Analysis on DPRK Power Industry & Interconnection Options 21. SEP. 2010 KERI ( J. Y. YOON )

Slides:



Advertisements
Similar presentations
Issues and counter-measures related to the status of the power supply in SAARC countries March 6, 2013 Professor Shigeru Sudo Department of Business Management.
Advertisements

Integrated Resource Planning: An overview Mark Howells & Bruno Merven Energy Research Centre Energy Research Centre University of Cape Town.
The Power Grid ELEC 403 The Citadel Mark McKinney.
Baltic Energy Strategy Einari Kisel Director of Energy Department.
Transmission Transporting Electricity by Wire Darcy Neigum Montana-Dakota Utilities Co.
1 Strategy of electric power industry development in Russia for the period up to Director of OJSC «ENIN», Academician of RAS Eduard P. Volkov.
1 Power Sector in Tanzania Recent Developments, Current Crisis, Issues, Challenges and Solutions.
Energy and the Pakistani Economy: An Expletory Analysis to 2035 Dr. Robert Looney Professor, Naval Postgraduate School Woodrow Wilson International Center.
Energy Prospects in the Mediterranean Region Dr Houda Ben Jannet Allal Energy Prospects in the Mediterranean Region Dr Houda Ben Jannet Allal Geneva, 31.
Regulatory framework in the Energy Sector Chairman Ph.D. Tserenpurev Tudev Energy Regulatory Commission of Mongolia Energy Mongolia-2012 Ulaanbaatar Mongolia.
Brief on HVDC 2015 Brief on HVDC 2015
A review of offshore wind power grid connection options in the Bothnian Bay Offshore grids for wind power integration Sisu Niskanen VTT Technical Research.
The Need for an Energy Grid in the Maldives
Supergrid Modelling for the Indian Subcontinent Farhan Beg Global Energy Network Institute With Inputs from Mr. Peter Meissen and Mr. Paul Michael Dekker.
© ABB SG_Presentation_rev9b.ppt | 1 © ABB SG_Presentation_rev9b.ppt | 1 Smart Grid – The evolution of the future grid Karl Elfstadius,
China Thermal Power Efficiency Project WB support to the improvement of coal-fired power generation efficiency in China Jie Tang Energy Specialist East.
Mohamed Al-Shaikh, BSc MSc CEng MIET Manager, Maintenance - GCCIA
(Associate Professor)
1 TECHNOLOGICAL CONSIDERATION ON ENERGY COOPERATION OF N-E ASIA OCTOBER, 18, 2002 SUNWOO, HYUN-BUM.
Current Situation and Prospects of Energy Cooperation between Two Koreas Kyung Sool Kim Korea Energy Economics Institute Center for Energy Research, Northeast.
THE TRES AMIGAS SUPERSTATION Southwest Renewable Energy Conference Santa Fe, NMSeptember 16 th 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
E.ON on the Romanian Energy Market ZF Power Summit Bucharest, February 27, 2013 Frank Hajdinjak CEO E.ON România.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
1 Electrical Energy Transmission by High-voltage Direct Current (HVDC) and Prospects for an Electrical Market Mohamed Lakhdar HABIB and Rime BOUAROUDJ.
Dr. Fatih Birol Chief Economist Head, Economic Analysis Division International Energy Agency / OECD WORLD ENERGY INVESTMENT OUTLOOK.
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
Strategies for the security of electricity supply.
1 Energy Crisis in DPR Korea and Cooperation Issues DPRK Energy Expert Study Group Meeting Stanford University, Palo Alto, California, USA June 26 – 27,
Turkish Power System Overview March 2012
Lecture 1 – Power Quality INTRODUCTION TO POWER QUALITY Power Quality phenomenon-Terms and definitions-Various Power events in power quality - causes for.
