Climate System Observations and Prediction Experiment (COPE) Task Force for Seasonal Prediction.

Slides:



Advertisements
Similar presentations
WCRP Open Science Conference October 2011 Denver, Colorado, USA Climate Research in Service to Society.
Advertisements

WCRP polar climate predictability initiative Vladimir Ryabinin
International CLIVAR Structure, Activities and Future Directions Valery Detemmerman Joint Planning Staff World Climate Research Programme Geneva, Switzerland.
Scientific Advisory Committee – April 2010Jim Kinter - COLA Overview Proposal Scientific Advisory Committee Meeting 12 April 2010.
PPAI Breakout Session Report July 21, PPAI Breakout Session Report Introductions A review of PPAI activities In 2011 Discussion on the Large Scale.
NOAA Climate Program Chester J. Koblinsky Director, NOAA Climate Program Office The 29 th Climate Diagnostics and Prediction Workshop University of Wisconsin,
1 Geophysical Fluid Dynamics Laboratory Review June 30 - July 2, 2009.
CLIMAG LESSONS LEARNED AND FUTURE CHALLENGES A CLIMATE SCIENCE PERSPECTIVE By Hartmut Grassl Max Planck Institute for Meteorology Hamburg, Germany.
WCRP Community-wide Consultation on Model Evaluation and Improvement Sandrine Bony, Jerry Meehl, Anna Pirani (WGCM) Christian Jakob, Martin Miller (WGNE)
© Crown copyright Met Office CLIVAR Climate of the 20 th Century Project Adam Scaife, Chris Folland, Jim Kinter, David Fereday January 2009.
8 April 2013 Martin Visbeck Co-Chair CLIVAR SSG EGU – Vienna CLIVAR town hall Evolution of CLIVAR The World Climate Research Programme’s project on ocean-atmosphere.
CPC Forecasts: Current and Future Methods and Requirements Ed O’Lenic NOAA-NWS-Climate Prediction Center Camp Springs, Maryland ,
CLIVAR SSG May 2011 IOC/UNESCO, Paris France Jim Hurrell and Martin Visbeck Co-Chairs, International CLIVAR SSG Introduction to CLIVAR SSG-18 Strategy.
Climate Prediction Program for the Americas (CPPA) Outline : - CPPA background - major past and ongoing activities and achievements - opportunities/advances.
26-28 July 2006US CLIVAR Summit -- Breckenridge, CO Prediction, Predictability and Applications Interface Panel (PPAI) 2005/06 Activity Report Tom Delworth.
International CLIVAR Working Group for Seasonal-to- Interannual Prediction (WGSIP) Ben Kirtman (Co-Chair WGSIP) George Mason University Center for Ocean-Land-Atmosphere.
GEWEX 1988  SPARC 1992  WOCE CLIVAR 1995  TOGA WGNE WGCM WGSF ACSYS/CliC 1994–2003/2000  SOLAS >
NERC Centre for Global Atmospheric Modelling Department of Meteorology, University of Reading The role of the land surface in the climate and variability.
Identifying Grand Challenges in Climate Change Research: Guiding DOE’s Strategic Planning: Report on the DOE/BERAC workshop March Crystal City For.
Modelling Theme White Paper G. Flato, G. Meehl and C. Jakob.
7 October 2003COST 723 Objectives To determine  the predictability of climate  the effect of human activities on climate WCRP.
Strategic Planning Scientific Advisory Committee 27 February 2007.
West African Monsoon Modeling and Evaluation (WAMME) Project Yongkang Xue, Bill Lau, Kerry Cook With contributions from many collaborators C20C Workshop.
WCRP Polar Climate Predictability Initiative (PCPI) Ted Shepherd Department of Meteorology University of Reading Report to PPP SC meeting, Reading, 12.
R.Sutton RT4 coordinated experiments Rowan Sutton Centre for Global Atmospheric Modelling Department of Meteorology University of Reading.
World Climate Research Programme Climate Information for Decision Making Ghassem R. Asrar Director, WCRP.
Office of Science Office of Biological and Environmental Research DOE Workshop on Community Modeling and Long-term Predictions of the Integrated Water.
Status of the Sea Ice Model Testing of CICE4.0 in the coupled model context is underway Includes numerous SE improvements, improved ridging formulation,
Activities and Imperatives Anna Pirani ICPO Visiting Scientist, Princeton University.
