Slide title In CAPITALS 50 pt Slide subtitle 32 pt KPI Reporting and Analysis Templates Naren Mohan

Slides:



Advertisements
Similar presentations
Slide title In CAPITALS 50 pt Slide subtitle 32 pt IMS service composition IPTComm 08, Heidelberg
Advertisements

1 GMPLS RSVP-TE Recovery Extension for data plane initiated reversion and protection timer signalling draft-takacs-ccamp-revertive-ps-04.txt draft-takacs-ccamp-revertive-ps-04.txt.
Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Post Launch Tuning Cingular UMTS.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Seminar on Mobile Services IDATE International Conference Dr. Abdelkrim BENAMAR November 22 nd, 2005.
Layer 3 Messaging and Call Procedures
1 Analysis of NGMN Requirements REQ 9: LTE Parameter Optimization.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt G3X Series Fixed Wireless Terminals for GSM/EDGE Networks.
The Telecom Initiative and WTO Non Tariff Barriers proposals Update May 2009 Per Döfnäs Telefonaktiebolaget LM Ericsson.
Full Service Broadband an Ericsson View of the Future Michael Martinsson Marketing Director Business Unit Networks Ericsson AB.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Ericsson satsning på Public Safety - National Security HIØ Personalseminar – 9. mai 06 - Ed.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Elements for successful partnership between Enterprise and University Ericsson in Croatia case EUPIDE.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt OTP Development update.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Proactive fault management in mobile core network Niko Isotalo Instructor: Ira Antikainen Supervisor:
Slide title In CAPITALS 50 pt Slide subtitle 32 pt BSNL 3G Network Parameters affecting Data Speed
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Consumers’ Awareness of, Attitudes Towards and Adoption of Mobile Phone Security Stewart Kowalski, Ericsson.
Slide title 40 pt Slide subtitle 24 pt Slide title 40 pt Slide subtitle 24 pt Broadband Issues Perspective Mike Furby Systems Engineering Manager Redback.
Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Improved project management practices as a key to the successful IS implementation Željka Požgaj*, Hrvoje.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt E2E IMS Interoperability Test Environment Ali Soujeh Senior Specialist, Interoperability Ericsson.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Site DB creation and updates 05/08/2006 by Performance Team.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Bitstream and Hybrid Model VQEG Meeting, Kyoto, March 2008 Jörgen Gustafsson and Martin Pettersson.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Service requirements from 3GPP TS SDO Emergency Services Coordination Workshop (ESW06) Columbia.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Developing a Testing Process for Remote Usage of Multimedia Messaging Centre Master´s Thesis Presentation.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt ESPA in WCDMA.
1 Analysis of NGMN Requirements REQ 10: Automatic Inventory.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Using TEMS Investigation.
1 Analysis of NGMN Requirements REQ 5: Performance Management in Real-time.
Slide title :40-47pt Slide subtitle :26-30pt Color::white Corporate Font : FrutigerNext LT Medium Font to be used by customers and partners.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt “42” ICT in Ireland Life After the Tiger David Cleary
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Cingular UMTS Phase II Markets Pre-Launch RF Activities.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt HANDOVER Overview.
Slide title :40-47pt Slide subtitle :26-30pt Color::white Corporate Font : FrutigerNext LT Medium Font to be used by customers and partners.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt WTO Information Technology Symposium: Convergence and the impact of Globalization Ulf Pehrsson VP Government.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt The Development of Courseware for Smartphones Judy Nix Ericsson Education Ireland.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt POWER CONTROL UMTS Seminar.
Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Cost Control in Service Composition Environments NGMAST 2008 Jörg Niemöller, Raphaël Quinet, Roman Levenshteyn.
Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Configuration Aware Distributed System Design in Erlang Gabor Batori, Zoltan Theisz, Domonkos Asztalos.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Dynamic and Persistent Scheduling for Voice over IP Traffic in the Long-Term Evolution Uplink Master’s.
Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets.
1 Analysis of NGMN Requirements REQ 7: eNodeB Plug & Play Self Commissioning.
Ericsson Tower Tube. Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24.
Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt POST LAUNCH TUNING.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt ANALYSING EFFECTS OF MALFUNCTIONS ON THE PERFORMANCE OF UMTS RADIO ACCESS NETWORKS Author: Antti Keintola.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Ericsson IMS CANTO 2005, St. Kitts Antonio Gómez Business Unit Systems.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Verification of a GPRS Charging System in a Simulated Test Environment Author: Kirsi Koskenheimo Supervisor:
Slide title In CAPITALS 50 pt Slide subtitle 32 pt SEND Certificate Profile draft-krishnan-cgaext-send-cert-eku-01 Suresh Krishnan Ana Kukec Khaja Ahmed.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt DNA wg IETF71.
1 Title Line on a Divider Slide Format >Level one bullet text for a divider slide.
Security Level: HUAWEI TECHNOLOGIES CO., LTD. Slide title :40-47pt Slide subtitle :26-30pt Color::white Corporate Font : FrutigerNext LT.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Guidelines for Firewall Administrators Mobile IPv6 Suresh Krishnan, Niklas Steinleitner, Ying Qiu, Gabor.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Authentication/Authorization for possible deployments Relevant scenarios for CAFE.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt RTSP draft-ietf-mmusic-rfc2396bis-10 Magnus Westerlund Co-auhtors: Henning Schulzrinne, Rob Lanphier,
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Capacity Management in WCDMA.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Simple DNA draft-ietf-dna-simple-03 Suresh Krishnan Greg Daley.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Improvement of Software Delivery Process in the Telecommunications Industry Xian Sun
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Guidelines for Firewall Vendors Mobile IPv6 Suresh Krishnan, Yaron Sheffer, Niklas Steinleitner, Gabor.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt GMPLS RSVP-TE extensions for OAM Configuration IETF-81 Quebec.
HUAWEI TECHNOLOGIES CO., LTD.Huawei Confidential Page 1 Slide title :32-35pt Color: R153 G0 B0 Corporate Font : FrutigerNext LT Medium Font to be used.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Multi-component KPI:s ETSI/STQ_Mobile(08)18TD10.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt ITU Joint Regional Conference in Alexandria Building secure societies Mr. Kent Halling, Senior Advisor.
Title Here Subtitle Here.
Presentation Title goes here, Long if needed
presentation Title Goes Here
presentation Title Goes Here
Presentation Title goes here, Long if needed
Presentation transcript:

Slide title In CAPITALS 50 pt Slide subtitle 32 pt KPI Reporting and Analysis Templates Naren Mohan

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt Ericsson Confidential Types of Report  GnG Report (Per cluster from ACTIX)  Pre-Launch Tuning Tracker  Post Launch Tuning Report  Post Launch Tuning Tracker (updated after every drive)  Post Launch Tuning Cluster Close out summary report (One end of tuning)  Any other specific report as and when requested by Cingular, parameter change / feature trials etc etc..  Issues Tracking

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt Ericsson Confidential Go No-Go Report – Think Green !!!  GNG drives are performed currently using Agilent Nitro E6494 and post processed using ACTIX.  GnG drives contain one HSDPA download of 5MB file, 1 PS R99 download of 3MB file and a MOC-MTC Voice call for 30 seconds and 15 seconds wait.  GnG KPIs for packet are divided into Application Layer and Technology Layer Categories.

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt Ericsson Confidential The Drive to Green – RF Perspective At the end of every GnG Drive post processing you are required to analyze the logs for all KPIs that are red and provide explanations. RF Engineer

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt Ericsson Confidential Post Launch Tuning Tracker  Post Launch Drives are performed when 90% sites are available in the cluster and 60% sites in the neighboring clusters.  The KPI at the end of every drive needs to be updated in the tracker.  To present the results to the customer – detailed report from Omega Tool can be used.

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt Ericsson Confidential Cluster Close-out Report  The Cluster Close-out report is created at the end of the Post Launch Tuning Activity.  The report is per cluster summarizing the results of the post launch drive.  All KPIs that are RED need to be explained with any long term recommendations to fix the problem.  The template and some plots are automatically generated from the OMEGA Tool.

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt Ericsson Confidential