AFREPREN/FWD Cogen Centre Training Workshop on Cogeneration in Africa
RENEWABLE ENERY & BIOMASS COGENERATION TRAINING – KENYA BY LEWIS B. MHANGO.
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
W. Schufft: Challenges for electrical power engineering IP 2007, Pernink Challenges for Electrical Power Engineering.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
Ministry of Economy, Trade and Industry Experience and Future Activities for Introduction of Nuclear Power Masaomi KOYAMA Deputy Director Nuclear Energy.
Contents Overview and latest topics in TEPCO
Techno-economic Analysis of an Off-grid Micro- Hydrokinetic River System for Remote Rural Electrification Central University of Technology Energy Postgraduate.
Sanjay Garg General Manager PGCIL/ Ministry of Power
Russian power sector reform Presentation to AmCham Russia members by CEO of Unified Energy Systems of Russia, Anatoly B. Chubais March 20, 2001Moscow.
Updates on the RFE Energy Sector and the RFE LEAP model, and Implications of a Regional Alternative Path for the Russian Far East Victor Kalashnikov Economic.
K E M A T & D C O N S U L T I N G Power System Conference, Clemson, South Carolina, March 8-11, 2005 Principles and Issues Relating to the Interconnection.
Overview of the Cooperation and Major Schemes Bok-Jae Lee Senior Research Fellow.
VUJE, a. s., Okružná 5, Trnava Strengthening the European Union Energy Security Prepared by Peter Líška (Slovak proposal) Brussels, 14th September.
1 Clean Line Energy National Association of State Utility Consumer Advocates Charleston SC Annual Meeting June 2012.
THE LONG-TERM ENERGY SUPPLY AND DEMAND OUTLOOK IN TAIWAN ENERGY COMMISSION MINISTRY OF ECONOMIC AFFAIRS AUGUST 2001 MOEA -15-
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute National Control Commission for Prices and Energy 3 April 2007, Riga.
Accelerate the Construction of the UHV Power Grid and Promote the Sustainable Development of Chinese Power Industry Liu Zhenya State Grid Corporation of.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
Distribution Systems-General
© ABB Power Technologies :\PTP\GF-CC\Arbetsmaterial Jan-16 HVDC Light – ABB’s technology for invisible transmission Per Haugland Head of ABB Power.
BI Marketing Analyst input into report marketing Report TitleElectricity in Texas Report Subtitle State profile of power sector, market trends and investment.
2nd Workshop on PGI in NEA, May , Shenzhen, China 1 “RFE-NEC-DPRK-RK” POWER GRID INTERCONNECTION Sergei Podkovalnikov Energy Systems Institute,
1 AUDITORS. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN :-
1 Where Does Electricity Come From?. 2 Overview of Electricity.
Efficient Energy Transmission using HVDC
HVDC Transmission.
Multiscale energy models for designing energy systems with electric vehicles André Pina 16/06/2010.
Electricity & Regulatory Overview of Korea
Introduction to Electric Power System and A. C. Supply
HVDC LIGHT:- NEW TECHNOLOGY FOR A BETTER ENVIRONMENT
Damitha Kumarasinghe Director General
“Caucasus Power Transmission Network’’ (Armenia-Georgia overhead transmission line/substations) Loan Project.
Sustainable Energy Planning for Autonomous Power System of Crete
EE6501 POWER SYSTEM ANALYSIS
Transmission and Sub-Transmission Network India – Present and Future Rajesh Suri GE (T&D) India Ltd 8 November 2018.
Energy sector activities and Plans in the DPRK
The ISLES Project Bob Hanna
POWER GRID INTERCONNECTIONS IN CHINA
HVDC Transmission Systems:
Presentation transcript:

Analysis on DPRK Power Industry & Interconnection Options 21. SEP KERI ( J. Y. YOON )

1 <CONTENTS>  Introduction  Present Status on DPRK Power Sector  Future Prospects on DPRK Power Sector  History of DPRK Electricity Policy  Interconnection Options  Conclusion

2 <Introduction>  DPRK suffers from Energy/Electricity shortage …. Power Capacity/Generation amount of 2009 is worsen than 2008 Power Capacity/Generation amount of 2009 is worsen than 2008 Strongly related to DPRK Economy crisis Strongly related to DPRK Economy crisis DPRK practices proper internal & external measures … DPRK practices proper internal & external measures …  Construction of generation plants (big or medium hydro plants)  Construction of generation plants (big or medium hydro plants)  Remodeling of power facilities (plants, T/L, D/L. Network …)  Remodeling of power facilities (plants, T/L, D/L. Network …)  Enhancement of T&D facilities  Reduce power loss  Enhancement of T&D facilities  Reduce power loss  Ultra-strong Demand side managements  Ultra-strong Demand side managements  Wants to the co-operational policy with the ROK, RF, China  Wants to the co-operational policy with the ROK, RF, China  No exact data & statistics on the DPRK Electricity Sector Nobody knows the exact data on power plants, power system … Nobody knows the exact data on power plants, power system … Only estimated data had been published … Only estimated data had been published …

3 FactorsROK (Jan. 2008)DPRK (Jan. 2008) DPRK/RO K Capacity (MW) Hydro 71,687 5,430 7,242 4, % Therma l 48,5413,200 Nuclear17,716- Capacity Factor(%)91.2%Estimates 30% Genration (TWh) Hydro % Therma l Nuclear151- Frequency(Hz)60 - Trans. Voltage (kV)765/345/154220/110/66- Dist. Voltage(kV)22.9/0.22/ /6.6/11/22 - Demand Char.Summer daytime peakWinter night peak- Supply Char.No. ShortageShortage- OperationIsland System -

4 YEAR YEARDATA SouthKOREA Capacity (MW) Generation (TWh) NorthKOREA Capacity (MW) Generation (TWh)

5  DPRK authority transfer their formal Data to KERI (2006) These data delivered by DPRK officers through PANMUNSEOM These data delivered by DPRK officers through PANMUNSEOM Existing capacity 9500MW(Hydro 5170, Thermal 4330MW) Existing capacity 9500MW(Hydro 5170, Thermal 4330MW)  Almost plants are decrepit, couldn’t supply electricity  Almost plants are decrepit, couldn’t supply electricity Supply potential capacity 5970MW(Hydro 3930, Thermal 2040) Supply potential capacity 5970MW(Hydro 3930, Thermal 2040) Existing Capacity 9500 MW Hydro 5170 MW Thermal 4330 MW Potential Supply Capacity 5970 MW Hydro 3930 MW Thermal 2040 MW

6  Generation amount Min 16TWh (KERI, 2007), 725kWh/person Max 23.5TWh(BOK, 2009) ≈ 1000kWh/person Average capacity factor is about 30~35% Max 36 TWh if free supply/demand is guaranteed …  same level of 1987 per capita in ROK  Real Electricity Consumption Estimates power loss 20% caused by weak system characteristics  same level of 1960’s (ROK, 3.99% 2008)

7  DPRK Electricity Consumption per Capita ≈ kWh/Year Same Level of ROK in about 1980 … Same Level of ROK in about 1980 … At that time, ROK has no problem to supply electricity, But DPRK … At that time, ROK has no problem to supply electricity, But DPRK … This is not lower than any other developing countries in about 2000 This is not lower than any other developing countries in about 2000 Country Electricity Consumption per Capita Philippines515(kWh/year/person) India393(kWh/year/person) Indonesia390(kWh/year/person) Pakistan374(kWh/year/person) Sri Lanka283(kWh/year/person) Bangladesh102(kWh/year/person) Myanmar74(kWh/year/person) Nepal101(kWh/year/person)

8  Hydro Plants under Construction since 2000 Plant NameInstall CapacityRemarks Guemya-gang180 Wonsan-chyoungnyeon60 Anbyeon-chyoungnyeon200 Uerang-choen73 Youngwon135 Tae-cheon #2200 Tae-cheon #420 Yeseong-gang100 Heecheon100 Samsu50 Bankdusan-chyoungnyeon30 [MW]