Climate Change Working Group (CCWG) July, 2004 Co-chairs: Gerald A. Meehl, Ben Santer, and Warren Washington.
Climate and Cryosphere (CliC): Legacy for 2013 and Beyond Jeff Key NOAA/NESDIS Chair, CliC Observation and Products Panel (Agenda item )
CLIVAR and GECAFS Anji Seth International Research Institute For Climate Prediction (IRI)
The Future CLIVAR & Collaboration with PICES Toshio Suga, Tohoku University/JAMSTEC, Japan With input from Martin Visbeck, Co-Chair, CLIVAR SSG and Wenju.
NOAA Intra-Seasonal to Interannual Prediction (ISIP) and Climate Prediction Program for Americas (CPPA) Jin Huang NOAA Office of Global Programs November.
CLIVAR (Climate Variability and Predictability) CLIVAR is an interdisciplinary research effort within the World Climate Research Programme (WCRP) focusing.
World Climate Research Programme Joint Scientific Committee – 31 Antalya, Turkey.
WWRP An International Polar Prediction Project Chair: Gilbert Brunet Rapporteur: Barry Goodison 1.
IGST, Washington DC, June 1-3, is a very good source of information on structure of groups, terms of reference, membership and activitieswww.clivar.org.
Action Items and Recommendations WGSIP-12. Color Coding Items In Black Have Been Completed Items in Red Have No Progress to Date Items In Orange Have.
Click to edit Master title style Click to edit Master text styles Second level Third level Fourth level Fifth level 1 COST723 Final Workshop, ,
17 Sep 2012 Martin Visbeck and Jim Hurrell Co-Chairs, CLIVAR SSG GEWEX SSG October 2012 CLIVAR (Climate Variability and Predictability) Asian-Australian.
David M. Legler U.S. CLIVAR Office U.S. Climate Variability and Predictability Program usclivar.org CLIVAR Welcome Climate Diagnostics.
One-year re-forecast ensembles with CCSM3.0 using initial states for 1 January and 1 July in Model: CCSM3 is a coupled climate model with state-of-the-art.
26-28 July 2006US CLIVAR Summit -- Breckenridge, CO PPAI PPAI Concluding Report Proposed focus: DROUGHT ENSOExtreme Events Decadal Variability MJO Nowcasting.
WGSF-I, Halifax, October 2004 Earth System Science Partnership IRS: Amazon Antarctica Asian Monsoon Mediterranean North Eurasia/Arctic South Africa.
Report of WGCM (Met Office, Exeter, 3-5 Oct 2005) and WGCM/WMP (Met Office, Exeter, 5 Oct 2005 (pm)) meetings Howard Cattle.
NAME SWG th Annual NOAA Climate Diagnostics and Prediction Workshop State College, Pennsylvania Oct. 28, 2005.
WWRP 1 THORPEX-WCRP Collaborations and other climate relevant activities of the WWRP WCRP/JSC31 WMO/WWRP/THORPEX
Climate Mission Outcome A predictive understanding of the global climate system on time scales of weeks to decades with quantified uncertainties sufficient.
Climate Prediction: Products, Research, Outreach Briefing for NOAA’s Science Advisory Board March 19, 2002 National Weather Service Climate Prediction.
The WCRP strategic framework : Coordinated Observation and Prediction of the Earth System (COPES) Peter Lemke (AWI), David Carson (WMO) and members.
, Bergen, Arctic GOOS mtg WMO ICSU IOC WCRP and Arctic GOOS: V. Ryabinin, JPS for WCRP.
WG on Nowcasting Research World Meteorological Organization
Cross-Cutting Topic DECADAL PREDICTION.
To infinity and Beyond El Niño Dietmar Dommenget.
Edwin Gerber (New York University)
GFDL Climate Model Status and Plans for Product Generation
WORLD CLIMATE RESEARCH PROGRAMME
CLIVAR/WCRP Issues Imperatives WCRP Restructuring
Hydrology and Water Management Applications of GCIP Research
Modeling the Atmos.-Ocean System
CLIVAR International Climate of the 20th Century (C20C) Project
WCRP update DCPP meeting, Barcelona, 12 May 2016 M. Rixen,
Michel Rixen, WCRP Joint Planning Staff
Proposed WCRP Grand Challenge on Near Term Climate Prediction
What is our Vision for Decadal
Beyond
CLIVAR Report to WOAP4 Detlef Stammer.
What is our Vision for Decadal
GODAE Final Symposium, 12 – 15 November 2008, Nice, France
Presentation transcript:

Climate System Observations and Prediction Experiment (COPE) Task Force for Seasonal Prediction

Climate Observation and Prediction of the Earth System (COPES) Task Force for Seasonal Prediction

Scientific Direction and Structure of WCRP Determine to What Extent Climate can be Predicted Determine the Extent of Man’s Influence on Climate WCRP Activities will Lead to the Prediction of the Total Physical Climate System Including an Assessment of What is and What is not Predictable

Four Major Programs –CLIVAR: Ocean in Climate –GEWEX: Water Cycle and Energy –CliC: Cryosphere in Climate –SPARC: Stratosphere in Climate Two Major Modeling Activities –WGNE: Working Group on Numerical Experimentation –WGCM: Working Group on Coupled Modeling

Climate System Observations and Prediction Experiment (COPE) Seamless Prediction of the Total Physical Climate System from Weeks Through Decades Synthesizes Ongoing Observational and Modeling Activities of the all Relevant WCRP Components Three Central Themes: –Describe Structure and Variability of the Total Climate System Through Modeling and Observational Studies –Assess the Predictability of the Total Climate System by Making Predictions –Understand Mechanisms and Uncertainty of Regional Climate Change Prediction

Task Force on Seasonal Prediction (Draft ToR) Determine the Extent to which Seasonal Prediction of the Global Climate System is Possible with Currently Available Models and Data Identify the Current Limitations of the Climate System Model and Observational Data Sets Used to Determine Seasonal Predictability Develop a Coordinated Plan for Pan-WCRP Climate System Retrospective Seasonal Forecasting Experiments Report to the JSC in March 2004

The Workshop (Honolulu, November 2003) Develop a Coordinated Plan for Pan-WCRP Climate System Retrospective Seasonal Forecasting Experiments –Participation Across all of WCRP Contributes to “Seamless Weekly-to-Decadal” COPE Modeling/Prediction Activities –Plan to Emphasize Synsthesis of WCRP Programs Need to Include Effects of a Changing Climate –Science Development with Programs Write Draft Plan at Workshop – No Homework

Hypothesis There is currently untapped seasonal predictability due to interactions (and memory) among all the elements of the climate system (Stratosphere- Troposphere-Ocean-Land-Ice)

Interactive Atmosphere-Ocean-Land-Ice Prediction Experiment Best Possible Observationally Based Initialization of all the Components of Climate System Six Month Lead Ensemble (10 member) Fully Interactive Predictions of the Climate System –Predictions Initialized Each Month of Each Year Present Interactive Model: –Ocean – Open but interactive (e.g., slab mixed layer or GCM) –Atmosphere – Open but interactive, most likely a GCM –Land – Open but interactive, e.g. SSiB, Mosaic, BATS, CLM, Bucket … –Ice – Open but interactive (e.g., thermodynamic or dynamic)

Interactive Atmosphere-Ocean-Land-Ice Prediction Experiment Predictability Diagnostic (Example) –Limit of Predictability when the Forecast Ensemble Distribution same as Model Climate Distribution Free Running Model PDF Initial Condition (t=0) PDF t=limit of Predictability?

