EQUIVA Construction Camp A Joint Project Among: Shell Texas A&M Construction Science Texas Engineering Extension Service Texaco.

Slides:



Advertisements
Similar presentations
Plumbing.
Advertisements

Typical Plumbing System
The Home Inspection Book: A Guide for Professionals By Marcia Darvin Spada Copyright, Thomson/South-Western, 2003, Revised, 2006.
Plumbing.
Plumbing System Albert Einstein was named an honorary member of the Plumbers and Steamfitters Union after publicly stating that he would become a plumber.
Chapter 20 Plumbing Plans.
Plumbing for Kitchens & Baths
Technology in Architecture Lecture 15 Waste & Vent Systems Waste & Vent Sizing Procedure Bathroom Design Lecture 15 Waste & Vent Systems Waste & Vent Sizing.
Understanding and Designing Plumbing Systems
Understanding and Designing Plumbing Systems
Piping Drawings Chapter 21. Technical Drawing 13 th Edition Giesecke, Mitchell, Spencer, Hill Dygdon, Novak, Lockhart © 2009 Pearson Education, Upper.
Plumbing Systems CNST 305 Environmental Systems 1 Dr. Berryman
 Determine the waterline components needed to complete the water supply for the bathroom shown in figures 13-6 and 13-7.
Piping Materials Plumbing Systems CNST 305 Environmental Systems 1 Dr. Berryman 1bIntroduction – MaterialsChapter 1, 3; Appendix D (Wentz) and
Condensation Piping and Installation Drain Pans
Chapter 23 Plumbing Systems.
Steel Pipe Plumbing Systems
Hydronic Mechanical Controls
© Goodheart-Willcox Co., Inc. Permission granted to reproduce for educational use only Warm-up 4/6/15 What type of water do you have at your house? Objective:
SEWER PIPING DESIGN Sewer piping differs from water piping, in that sewer pipes are not under pressure. The function that takes place inside sewer pipes.
Facilities Management and Design Chapter 5 Water and Wastewater systems.
© Goodheart-Willcox Co., Inc. Permission granted to reproduce for educational use only 1 PowerPoint Presentation Publisher The Goodheart-Willcox Co., Inc.
1 HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview.
Ivy Tech Community College
Chapter 18 Plumbing Plans.
Residential Construction Unit 5 Energy Efficiencies and Mechanicals Mr. Todzia.
Plumbing Prints Unit 15.
Architectural Graphics UNT in partnership with TEA. Copyright ©. All rights reserved.
Introduction to Plumbing Date. Bellwork 0 Fill out your KWL sheet about plumbing 0 What do you K now about plumbing? 0 What do you W ant to learn about.
BUILDING MATERIAL BUILDING MATERIAL PALESTINE UNIVERSITY chapter No.#7 Mechanical Works Dr. Ali Ibrahim Tayeh.
Week 3. Electrical Code 1. all electrical outlets run off a pigtail from main line 2. Each Circuit is wired directly into circuit panel - no junction.
HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview.
Plumbing Unit.
Copyright © Texas Education Agency, All rights reserved. Architectural Graphics.
111 Dr. Nihad Almughany University of Palestine Faculty of Applied Engineering and Urban Planning Dept. of Architecture 2nd Semester Building.
Bellwork Fill out your KWL sheet about plumbing Fill out your KWL sheet about plumbing What do you K now about plumbing? What do you K now about plumbing?
Technology in Architecture Lecture 14 Upfeed Systems Pipe Sizing Procedure Pipe Sizing Example Lecture 14 Upfeed Systems Pipe Sizing Procedure Pipe Sizing.
CON 4003/CVE 4073/CVE 5073 Construction Estimating Prof R. V. Locurcio.
BASIC PLUMBING Theory, Repair, & Installation. PART ONE Overview & Safety  Objectives for the day.
IDENTIFYING AND SELECTING PLUMBING MATERIALS AND FITTINGS Original Power Point Created by Von Peavy Modified by the Georgia Agriculture Education Curriculum.
FLUID FLOW FOR CHEMICAL ENGINEERING Dr Mohd Azmier Ahmad Tel: +60 (4) EKC 212 CHAPTER 8 (PART 1) TRANSPORTATION SYSTEM.
Technology in Architecture
Materials Plastics.
C H A P T E R T W E N T Y- O N E PIPING DRAWINGS.
Plumbing is the directing of the flow of water. Usually considered in two parts Fresh water supply Pipes, fittings, and fixtures that supply hot and cold.
Facilities Management and Design Chapter 5 Water and Wastewater systems.
PIPING DRAWINGS C H A P T E R T W E N T Y- O N E.
PIPING DRAWINGS C H A P T E R T W E N T Y- O N E.
Chemical Engineering Drawing
Plumbing system fundamental and design course
Plumbing System Albert Einstein was named an honorary member of the Plumbers and Steamfitters Union after publicly stating that he would become a plumber.
Heating Ventilation and Air Conditioning
WATER DEMAND (Chapter 24)
Unit 13 Plumbing Prints. Unit 13 Plumbing Prints.
RESIDENTIAL PLUMBING SYSTEMS (WATER SUPPLY)
Plumbing.
Electrical Gas Plumbing Heating & Cooling
PLUMBING PLANS CHAPTER 31
Heating Ventilation and Air Conditioning
Typical Plumbing System
ME444 ENGINEERING PIPING SYSTEM DESIGN
Plumbing System Albert Einstein was named an honorary member of the Plumbers and Steamfitters Union after publicly stating that he would become a plumber.
Technology in Architecture
Technology in Architecture
Heating Ventilation and Air Conditioning
Technology in Architecture
Technology in Architecture
Technology in Architecture
Technology in Architecture
Plumbing System Albert Einstein was named an honorary member of the Plumbers and Steamfitters Union after publicly stating that he would become a plumber.
Presentation transcript:

EQUIVA Construction Camp A Joint Project Among: Shell Texas A&M Construction Science Texas Engineering Extension Service Texaco

DAY 4: AFTERNOON Dr. JOHN BRYANT

EQUIVA CONSTRUCTIONCAMP COSC PLUMBING Objectives »Materials »Code Considerations »Plumbing potable water supply Drain/Waste/Vent »Drawing Interpretation plan riser diagrams

EQUIVA CONSTRUCTIONCAMP COSC General Potable - drinking water Hard - high calcium carbonate content, prefer < 200 ppm »softening improves sudsing - zeolite treatment Flow Rate - gpm Head Pressure - column of water 1 foot high »0.434 psi/ft (62.5/144) Mains Pressure - typ psi »pressure regulator, backflow preventer Fixture Pressure - pressure required to operate a plumbing fixture Fixture Unit (FU); Drainage Fixture Unit (DFU) »weighted flow demand for a plumbing fixture for supply (FU) and waste (DFU)

EQUIVA CONSTRUCTIONCAMP COSC Codes IPC and UPC - Which one? »International Plumbing Code is Endorsed by; Building Officials and Code Administrators International (BOCA) International Conference of Building Code Officials (ICBO) Southern Building Code Conference International (SBCCI)

EQUIVA CONSTRUCTIONCAMP COSC Codes UPC and IPC - Which one? »Uniform Plumbing and Uniform Mechanical Codes are Endorsed by; International Association of Plumbing and Mechanical Officials (IAMPO) ICBO Key Point is to Make Sure You Know Which One is in Effect for Your Project!

EQUIVA CONSTRUCTIONCAMP COSC Materials and Methods Plumbing Design is Concerned with Piping Connections to Equipment »Water Service Pipes - copper, plastic, galvanized iron »Water Distribution Pipe - copper, plastic, galvanized »Above Ground Drainage and Vent Pipe - cast iron, type K, L, M, or DWV copper, galvanized, plastic »Underground Building Drainage Pipe - plastic, cast iron »Building Sewer Pipe - asbestos cement, cast iron, concrete, plastic, vitrified clay »Building Storm Sewer Pipe - asbestos cement, cast iron, concrete, type K, L, M, or DWV copper, vitrified clay

EQUIVA CONSTRUCTIONCAMP COSC Piping HVAC and Plumbing Systems Have Common Types »Steel Galvanized and Black (gas) - fittings and welded »Copper - usually soldered fittings Type K, L, M »Plastic PVC (polyvinyl chloride) PB (polybutylene, grey) FRP (fiberglass-reinforced plastic) CPVC (chlorinated PVC) PE (polyethylene)

EQUIVA CONSTRUCTIONCAMP COSC Corrosion Protection Use Di-Electric fittings to avoid Galvanic Corrosion, (especially on brass/iron connections) Plastics are the only Pipe Materials that are simultaneously light, flexible, tough, and corrosion resistant