년 북한 전력산업 현황 추정자료 남북한 전력계통 비교 (2004 년 12 월 기준 )  Transmission System Composed of 220, 110, 66kV system Composed of 220, 110, 66kV system Frequency 60Hz, same as The ROK // Russia, China 60Hz Frequency 60Hz, same as The ROK // Russia, China 60Hz Divided into East, West, South & Central System Divided into East, West, South & Central System Weak power system Weak power system Plan to construct 500kV Line to connect east/west system Plan to construct 500kV Line to connect east/west system Power transmission west  east in rainy season Power transmission west  east in rainy season east  west in dry season east  west in dry season Eastern system DUMAN-river Hydro & SEONBON Thermal plants Eastern system DUMAN-river Hydro & SEONBON Thermal plants Western system AMROK-river hydro & Thermal plants nearby PYEONGYANG Western system AMROK-river hydro & Thermal plants nearby PYEONGYANG

10

11  Distribution System Primary Voltage  3.3, 6.6, 11, 22kV Primary Voltage  3.3, 6.6, 11, 22kV Secondary Voltage  110V, 220V Secondary Voltage  110V, 220V Standardization to 11kV Primary Voltage Standardization to 11kV Primary Voltage  KEPCO 22.9kV is more reasonable  KEPCO 22.9kV is more reasonable 22.9kV system was already applied to supply “GAESUNG Industrial complex”, 30km, 15MW x 2 circuits 22.9kV system was already applied to supply “GAESUNG Industrial complex”, 30km, 15MW x 2 circuits

12  Very weak system and bad quality Several measured data was reported Several measured data was reported ① (DATA-1, measured value of 220 [V] rating) [V] ① (DATA-1, measured value of 220 [V] rating) [V] ② (DATA-2, measured value of 110[kV] rating) [kV] ② (DATA-2, measured value of 110[kV] rating) [kV] ③ (DATA-3, frequency variations, 60 [Hz] rating) [Hz], [Hz] ③ (DATA-3, frequency variations, 60 [Hz] rating) [Hz], [Hz] Voltage below [pu] (ex 110kV  80-90kV level), Voltage below [pu] (ex 110kV  80-90kV level), Frequency 60Hz  43-55Hz Frequency 60Hz  43-55Hz Obstacle to practical business cooperation Obstacle to practical business cooperation (ex: KORES develops the DPRK coal mine, but couldn’t operation because of bad power quality, seek to alternatives to solve ….) (ex: KORES develops the DPRK coal mine, but couldn’t operation because of bad power quality, seek to alternatives to solve ….) Necessity for reinforcements on overall DPRK power system Necessity for reinforcements on overall DPRK power system  Reduce power loss above 20%  below 4%, ROK level  Reduce power loss above 20%  below 4%, ROK level  Improve the industrial productivity  Improve the industrial productivity

13  Demand on Free Market Volume at preset status … Estimated by about 36TWh, more than 1,600kWh/person/year Estimated by about 36TWh, more than 1,600kWh/person/year As high as twice compared with present real consumption As high as twice compared with present real consumption Same level of ROK per capita in about 1987 …. Same level of ROK per capita in about 1987 ….  Consumption composition ratio (KERI) Industry over 70% Industry over 70% Military about 14% Military about 14% House lower than 11% House lower than 11% IndustryMilitaryHouseTransportationTotal Consumption (TWh) Ratio(%)

14 Category Total Capacity11,730 [MW]16,150 [MW] Hydro5,980 [MW]6,950 [MW] Thermal3,750 [MW]4,000 [MW] Nuclear2,000 [MW]5,200 [MW] Annual Average Load9,727 [MW]12,450 [MW] Energy Demand79 [TWh]100 [TWh]

15  Electricity Policy for DPRK Power Supply/Demand Divided into 5-step electricity policies Divided into 5-step electricity policies : :  Mainly dependent on hydro plants (90%), No shortage  Mainly dependent on hydro plants (90%), No shortage 1970’s – 1980’s : Policy change hydro by coal (thermal) 1970’s – 1980’s : Policy change hydro by coal (thermal)  Construction of thermal plant supported by Russia  Construction of thermal plant supported by Russia 1980’s – : Policy change coal by nuclear plan 1980’s – : Policy change coal by nuclear plan  Construction Plan for Nuclear plants, ex) KEDO project  Construction Plan for Nuclear plants, ex) KEDO project 1990’s - : Construction of medium/small hydro plants 1990’s - : Construction of medium/small hydro plants 2000’s - : Conduct both internal, external policies in parallel 2000’s - : Conduct both internal, external policies in parallel

