ECE 135 – The Three Presentation 10 Bryan Chavez with Pat Cleary & Kevin Parker April 14 th, 2005 April 14 th, 2005.

Slides:



Advertisements
Similar presentations
Gigabit Ethernet Group 1 Harsh Sopory Kaushik Narayanan Nafeez Bin Taher.
Advertisements

Measurement of Antenna Load Impedance for Power Amplifiers Dongjiang Qiao, Tsaipi Hung, David Choi, Feipeng Wang, Mingyuan Li, and Peter Asbeck The Department.
ECE 201 Circuit Theory I1 Resistors in Parallel Resistors connected at a single node pair Voltage across each resistor is the same.
Gigabit Ethernet PMD Opto-Link, Inc. – Status Report 9 Vinh Nguyen April 14, 2005.
Resistors Electronics 1 CVHS.
Presenter: Kenny Haulk
Gigabit Ethernet PMD Opto-Link, Inc. – Progress Summary Vinh Nguyen, Clifton Kerr, Andrew Meyerson, Bryan Justice April 21, 2005.
7.2.3 Student Book © 2005 Propane Education & Research CouncilPage Identifying Procedures for Measuring Resistance Between Two Given Points in.
Progress Report of Gigabit Ethernet Design ECE 4006A October 18, 2001 Ashley Lee Shaun Rosemond.
Gigabit Ethernet – IEEE 802.3z The Choice of a New Generation ECE 4006c G2- Gigabit Ethernet Intel/Agilent TX Javier Alvarez, gte006r Astou Thiongane,
Gigabit Ethernet EE 164 Group 2 – Presentation 7 Ungtae Lee April 8th 2004.
Work as a team with the people on your table the first table to complete this activity will get to leave first. What you need to do: There are four different.
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1 Presentation 5 – Yashar Pirzadeh.
ECE 135 – The Three Presentation 8 Pat Cleary with Kevin Parker & Bryan Chavez March 24 th, 2005 March 24 th, 2005.
Project GabE ECE 135 – Spring 2005 Final Presentation Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
ECE 135. Opto-Electronics Design Project Spring 2006.
ECE4006 – Final Presentation Group 6, Spring 2003 Gigabit Ethernet Vikas Parekh.
Final Report 1394b:Optoelectronic Data Communications Group G9: Tiffany Lovett, gte291r Tornya Moore, gte668r Mareisha Winters, gte824t ECE 4006C April.
Optical Gigabit Ethernet Group 4 Presentation 3 February 10, 2005 David Larado.
VCSEL High Speed Drivers
Optical Gigabit Ethernet Group F.O.R.E. Final Presentation Chris Abbott, Ronen Adato, David Larado 4/21/2005.
ECE 135 Final Presentation The Three … aka Pat Cleary with Kevin Parker & Bryan Chavez April 21 st, 2005 April 21 st, 2005.
Group 2 - Project Update April 1, 2004 Tyler Helble.
Laser Drive Needs Total laser current –I TOT = I BIAS + I MOD BIAS Current –Keeps I TOT > I TH (laser “on”) –I BIAS – I TH related to speed Modulation.
Gigabit Ethernet PMD ECE135 Group 2 – Presentation 1 Vinh Nguyen January 9, 2005.
Gigabit Ethernet PMD ECE135 Group 2 – Presentation 2 Andrew Meyerson February 3, 2005.
Presenter: Nassisa-Geda Techane. 2 Highlights of the Last Two Weeks Midterm paper done! More tests to be performed on the board –Awaiting calibrated optical.
Implementing a 10 Gb/s VCSEL Driven Transmitter for Short Range Applications Irfan N. Ali Michael C. Clowers David S. Fink Sean K. Garrison Jeff A. Magee.
Gigabit Ethernet PMD ECE135 Group 2 – Presentation 4 Clifton Kerr February 17, 2005.
ECE 4006B Fall, 2002, Group 3, Man Le Progress Report Period (November 15-21, 2002) Finished alignment tolerance testing with Rx board (S7911 and PDT-
ECE4006 Group 6 – Presentation 1 Division of Labor – Vikas Parekh – Group management, project schedule manager, background studies. Gautum Khanna – Analog.
Presenter: Curtis Grens April 3, Highlights of the Last Week Connectorized PD on current board replaced with unconnectorized PD Second board constructed,
Cesar Lugo November 7, 2002 Progress Report (October , 2002) Observed how the eye diagram was affected by changing the bias current of the VCSEL.
Presenter: Kenny Haulk. 2 This Week’s Highlights Tested Receiver with attenuation and shielding Measured power output from GDS1250 TX and our own VCSEL.
Project GabE ECE 135 – Spring 2005 Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
© 2001 By Default! A Free sample background from Slide 1 Optical Ethernet Design Receiver Group G1 David Gewertz Ryan Baldwin.
Task List  Group management plan  Background studies  Link budget: optical/electrical  Build, test learning Rx board  Order components for transceiver.
Receiver Circuit Testing Test setup Eye diagrams BER measurement Eye - BER relationship.
Status Presentation Group 7: 1394b Receiver Aparna Trimurty Stancil Starnes Jeff Shlipf March 28th, 2002.
Gigabit Ethernet TxRx ECE Group 2 – Presentation 4 Andrew Tupper February 26, 2004.
Gigabit Ethernet PMD Opto-Link, Inc. – Status Report 7 Andrew Meyerson March 24, 2005.
Group 2 - Project Update Feb Tyler Helble.
ECE 135 – Group 3 Presentation 4 Bryan Chavez with Pat Cleary & Kevin Parker February 10 th, 2005 February 10 th, 2005.
 As you should have observed from the lab experiment you performed yesterday, there is an inverse relationship between the current and the resistance.
Solar Patio Umbrella Final Presentation May 3 rd, 2016 Team #37 ECE 445 – Spring 2016.
Gigabit Ethernet PMD Opto-Link Inc. – Presentation 6 Bryan Justice March 10, 2005.
Optical Gigabit Ethernet Group 4 February 3, 2005 Ronen Adato.
Gigabit Ethernet – IEEE 802.3z The Choice of a New Generation Design Presentation ECE 4006c G2- Gigabit Ethernet Intel/Agilent TX Javier Alvarez, gte006r.
ECE Group 2 – Presentation 8
Opto-Link, Inc. – Status Report 8 Clif Kerr March 31, 2005
ECE 135 – BtrLaytDanNvr Presentation 7
Kevin Parker with Bryan Chavez & Pat Cleary February 24th, 2005
Capstone Design Update
Melanie Garrick Barry Mullins Nihar Patel Jason Young
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1
All-Synthesizable 6Gbps Voltage-Mode Transmitter for Serial Link
ECE 135 – Group 3 Presentation 1-2
ECE 4006 Group 6 – Presentation 8
Optical Gigabit Ethernet
Capstone Design Update
ECE 135 – VCSEL Kings Presentation 5
Optical Gigabit Ethernet
GIGABIT ETHERNET DESIGN ECE Spring 2004
Project GabE ECE 135 – Spring 2005 Presentation 10
ECE 135 – The Three Presentation 9
Laser Drive Needs Total laser current BIAS Current
Project GabE ECE 135 – Spring 2005 Week 9
Capstone Design Update Week 9 ECE 4006 – Group 1
All-Synthesizable 6Gbps Voltage-Mode Transmitter for Serial Link
Presentation transcript:

ECE 135 – The Three Presentation 10 Bryan Chavez with Pat Cleary & Kevin Parker April 14 th, 2005 April 14 th, 2005

Work Summary Troubleshoot Board 1Γ Soldered Aggressive Tx on Board 1 Tested Aggressive Tx Board 1 Verified Conservative Rx Board 1

GANTT Chart

Troubleshooting Board 1Γ Pots adjusted to high resistance values Replaced VCSEL with 100 Ohm resistor No heating and no blown ferrite beads! Probing showed inputs to the LD clean Outputs of the LD dirty (vague outlines of an eye diagram) Further probing caused a short in the circuit … blew another ferrite bead Replaced ferrite bead … but it blew up again as power was plugged in Cannot locate short in the circuit Low on passives so decided to move on to Aggressive Tx design

Aggressive Tx Modifications Soldered all passives super carefully Used a 25k potentiometer to modulate I bias instead of 1k potentiometer Adjusted the VCSEL orientation for forward-biasing Adjusted pot values to safe levels before testing

Aggressive Tx Probing Laser Driver InputsLaser Driver Outputs Data - Data + Data - Data +

Aggressive Tx Test Setup

Aggressive Tx Results LASING!!!! Adjusting I mod and I bias showed improved results

Aggressive Tx Results (cont.) Working!!!!!!!!

Conservative Rx Test Setup

Conservative Rx Results PRBS7 Pattern 9 dB BER < 10^-11 5 minute duration Proper operation verified!

Future Work Solder Aggressive Rx on Board 1 Test Aggressive Rx on Board 1 Perform Loop-back test Order More Passives Order 2 nd Board Fabrication if necessary