Remote-Handled Transuranic Waste Disposition Discussion Meeting of the National Governors’ Association April 12, 2001 U. S. Department of Energy.

Slides:



Advertisements
Similar presentations
Update on NRC Low-Level Waste Program – Major Activities Large Scale blending of LLRW -Issued guidance to agreement states for reviewing proposals for.
Advertisements

Not to be Considered as a Regulatory Submittal Pre-Decisional DRAFT 19438_1 Preferred Alternative Recommended by Core Team Environmental Impact Statement.
Implementation of the Record of Decision for Low-Level and Mixed Low-Level Waste Presentation to the National Governors’ Association Federal Facility Task.
1 Transuranic Waste Processing Center Karen Deacon, Deputy Federal Project Director Oak Ridge Office of Environmental Management.
1 Status of DOE Cleanup in Idaho Presentation to the “LINE Commission” By Rick Provencher Manager, DOE Idaho Operations Office April 7, 2012 Idaho Falls,
Definition of Solid Waste Final Rule Public Meeting Charlotte Mooney Office of Resource Conservation and Recovery U.S. Environmental Protection Agency.
U.S. DOE Preparation for Shipping of Transuranic Radioactive Waste Cross Country – The Waste Isolation Pilot Plant (WIPP) O.W. “Lynn” Eaton, Manager External.
DEPUTY DESIGNATED FEDERAL OFFICIAL PRESENTATION JOEL BRADBURNE, PORTS SITE LEAD U.S. DEPARTMENT OF ENERGY Portsmouth Site Specific Advisory Board September.
Safety  performance  cleanup  closure M E Environmental Management National Spent Nuclear Fuel Program Role in DOE’s Transformation Barb Beller, Project.
1 Waste Management David Nickless Environmental Management Los Alamos Field Office March 3, 2015.
TRU Waste Processing Center Culture and Successful Implementation of an ISO Certified Environmental Management System Presented at the DOE ISM Conference.
Near Term Planning for Storage and Transportation of Used Nuclear Fuel Jeff Williams Project Director Nuclear Fuels Storage and Transportation Planning.
WELCOME: EPA PUBLIC MEETING
1 Hanford Transportation and Packing Overview Presented by: Jim Portsmouth and Marshall Myrick July 2015 CHPRC
MPMP Power Supply 1 Nuclear Power Update for The Society of American Military Engineers September 15, 2010.
Nuclear Power Discussion March 25, 2009 Joint meeting of the Legislative Energy Commission; the House Energy Finance & Policy Division; and the Senate.
Ecology’s Perspective on the Draft TC & WM EIS Suzanne Dahl and Jeff Lyon Nuclear Waste Program Washington State Department of Ecology.
1Managed by UT-Battelle for the Department of Energy Doing Business with Oak Ridge National Laboratory Presented to the SBTDC Opportunities 2008 Will Minter,
Update on DOE’s National Waste Disposition Plans Frank Marcinowski Deputy Assistant Secretary for Logistics and Waste Disposition Enhancements Office of.
Material Disposition Planning Olga Ligeti Radiation Protection Department MARCH 24, 2009.
H.R The Government Waste Isolation Pilot Plant Extension Act of 2011.
Proposed Amendments to Chapter 32, Article V, Solid Waste Management, and to Chapter 38, Zoning Orange County Code Presented by the Orange County Environmental.
Waste Management Working Group CTMA Point Clear, AL W. T. (Sonny) Goldston EnergySolutions Working Group Chair July 6 - 9, 2015.
Hanford Spent Nuclear Fuel and Cesium/Strontium Capsule Status Presented by Sen Moy - RL National SNF Meeting November 8, 2005.
1 Idaho Cleanup Project Extension Work Transportation Accomplishments M. Shawn Tigue July 2015.
M E Environmental Management safety  performance  cleanup  closure The U.S. Department of Energy Environmental Management Intergovernmental Meeting.
Office of River Protection 2015 Hanford ORP Site Status Report
Retrieval and Treatment of Problematic MLLW Streams Renee Echols Senior Vice President CTMA Partners in Progress, July 7, 2015.