16  Internal policy :  Devise various countermeasures to overcome electricity shortage  Devise various countermeasures to overcome electricity shortage Construction of Large hydro plants (11 units 1180MW) Construction of Large hydro plants (11 units 1180MW) Remodeling of overall power system Remodeling of overall power system  Generation plants, Transmission, Distribution system  Generation plants, Transmission, Distribution system Co-operational policy with neighboring countries Co-operational policy with neighboring countries  Russia, The ROK  Russia, The ROK Energy saving policy Energy saving policy  Discriminatory power supply, replace by lighting lamp for energy saving  Discriminatory power supply, replace by lighting lamp for energy saving  Using the Electronic metering ticket  Using the Electronic metering ticket

17  Internal policy (continue) : Energy 3-year’s plan (03-05) Energy 3-year’s plan (03-05) ① Restructuring power plants ① Restructuring power plants ② Coal production increase ② Coal production increase ③ Expansion for coal production machinery ③ Expansion for coal production machinery Science & Technology 5-year’s plan (03-07) Science & Technology 5-year’s plan (03-07) ① Efficiency improve of water turbine (90%) ① Efficiency improve of water turbine (90%) ② Saving the heavy oil & Modernize the coal production tech. ② Saving the heavy oil & Modernize the coal production tech. ③ Reduce the power loss (21%→16%) ③ Reduce the power loss (21%→16%) ④ Transmission systemize for NEAREST ④ Transmission systemize for NEAREST ⑤ Develop the renewable energy ⑤ Develop the renewable energy

18  Construction of large hydro plants 11 units, 1180MW 11 units, 1180MW  Restructuring of aging thermal plants BUKCHANG(1600MW), PYONGYANG(500MW) Thermal Plants BUKCHANG(1600MW), PYONGYANG(500MW) Thermal Plants  Change Boiler, Turbine ….  Change Boiler, Turbine …. SUPUNG(800MW) ․ GYANGKYE(246MW) SUPUNG(800MW) ․ GYANGKYE(246MW)  Water Turbine change & DAM Reconstruction  Water Turbine change & DAM Reconstruction  Reinforcement of T&D Lines nearby PYONGYANG

19  Construction of Medium Hydro plants from 1999 Effect of small hydro was not high …. Effect of small hydro was not high …. Constructed 48 units(86MW) in 2005 Constructed 48 units(86MW) in 2005 Under construction 18 개 Under construction 18 개 No. of units decreased (300/y →66/y), No. of units decreased (300/y →66/y), Increased capacity (7-200kW/unit → 1,800kW/unit) Increased capacity (7-200kW/unit → 1,800kW/unit) (Unit : kW) (Unit : kW) -’ Total Planning6, ?10043 Constructed6, (18)6,841(18) Capacity292,00024,50030,000 20,00086,400470,900 kW/unit , ,800

20  External policy : DPRK requests to Electricity Aid DPRK requests to Electricity Aid  To ROK, Short-term 500MW, Long-term 2,000MW  To ROK, Short-term 500MW, Long-term 2,000MW  To Russia, MW  To Russia, MW Wants to build Nuclear plant through Political negotiation Wants to build Nuclear plant through Political negotiation Facility maintenance support from neighboring countries Facility maintenance support from neighboring countries ROK offers 2000MW aid if DPRK gives up atomic plan … ROK offers 2000MW aid if DPRK gives up atomic plan … Electricity Aid under mutual political, economic trust should be guaranteed Electricity Aid under mutual political, economic trust should be guaranteed  Nowadays, military tension happens caused by “CHEONAN ….”