EQUIVA CONSTRUCTIONCAMP COSC Hardware Valves »Gate; shutoff / isolation »Ball; regulate flow »Check; allows flow in one direction only »Pressure Reducing »Hose Bib; valve with hose connection Fittings & Accessories »Elbows, Tees, Flanges, Couplings, Unions »Air Management; air entrained in water can lead to “locks” in system »Hammer Arrestor »Trap Primer

EQUIVA CONSTRUCTIONCAMP COSC Fixtures Water Closet (WC) »vitreous china w/integral trap »wall and floor mount models »flush valve (commercial, ready for immediate reuse) Water Cooler/Drinking Fountain »individual fountain w/self contained water cooling units Sinks »lavatory, service, kitchen Urinal »similar to WC, siphon-jet, blowout, washdown, wall mount

EQUIVA CONSTRUCTIONCAMP COSC Drain, Waste, Vent - DWV General Items »Floor Drain Vent Within 12 ft. of Drain »No Drain Should Empty into a Smaller Drain »Vent at Least 1/2 Diameter of Drain to Which it is Connected »Not > 25% of Vent Length can be Horizontal »Good to Use 4” VTR »VTR Must Extend at Least 6” Above Roof, 12” is Better

EQUIVA CONSTRUCTIONCAMP COSC DWV General Items »Don’t Locate VTR Near Air Intake »Air Gaps at All Water Supply/Waste Outlets »4” Pipe Good Practice for W.C. »Connection Between Building and Floor Drain not Permitted by Some Codes »Building Drain Must be 4” if WC is on System

EQUIVA CONSTRUCTIONCAMP COSC Fixture Components Trap »Prevent backflow of sewer gas into the building space Air Gap »vertical separation between water supply and fixture rim

EQUIVA CONSTRUCTIONCAMP COSC DWV Trap Seal/Primer - prevents trap from drying out Clean Out (C.O.) - provides access to drainage stacks and main horizontal branches for cleaning Materials »Cast Iron, copper, clay, plastic, RCP

EQUIVA CONSTRUCTIONCAMP COSC Site Work Check Those Inverts! Where is Tie-in? Utility Coordination

EQUIVA CONSTRUCTIONCAMP COSC Storm Drainage Exterior Areas Require Drainage for Rain/Snow »roofs, patios, parking areas, roadways, landscaping, etc. Sizing of system depends on Rate rather than Total Size must be coordinated with public drain capability Codes dictate 1hr duration and 100 year event

EQUIVA CONSTRUCTIONCAMP COSC Rough-in What Are These? Is Slope Adequate?

EQUIVA CONSTRUCTIONCAMP COSC Rough-in Why do Dimensions Matter? Where are Fixtures to be Located? Does Everything Match? Is Now the Time to Ask?

EQUIVA CONSTRUCTIONCAMP COSC Rough-in Do Dimensions Matter? Layout Lines?

EQUIVA CONSTRUCTIONCAMP COSC Rough-in Do Dimensions Matter? Note Seal on PVC Waste Stack What Fixtures are Going in Here?

EQUIVA CONSTRUCTIONCAMP COSC Rough-in Backfill and Compacting. How Much? Soil in Pipe? Was it Inspected and Tested?

EQUIVA CONSTRUCTIONCAMP COSC Rough-in Floor Sinks in Right Location? Protection? Is Anything Missing? Is Now the Time To Ask?

EQUIVA CONSTRUCTIONCAMP COSC Rough-in Why Should Dimensions Matter? Why Sleeve Copper Penetrations Through Concrete? What Fixture is Being Connected Here?

EQUIVA CONSTRUCTIONCAMP COSC Rough-in Was it Tested? Did it Pass? What Goes in Here? Is Anything Missing? Is Now the Time to Ask?

EQUIVA CONSTRUCTIONCAMP COSC Rough-in What Are These? Traps Connected to Primer?