MEDICAL WASTE MANAGEMENT REGULATIONS FOR THE HANDLING, TREATMENT & PROPER DISPOSAL OF MEDICAL WASTE, INCLUDING EBOLA WASTE Daniela Ortiz de Montellano.
1 Characterizing Mercury Waste at DOE’s Sites & Developing Management Strategies Breaking the Mercury Cycle Conference Boston MS May 1-3, 2002 Mike Morris,
INL SNF PROGRAM presented to National Spent Nuclear Fuel Program Technical Exchange Meeting November 8 - 9, 2005 Washington, DC presented by R. O. Ramsey.
Waste Isolation Pilot Plant Program Status National Governors’ Association Meeting May 17, 2002 Alton D. Harris, III.
Area I Burn Pit Santa Susana Field Laboratory RCRA Facility Investigation Work Plan February 19, 2008 Laura Rainey, P.G. Senior Engineering Geologist California.
Frank Marcinowski Deputy Assistant Secretary for Regulatory Compliance Environmental Management May 23, Federal Facility Task Force Meeting Update.
Frank Marcinowski Deputy Assistant Secretary for Regulatory Compliance Office of Environmental Management U.S. Department of Energy Environmental Management.
Status of Low-Level Radioactive Waste (LLRW) Compacts and Update on Commercial LLRW Disposal Facilities.
Life After Landfill – regulatory requirements Kate Hamer and Thomas Gallasch Waste to Resources, Regulation and Compliance EPA 27 th September 2007.
 closure E M Environmental Management  cleanup  performance safety STRATEGY MEETING NATIONAL SPENT NUCLEAR FUEL PROGRAM Bringing Innovation to Spent.
1 EM Update Presented to the National Governors Association Federal Facilities Task Force Dr. Inés Triay Principal Deputy Assistant Secretary for Environmental.
The Yucca Mountain Repository for Nuclear Waste June Edward F. Sproat III Director Office of Civilian Radioactive Waste Management U.S. Department.
Progress in EM’s Footprint Reduction for the Oakland Projects Office Projects Rich Schassburger November 16, 2010.
Program Manager’s Review Joe Christy September 19, 2005.
East Tennessee Technology Park Emergency Management Program (Vision 2020) Darryl Bonner UCOR Emergency Management October 15, 2015.
1 Energy/Compost Facility Action Plan City Council Meeting July 2, 2012.
August 28, Waste Inventory Records Keeping Systems United States of America Douglas Tonkay U.S. Department of Energy Washington, DC Office of Commercial.
Background - Federal Legislation
Oak Ridge National Laboratory Office of Science Site Status Report
Department of Environmental Quality
Proposed Revisions to 10 CFR Part 61
Low Level Radioactive Waste Forum, Fall 2014 Meeting
The Path Forward for WIPP: A State and Local Perspective
Janet R. Schlueter Senior Director, Radiation and Materials Safety
Division of Waste Management
Overview of Waste Disposition Activities Fall 2017 LLW Forum Meeting
Waste Management’s Role in Safely Consolidating, Accelerating, and Delivering the Idaho Cleanup Project Core Mission Bruno Zovi, AMWTP LLW/MLLW Program.
Oak Ridge Office of Environmental Management Update
Waste Disposition 2006 Intergovernmental Meeting with DOE
Georgia Update Jeff Cown Land Protection Branch
Overview of NRC Low-Level Waste Activities and Initiatives
Status of Disposal Capabilities for Greater-Than-Class C (GTCC) Low-Level Radioactive Waste Theresa J. Kliczewski GTCC EIS Document Manager Office of.
Groundwater and Waste Management Committee November 9, 2016
Julie Woosley, Division of Waste Management
Decommissioning Rulemaking
Julie Woosley, Division of Waste Management
NRC Oversight on Storage of Special Nuclear Material
LL Forum Meeting Richland Washington
RESOLUTION OF GENERIC SAFETY ISSUE 191
Julie Woosley, Division of Waste Management
Office of Waste Disposal Office of Environmental Management
U.S. Department of Energy Perspectives on Waste Classification
Presentation transcript:

Remote-Handled Transuranic Waste Disposition Discussion Meeting of the National Governors’ Association April 12, 2001 U. S. Department of Energy

2 Topics To Be Discussed Definition of RH TRU Waste Volume of RH TRU at DOE sites Regulatory strategy for disposal of RH TRU at the Waste Isolation Pilot Plant (WIPP) Requirements and considerations for approval RH shipping casks Small Quantity Sites (SQS) strategy Current schedule

3 Definition of RH TRU Waste TRU waste is waste containing more than 100 nanocuries of alpha-emitting transuranic isotopes per gram with half- lives greater than 20 years RH TRU waste has an outer surface dose rate of greater than 200 millirem per hour Homogeneous solids, debris, soil, and gravel

4 Source: The National TRU Waste Management Plan, Revision 2 (December 2000) (1) Waste may not be of defense origin; compliance with LWA requirement will need to be demonstrated prior to disposal at WIPP. (2) Waste is commercial and does not meet the LWA requirement for disposal at WIPP. Volume of RH TRU at DOE Sites (Stored and Projected) Hanford 900 m 3 INEEL 85 m 3 ANL-W 54.5 m 3 ETEC 8.7 m m 3 SNL 25.5 m m m 3 ANL-E 77 m 3 ORNL 20.8 m 3 BCL BAPL 3 m m 3 KAPL WV (2) 479 m 3 GE Vallecitos (1) LANL

5 Regulatory Strategy for Disposal of RH TRU at WIPP Characterization program to be proposed to the Environmental Protection Agency (EPA) and New Mexico Environment Department (NMED) is performance-based, responsive to: –ALARA requirements –Joint EPA/NRC guidance –NAS recommendations “Acceptable Knowledge” is the focus of the program, where available, to meet Compliance Certification, Land Withdrawal Act and RCRA requirements This strategy may require EPA rule-making and NMED Class 3 permit hearings

6 Requirements and Considerations for EPA and NMED Regulatory Approval DOE to submit RH characterization program to EPA that meets WIPP Land Withdrawal Act and 40 CFR 191/194 requirements, and EPA approves via 40 CFR process New Mexico Environment Department must approve modification to the WIPP Hazardous Waste Facility Permit DOE to submit to NMED: –RH Facility Modification Request –RH Waste Analysis Plan NMED issues draft and final permit allowing RH TRU waste storage and disposal

7 Requirements and Considerations for EPA and NMED Regulatory Approval (cont.) Informally discussed draft RH TRU characterization process document and supporting position papers with EPA, March 14, 2001 Two permit modification requests to be submitted to NMED, summer of 2001 Independent review of performance-based approach by NAS or outside organization is expected

8 RH Shipping Casks RH-72B Outer thermal shield Inner/outer containment vessels with impact limiters 12 feet long; 3.5 feet diameter 1-7/8 inch lead liner CNS B Carbon steel- and lead-shielded shipping cask Steel-encased, rigid polyurethane foam impact liners on top and bottom Cavity height 77 inch; diameter 68 inch Wall thickness 4 in. including inch lead

9 Small Quantity Site Strategy Ship directly to WIPP is the preferred option Where there are site closure considerations, DOE is continuing to examine intersite transfers Feedback requested from State representatives on moving forward with contingency planning for sites with closure schedules.

10 BACKUP SLIDES

11 Battelle Columbus Laboratory Summary Shipments of ~25 m 3 of RH TRU waste ( drums) must start by September 2001 to support site closure schedule –TRU waste must be removed from current hot cell building so that D&D can proceed- Need to move offsite or into a new storage building –Activities required for new building include NEPA action, license amendment, RCRA permit, design, and construction –Cost of permitting, NEPA analysis, design, construction, and critical path delays ~ $10-15 Million (one+ years) –Decision about new storage building needed by June 1, 2001 Oak Ridge and Hanford considered as receiving sites –Ohio EPA has had previous conversations with counterparts in both Tennessee and Washington state –Tennessee sent a letter in February 2001 to DOE stating they did not support receipt of RH TRU waste from offsite until Oak Ridge begins shipping RH TRU to WIPP –State of Washington has also sent a letter (March 2001) stating they did not support receipt of RH TRU waste from offsite until Hanford begins shipping RH TRU to WIPP –Oak Ridge scheduled to begin shipments of RH TRU to WIPP in January 2003 –Hanford scheduled to begin shipments of RH TRU to WIPP in timeframe

12 Energy Technology Engineering Center Summary Shipment of RH TRU waste (up to 8.7 m 3 ) must start by September 2002 to support site closure schedule –Waste must be removed from Radioactive Materials Handling Facility before D&D can begin –CH waste must also be removed Current schedules for RH permit modification supports ETEC’s closure schedule Need to finalize decisions on ETEC RH TRU in early CY 2002

13 Argonne National Laboratory - East Summary RH waste in inventory will be shipped directly to WIPP when permit modifications approved - currently schedule in FY 2003 RH waste generated in future (post-2006) will also be shipped to WIPP directly Mobile Vendor Units will be deployed onsite to characterize contact-handled (CH) waste CH characterization schedule to be completed in December 2001

14 Oak Ridge National Laboratory Summary Oak Ridge has large quantity of RH sludges requiring treatment before shipping to WIPP Foster-Wheeler contract in place to perform all treatment and necessary characterization for disposal at WIPP Shipments of RH TRU scheduled to begin in January 2003 Oak Ridge has smaller amounts of CH TRU that are scheduled to be shipped to WIPP beginning in FY 2004

15 HALFPACT CASK

16 SCHEMATIC OF THE RH-72B CASK

17 R H - 72B CASK