21  External cooperation  External cooperation Import used plant facilities with natural resources security Import used plant facilities with natural resources security from RUSSIA(BUCKCHANG), CHINA (large hydro), HYDRO SWEDEN (small hydro plants) from RUSSIA(BUCKCHANG), CHINA (large hydro), HYDRO SWEDEN (small hydro plants) Collaboration with CHINA : Collaboration with CHINA : Construction of Power line & cable factory Construction of Power line & cable factory Change of T&D power line & lighting (Compact lamp to reduce power loss by 80%) Change of T&D power line & lighting (Compact lamp to reduce power loss by 80%) Supply card type electronic power meter Supply card type electronic power meter  Introduction of capitalism on power consumption  Introduction of capitalism on power consumption

22  10MW Capacity Transmission Line & “PEACE substation” Electricity supply was started since March 2006 Electricity supply was started since March 2006 At first, using 22.9kV 2-circuit distribution line At first, using 22.9kV 2-circuit distribution line Now, 154kV transmission line and 154kV substation, so called “PEACE S/S” since 2007 Now, 154kV transmission line and 154kV substation, so called “PEACE S/S” since ,000 North Korean are now working in GAESUNG industrial complex 40,000 North Korean are now working in GAESUNG industrial complex KEPCO had the financial damage more than 10 million dollars annually because of the high cost but low electricity price for this area KEPCO had the financial damage more than 10 million dollars annually because of the high cost but low electricity price for this area

23

24  Comparison of AC/DC options CategoryACDC Transmission capacityDisadvantageAdvantage Reactive compensationDisadvantageAdvantage Fault ImpactsDisadvantageAdvantage Fault CurrentDisadvantageAdvantage Power qualityDisadvantageAdvantage System controlDisadvantageAdvantage Power lossAdvantage (short distance)Advantage (long distance) Economic efficiencyAdvantage (short distance)Advantage (long distance) Point of issue Low Frequency Oscillation Unstable Phenomena Commutation Failure caused by weak system

25  Many scenarios for NEAREST has been published ESI, KERI, NI report/paper etc. ESI, KERI, NI report/paper etc. Has rough concept/contents and similarities with each other Has rough concept/contents and similarities with each other Among these scenarios, “(RU)-DPRK-ROK” is the key point Among these scenarios, “(RU)-DPRK-ROK” is the key point  Future interconnection potentials b/t ROK and DPRK Possibility of power interconnection in future Possibility of power interconnection in future Power supply for GAESUNG industrial complex was realized Power supply for GAESUNG industrial complex was realized ROK government offers 2000MW aid if DPRK gives up atomic plan ROK government offers 2000MW aid if DPRK gives up atomic plan DPRK wants to build light water reactor …. DPRK wants to build light water reactor …. Unified power system operation will be realized Unified power system operation will be realized

26  Future potentials for “RF-DPRK” power interconnection “RU Vladivostok – DPRK Cheongjin” 375km, DC Line “RU Vladivostok – DPRK Cheongjin” 375km, DC Line Expect 220kV 50Hz AC  500kV 50Hz AC Expect 220kV 50Hz AC  500kV 50Hz AC   500kV or  600kV DC Operation   500kV or  600kV DC Operation  Future considerable points Harmonization of Short and Long term Interconnection policy Harmonization of Short and Long term Interconnection policy GAESUNG & Cheongjin GAESUNG & Cheongjin Parallel operation of interconnection system Parallel operation of interconnection system How to operate 50Hz AC S/S in Cheongjin after DC operation begins ? How to operate 50Hz AC S/S in Cheongjin after DC operation begins ?

27  Summary for “ROK-DPRK-RF” interconnection scenarios Item Scenario-1Scenario-2Scenario-3Scenario-4 Interconnection Type Cost Min Power Max Power Route Energy security Priority 3 Terminal2 Terminal BTB ROK-DPRK-RF ROK-RF via DPRK ROK-RF via East Sea DPRK internal power system 2GW 3GW1GW HVDC TypeVSCVSC or CSC VSC 4GW 3GW4GW Medium LargeSmall NormalBadGoodBad ReliabilityNormalGood Bad