Interactive Atmosphere-Ocean-Land-Ice Prediction Experiment ENSO Mechanism Diagnostic (Example) –Recharge Oscillator vs. Delayed Oscillator –Role of Westerly Wind Bursts/Stochastic Forcing Impact of AO on Seasonal Predictability Regional Predictability –Local Land Surface Predictability –Extreme Events –Monsoons –Diurnal Cycle Coupled Feedbacks –Intraseasonal Variability Diagnostic Project Process

Interactive Atmosphere-Ocean-Land-Ice Prediction Experiment GEWEX: –Provides Guidance on How to Initialize Land Surface –Proposes/Implements Diagnostic Studies and Numerical Experiments CliC: –Provides Guidance on How to Initialize Cryosphere –Proposes/Implements Diagnostic Studies and Numerical Experiments CLIVAR: –Provides Guidance on How to Initialize Ocean –Proposes/Implements Diagnostic Studies and Numerical Experiments SPARC: –Provides Guidance on How to Prescribe Atmospheric Composition –Provides Guidance on How to Initialize Stratosphere –Proposes/Implements Diagnostic Studies and Numerical Experiments

End of “Official” COPE/S-I Presentation

COPE Task Force for Seasonal Prediction Develop a Coordinated Plan for Pan-WCRP Climate System Retrospective Seasonal Forecasting Experiments –Participation Across all of WCRP Contributes to “Seamless Weekly-to-Decadal” COPE Modeling/Prediction Activities –Plan to Emphasize Synsthesis of WCRP Programs Need to Include Effects of a Changing Climate –Science Development with Programs Write Draft Plan at Workshop – No Homework Attendance: 1 CliC 1 SPARC 2 GEWEX 14 CLIVAR Attendance: 1 CliC 1 SPARC 2 GEWEX 14 CLIVAR Held with the CLIVAR Working Group on Seasonal-Interannual Prediction (WGSIP)

Elements of the Agenda Current Status of Seasonal Prediction ( S. Mason and S. Zebiak ) Role of Oceans in Seasonal Prediction (CLIVAR) Atlantic Ocean and Seasonal Prediction ( S.-P. Xie ) Pacific Ocean and Seasonal Prediction ( A. Rosati ) Indian Ocean and Seasonal Prediction ( N. H. Saji ) Role of Cryosphere in Seasonal Prediction (CliC; J. H. Christensen ) Seasonal Prediction at Meteo France ( M. Deque ) Seasonal Prediction in China ( D. Yihui ) NCEP Coupled Predictions and Assimilation ( S. Nadiga ) ECMWF Ensemble Prediction ( R. Hagedorn ) Seasonal Predictability of SMIP and SMIP/HFP ( I.-S. Kang ) Multi-Model Ensemble Forecasts and Predictability ( M. Sugi ) Role of Land Surface in Seasonal Prediction (GEWEX; R. Koster and P. Dirmeyer ) Impact of Soil Moisture on Seasonal Prediction ( V. Kattsov ) Role of Stratospheric Processes in Seasonal Prediction (SPARC; M. Baldwin ) The Climate of the Twentieth Century Project (C20C; J. Kinter ) Discussion on Seasonal Prediction in a Changing Climate (Plenary Discussion) Developing a Coordinated Plan for Pan-WCRP Seasonal Prediction

Impressions Many in CLIVAR see this COPES S-I proposal as superfluous – a variant on existing projects (e.g., SMIP, DEMETER, PROMISE…). Proposers of COPES see CLIVAR as unable and ill-suited to bridge across WCRP projects. COPES is proposed as the synthesis mechanism for WCRP, and the S-I project would bring together these parallel modeling efforts. Note: There exist other components to COPES (e.g., observations, climate change) that are not represented at this workshop.

TOGA GEWEX 1988  WOCE SPARC 1992  ACSYS/CliC 1994–2003/2000  CLIVAR 1995  WGNE WGCM WGASF

WGCM CLIVAR’s Ptolemaic view of the Universe? WGNE WGASF

COPErnican Universe? COPES