment
CENE 486 CAPSTONE PRESENTATION APRIL 26th, 2019 ANNA KURN  
Presentation transcript:

ENGINEERING DESIGN A-001

ENGINEERING DESIGN A-002 POND Comal County U.S.281 RODEO DRIVE SPEAKER : AMANDA WATSON

ENGINEERING DESIGN A-003 SPEAKER : AMANDA WATSON PROPERTY LINES RUNNING TRACK PARKING 34,000 SQ. FT. BUILDING

LOT 1 : ACRES LOT 2 : ACRES ENGINEERING DESIGN A-004 SPEAKER : AMANDA WATSON LOT 1 LOT 2 U.S.281 RODEO DRIVE

Topography Evaluation – Earthwork Volume sheet yielding proper amounts of cut and fill to be performed final elevation plans of finished grade – Design to be in accordance with County Building Codes and Texas Storm Water Pollution Prevention Plan (TPDES). – This task to be done in conjunction with and consideration of the drainage and environmental design task. - ENGINEERING DESIGN A-005 SPEAKER : JOSH HERRINGTON

All Design will be done in accordance with: – Permeability and runoff/ drainage concerns – State and Local building restrictions – ADA compliance and the State of Texas Architectural Barriers Act, Texas Accessibility Standards (TAS) – Fire Marshal’s restrictions ENGINEERING DESIGN A-006 SPEAKER : JOSH HERRINGTON

Design will include: – Type of paving method/ materials to use – Maximum # of parking spaces combined with maximum traffic maneuverability – Proper site lighting – Appropriate signage and ground paint ENGINEERING DESIGN A-007 SPEAKER : JOSH HERRINGTON

Traffic Counts PHF Critical Lanes LOS Traffic Demand Analysis No. Lanes Shoulder width Sight Distance Speed Limits Traffic Signs Existing Geometric Layout Number of Trips Generated TxDOT Traffic Volumes Expected Traffic Growth Rate Traffic Forecast Traffic Analysis (Existing + Forecasted) LOS Traffic Impact Background AnalysisImpact Analysis ENGINEERING DESIGN A-008 SPEAKER : ARMANDO GOMEZ-FARIAS

Recommendations and Design – Drive Way (1 Lane Inbound / 1 Lane Outbound) Access point from Rodeo Drive to Site – Acceleration / Deceleration Lanes TxDOT Access Management – Modification to existing roadway Sight Distance / Sight Triangle  AASHTO Traffic Signs – Permits HWY 281 RODEO DR. Access Point ENGINEERING DESIGN A-009 SPEAKER : ARMANDO GOMEZ-FARIAS

CONTRIBUTING ZONE PLAN EDWARDS AQUIFER VIEWER MAP SITE LOCATED WITHIN THE EDWARDS AQUIFER CONTRIBUTING ZONE CZP SUBMITTED TO TCEQ ENGINEERING DESIGN A-010 SPEAKER : AMANDA WATSON SITE

CONTRIBUTING ZONE PLAN STORMWATER POLLUTION PREVENTION PLAN FEMA FLOOD INSURANE MAP VIEWER SITE NOT WITHIN 100-YEAR FLOOD BOUNDARIES TEXAS POLLUTION DISCHARGE ELIMINATION SYSTEM ENGINEERING DESIGN A-011 SPEAKER : AMANDA WATSON

ON-SITE SEWAGE FACILITY WATER ELECTRICITY TCEQ CHAPTER 285 & COMAL COUNTY DESIGN REGULATIONS ENGINEERING DESIGN A-012 SPEAKER : AMANDA WATSON

PROPOSED PARKING LOT WATER UTILITY Design water main extensions Hydrant connections Fire Service connections Irrigation and Domestic services ENGINEERING DESIGN A-013 SPEAKER : KAREM ALFARO POWER UTILITY UNDERGROUND SERVICE – Trench, backfill, concrete work Cooperative : Cost Estimate POWER LINE WATER MAIN IRRIGATION DOMESTIC POOL FIRE LINE POWER CONNECTION

ENGINEERING DESIGN A-014 SPEAKER : LIVIER CORONA Design all structural components of the building. – According to the Architect’s Specifications Design by Following Codes: – International Building Code (IBC) 2012 – American Society of Civil Engineers (ASCE) 7-10 – American Institute of Steel Construction Manual (AISC) 2012 – American Concrete Institute (ACI) Pre-Design Analysis – Determination of all Applicable Loads – Structural Analysis (SAP 2000)

ENGINEERING DESIGN A-015 SPEAKER : LIVIER CORONA Structural Design – Materials: Steel, Concrete or Both Geotechnical Engineering Report – Subcontracted to a geotechnical firm – Results reviewed by our company Foundation & Slab Design – Geotechnical Report and Analysis – Pre-Design Analysis – Concrete Foundation SITE COMAL COUNTY

ENGINEERING DESIGN A-016 SPEAKER : ANGELA DE GREEF Structural and Architectural Features Steel Joists are 96% recycled; lowering energy use LED lights with motion detectors Energy efficient windows (triple pane fill with neon gas) Awnings, location of windows; taking advantages of light Supply Potable Water for human consumption Reclaimed water for toilettes flushing and water irrigation Lavender (light purple) Pipes DUAL PIPING SYSTEM

ENGINEERING DESIGN A-017 SPEAKER : ANGELA DE GREEF PERVIOUS CONCRETE High porosity Reduced Runoff Parking areas, Areas with Light Traffic Protect Water Quality XERISCAPING Reduce or Eliminate the Need for Supplemental Water from Irrigation

ENGINEERING DESIGN A-018 SPEAKER : ANGELA DE GREEF SOLAR PANELS Solar Pool Heaters to reduce Swimming Pool Heating Costs Self-sustaining gymnasium, combination of human power and solar energy Electric vehicle charger station

ENGINEERING DESIGN A-019 SPEAKER : JOSH HERRINGTON Meeting 1 Sept.09 Meeting 2 Sept.25 Meeting 3 Oct.17 START Sept.02 FINISH Nov.25

ENGINEERING DESIGN A-020 SPEAKER : JOSH HERRINGTON ADMINISTRATIVE TASKS$ 24,987 SITE GRADING AND PARKING LOT DESIGN$ 45,270 TRANSPORTATION ANALYSIS AND DESIGN$ 30,450 DRAINAGE AND ENVIRONMENTAL ANALYSIS$ 13,412 UTILITY DESIGN AND COORDINATION$ 42,250 STRUCTURAL ANALYSIS AND DESIGN$ 46,250 GREEN DESIGN$ 30,675 TOTAL COSTS$233,294

 Total Cost : $233,294  Design : Sept 02,2013 – November 25, 2013  Require Signature as approval to proceed Thank you very much for your time and attention ENGINEERING DESIGN A-021 SPEAKER : JOSH HERRINGTON