28 RFEVladivostok CHEONGJIN GAESUNG (50Hz 500kV AC) RFE Vladivostok ROK AC SYSTEM (60Hz 345kV AC) DPRK AC SYSTEM PYONGYANG or Border of ROK-DPRK DPRK AC SYSTEM

29  Structural and regulatory barriers Political and administrative styles of regulation considering natural monopoly Political and administrative styles of regulation considering natural monopoly characteristics of transmission characteristics of transmission Treaty and Legal barriers Treaty and Legal barriers Economy-wide investment conditions Economy-wide investment conditions Legal framework for investors including financing Legal framework for investors including financing

30 <SCENARIOS>

31 <Scenarios>  Four Scenarios are proposed ex) (Scenarios-1) is … ex) (Scenarios-1) is … Power System Interconnection “ROK-DPRK-RF” Power System Interconnection “ROK-DPRK-RF” Capacity of 2~4GW HVDC, ± kV 1,260km Capacity of 2~4GW HVDC, ± kV 1,260km 3-C/S Terminal, Seoul, Pyongyang, Vladivostok 3-C/S Terminal, Seoul, Pyongyang, Vladivostok Composite system reliability analysis, HL II Level Composite system reliability analysis, HL II Level NEAREL(NEAREST-RELIABILTY) Program is developed NEAREL(NEAREST-RELIABILTY) Program is developed Composite System Reliability Program considering Generation, Composite System Reliability Program considering Generation, Transmission and Interconnected Tie Line Transmission and Interconnected Tie Line TEAG (Tie line constrained Equivalent Assisting Generator Model) TEAG (Tie line constrained Equivalent Assisting Generator Model) Considering Assisting System plus Tie Line Considering Assisting System plus Tie Line

32  (scenario-1) “ ROK-DPRK-RF ” 3-Terminal HVDC interconnection “ ROK-DPRK-RF ” 3-Terminal HVDC interconnection Converter stations will be located in Vladivostok, some point near Seoul Converter stations will be located in Vladivostok, some point near Seoul and Pyoung Yang HVDC system configuration HVDC system configuration VSC-HVDC, DC ±500kV VSC-HVDC, DC ±500kV T/L : 1,260km (1,010km+250km) T/L : 1,260km (1,010km+250km) ROK Seoul RFE Vladivostok DC ±500kV 1,010km DPRK Pyoung Yang DC ±500kV 250km

33  (scenario-2) “ ROK-RF ” 2-Terminal HVDC interconnection “ ROK-RF ” 2-Terminal HVDC interconnection DPRK provides the interconnected line route DPRK provides the interconnected line route Converter stations for supplying or receiving the power will be located in two places; Vladivostok and some point near Seoul Converter stations for supplying or receiving the power will be located in two places; Vladivostok and some point near Seoul HVDC system configuration HVDC system configuration VSC-HVDC, DC ±500kV VSC-HVDC, DC ±500kV T/L : 1,260km T/L : 1,260km

34  (scenario-3) “ ROK-RF ” 2-Terminal HVDC interconnection “ ROK-RF ” 2-Terminal HVDC interconnection Interconnected line via East Sea Interconnected line via East Sea It has the merits of energy security viewpoints when importing power fro m Russia without the demerits of passing through DPRK territory It has the merits of energy security viewpoints when importing power fro m Russia without the demerits of passing through DPRK territory HVDC system configuration HVDC system configuration VSC-HVDC, DC ±500kV VSC-HVDC, DC ±500kV T/L : 1,150km (Overhead + Cable) T/L : 1,150km (Overhead + Cable)

35  (scenario-4) “ ROK-RF ” BTB interconnection “ ROK-RF ” BTB interconnection BTB interconnected system in border area BTB interconnected system in border area Two converter stations will be located in the border area Two converter stations will be located in the border area : Russia-DPRK and DPRK-ROK : Russia-DPRK and DPRK-ROK Exchange power between Russia-ROK will be delivered Exchange power between Russia-ROK will be delivered through the AC power systems of DPRK through the AC power systems of DPRK HVDC system configuration HVDC system configuration VSC-HVDC, DC ±500kV VSC-HVDC, DC ±500kV