EQUIVA CONSTRUCTIONCAMP COSC Rough-in Trap Primer Header Hot Water Pipe PVC Vent Pipe

EQUIVA CONSTRUCTIONCAMP COSC Rough-in PVC Vent Pipe VTR

EQUIVA CONSTRUCTIONCAMP COSC Trim Cleanout Locations UPC Section ft. max. Between Cleanout Locations 90° Changes

EQUIVA CONSTRUCTIONCAMP COSC Trim Double-Check Backflow Preventer Air-Gap Drain Escutchen Plate Ball Valves

EQUIVA CONSTRUCTIONCAMP COSC Trim Location, Location, Location Faucet Mounting Air-Gap at Floor Drain CO at Drain

EQUIVA CONSTRUCTIONCAMP COSC Trim Air Gap Required at Food Prep Sinks UPC Section 601 Floor Sink vs. Floor Drain

EQUIVA CONSTRUCTIONCAMP COSC Trim Floor Drain Location Note Trap on Condensate Drain Funnel Aids With Flow Control Door Stop - For How Long?

EQUIVA CONSTRUCTIONCAMP COSC Trim Condensate Drain from Rooftop HVAC Units Roof Penetration

EQUIVA CONSTRUCTIONCAMP COSC Trim Condensate Drains from Interior Refrigeration Units Trapped at Floor Drain Check Slope

EQUIVA CONSTRUCTIONCAMP COSC Trim Dielectric Connections at Water Heater? Overflow Pan Drains to…? Pressure Relief Drains to…? Replace Plastic Drain Valve Adequate Clearances?

EQUIVA CONSTRUCTIONCAMP COSC Trim Filtered Water System Mounting Required Height? Accessibility? Serviceability?

EQUIVA CONSTRUCTIONCAMP COSC Project Documentation As Builts »What Did You Do That Was Different Than the Contract Drawings? »Who Keeps Track During Construction? Other Important Documents »List of Contractors »Permits Issued »Construction Cost Information »Guarantees/Warrantees

EQUIVA CONSTRUCTIONCAMP COSC Project Documentation Daily Log Book »Weather »Contractors »Deliveries »% Work Completed »Problems »RFI, CO »Telecon, Meetings

EQUIVA CONSTRUCTIONCAMP COSC Safety OSHA and Record Keeping We Want to Avoid the High Cost of Accidents Who is Responsible for Jobsite Safety?

EQUIVA CONSTRUCTIONCAMP COSC Plumbing Below Grade Where are the VTRs? FD Locations? Trap Primers? City Water Utility Tie-in?

EQUIVA CONSTRUCTIONCAMP COSC Plumbing Above Grade Check Insulation on Exterior Pipes! Water and Gas Pressure? Pipe Supports

EQUIVA CONSTRUCTIONCAMP COSC Are You Any Smarter? Bubba

EQUIVA CONSTRUCTIONCAMP COSC Lab Exercises with Slick Powers DWN: J. Bryant 2/13/00 Scale: NTS Date: 2/13/00 REV. 1

EQUIVA CONSTRUCTIONCAMP COSC Lab Exercises with Slick Powers DWN: J. Bryant 2/13/00 Scale: NTS Date: 2/13/00 REV. 1

EQUIVA CONSTRUCTIONCAMP COSC Lab Exercises with Slick Powers DWN: J. Bryant 2/13/00 Scale: NTS Date: 2/13/00 REV. 1

EQUIVA CONSTRUCTIONCAMP COSC Lab Exercises with Slick Powers DWN: J. Bryant 2/13/00 Scale: NTS Date: 2/13/00 REV. 1

EQUIVA CONSTRUCTIONCAMP COSC Lab Exercises with Slick Powers DWN: J. Bryant 2/13/00 Scale: NTS Date: 2/13/00 REV. 1

EQUIVA CONSTRUCTIONCAMP COSC Lab Exercises with Slick Powers DWN: J. Bryant 2/13/00 Scale: NTS Date: 2/13/00 REV. 1

EQUIVA CONSTRUCTIONCAMP COSC Lab Exercises with Slick Powers DWN: J. Bryant 2/13/00 Scale: NTS Date: 2/13/00 REV. 1

EQUIVA CONSTRUCTIONCAMP COSC Lab Exercises with Slick Powers DWN: J. Bryant 2/13/00 Scale: NTS Date: 2/13/00 REV. 1

EQUIVA CONSTRUCTIONCAMP COSC Lab Exercises with Slick Powers DWN: J. Bryant 2/13/00 Scale: NTS Date: 2/13/00 REV. 1

EQUIVA CONSTRUCTIONCAMP COSC Lab Exercises with Slick Powers DWN: J. Bryant 2/13/00 Scale: NTS Date: 2/13/00 REV. 1