36  Proposal for “ROK-DPRK-RF” interconnection Overview of interconnection Overview of interconnection 3 Terminal PTP-HVDC system is suitable for interconnection 3 Terminal PTP-HVDC system is suitable for interconnection Converter stations are located at Vladivostok, Pyung Yang and Seoul Converter stations are located at Vladivostok, Pyung Yang and Seoul BTB – HVDC is not available due to weak power system of DPRK BTB – HVDC is not available due to weak power system of DPRK System configuration System configuration DC ±500kV, Multi-Terminal HVDC system DC ±500kV, Multi-Terminal HVDC system VSC type HVDC system is more appropriate for interconnection VSC type HVDC system is more appropriate for interconnection Two-Bipole DC transmission Two-Bipole DC transmission Feasible exchange power Feasible exchange power Feasible exchange power taking account of technical and economic constraints is 3GW to 4GW Feasible exchange power taking account of technical and economic constraints is 3GW to 4GW 3GW to 4GW is allowable from the viewpoint of energy security 3GW to 4GW is allowable from the viewpoint of energy security (About 5% of power demand in 2017) (About 5% of power demand in 2017)

37  NEAREST Scenarios for NEA 6-countries : 3 alternatives (Main Land) // (East Sea) // (Large New Interconnection) (Main Land) // (East Sea) // (Large New Interconnection) Multi-Terminal HVDC Interconnection, DC ±500-±600kV Multi-Terminal HVDC Interconnection, DC ±500-±600kV Possible for CBT caused by base and seasonal load difference Possible for CBT caused by base and seasonal load difference  Generation capacity is reduced and Capacity factor is increased for all interconnection scenarios. for all interconnection scenarios.  (Initially) CBT with contract base  (Finally) Market base is reasonable  Deregulation has positive effect on CBT, Uncertainty of DPRK, Pos./Neg. points of Energy security, Cooperate financing Pos./Neg. points of Energy security, Cooperate financing with government guarantee with government guarantee

38  Reliability study : Average reliability index of all countries is greatly increased Average reliability index of all countries is greatly increased But, ROK is slightly decreased in case of unidirectional supply from ROK to DPRK because of the severe electricity deficiency of DPRK Of course, after DPRK status is stabilized, reliability index of ROK Of course, after DPRK status is stabilized, reliability index of ROK will also be increased. will also be increased.  Different premises for each economic assessment : (Economic) : max/min import/export tariffs (Economic) : max/min import/export tariffs lower than (50-  )Won/kWh lower than (50-  )Won/kWh (Marketability) : About (40) Won/kWh for CBT (Marketability) : About (40) Won/kWh for CBT Similar results with unidirectional solution, but have small difference caused by different premise Similar results with unidirectional solution, but have small difference caused by different premise

39  Proposal for NEAREST region interconnection Overview of interconnection Overview of interconnection (Main Land Circle) 5 Countries : ROK, DPRK, RF, China, Mongolia (Main Land Circle) 5 Countries : ROK, DPRK, RF, China, Mongolia (East Sea Circle) 4 Countries : ROK, DPRK, RF, Japan (East Sea Circle) 4 Countries : ROK, DPRK, RF, Japan (Large New Circle) 6 Countries : ROK, DPRK, RF, China, Mongolia, Japan (Large New Circle) 6 Countries : ROK, DPRK, RF, China, Mongolia, Japan System configuration System configuration DC ±500kV, Multi-Terminal HVDC system DC ±500kV, Multi-Terminal HVDC system VSC type HVDC system VSC type HVDC system Two-Bipole DC transmission (Overhead + Cable) Two-Bipole DC transmission (Overhead + Cable) Power exchange pattern Power exchange pattern Seasonal power exchange between interconnected countries Seasonal power exchange between interconnected countries (Summer Season) RF, DPRK  ROK, Japan, China (Summer Season) RF, DPRK  ROK, Japan, China (Winter Season) ROK, Japan, China  RF, DPRK, Mongolia (Winter Season) ROK, Japan, China  RF, DPRK, Mongolia