ECC update: some highlights of ECC’s recent regulatory activities R&TTE CA Plenary meeting 19 May 2014, Amsterdam Alexander Gulyaev, ECO.

Slides:



Advertisements
Similar presentations
ITU Regional Development Forum - Warsaw 7 May The Radio Spectrum Policy Programme & the Spectrum Inventory Pearse ODonohue Head of Radio Spectrum.
Advertisements

Shared Use of Radio Spectrum in the EU
ECC initiatives on spectrum for Programme Making and Special Events - PMSE Bruno Espinosa Deputy Director, ECO, Copenhagen.
Activities in CEPT ECC/WGFM/ Project Team FM54
ECC update: the newly approved deliverables and some highlights of regulatory activities R&TTE CA Plenary meeting 27 November 2013, Las Palmas, Gran Canaria.
More than bandwidth - spectrum harmonisation for wireless broadband in Europe Mark Thomas, ECO Director, WWRF33, Guildford,25th September 2014.
On-Going Activities in the CEPT (European Spectrum Regulation) for Applications in Transport and Traffic Telematics including Sensors Interactive Workshop.
INTERNATIONAL FREQUENCY COORDINATION – FURTHER HARMONISATION IN UHF? Mark Thomas, Director ECO – Warsaw, 20 October 2011
Geolocation databases for spectrum sharing : ECC findings and studies EC DG CONNECT Workshop, 20 March 2015 Bruno Espinosa, Deputy Director, ECO.
UK Spectrum Management Strategy: tomorrow’s challenges today Chris Woolford Director, International Spectrum Policy Radcomms 2014.
SPECTRUM REGULATION IN EUROPE, ECC ACTIVITIES RELEVANT FOR UTILITIES Bruno ESPINOSA, ECO
10 th International Electronic Communications Regulators Conference 8 th May 2015 Future of mobile: 4G and Beyond Eric Fournier Chairman, Electronic Communications.
New Federal Spectrum Access System - US 3.5GHz bands -
On-going developments for Wireless Industrial Applications (WIA) in CEPT/ECC Workshop on Wireless Resources for advanced Manufacturing Brussels, 30 October.
ECC and the evolving spectrum policy Conference on spectrum management: perspectives, challenges and strategies Lisbon, 20 September 2013 Eric Fournier.
ECC is modernising its regulatory framework towards enabling 4G services (reviewing the process of changing regulation for the ‘core’ 2 GHz mobile band)
LSA in the 2.3 – 2.4 GHz band Bruno ESPINOSA, ECO Trial LSA workshop, Helsinki, 3rd September.
Coexistence challenges in the UHF band Bruno ESPINOSA European Communications Office (ECO) Overview of CEPT/ECC actions.
LONG TERM VISION FOR THE UHF BROADCASTING BAND FORECAST 2014, Shaping future broadcasting EBU, Geneva 5-6 November 2014 Session 1 – How will the UHF band.
WRC-2003 Mike Goddard Spectrum Policy and International Director Radiocommunications Agency.
Doc.: IEEE /016r0 Submission March 2003 Andy Gowans - UK RA Andy Gowans Private Business Systems Unit Radiocommunications Agency
Implementation of LSA in the 2.3 – 2.4 GHz band Bruno ESPINOSA, ECO Ministero dello Sviluppo.
A new challenge – creating a regulatory environment for implementing geo-location databases for White Space Devices (WSD) Andy Gowans Date (26 th January.
ECC: what is the current status of 5G … Stella Lyubchenko, ECO 2 nd JRC Seminar on 5G Communications, Ispra, 19 th May.
©Ofcom IEEE 802 Plenary, Dallas, Tx RRTAG( ) meeting Consultation on Safety Related ITS 12 th November 2008 Andrew Gowans, Head of Exempt Technology.
Jaime Afonso ECC Vice-Chairman The 5th TD-LTETechnology and Spectrum Workshop Budapest, October 12th TDD Development in Europe and Future Planning of 3.5GHz.
CEPT preparations status for WRC-15 Mr. Per Christensen (ECO Director) August 2015 The second Annual Middle East & North Africa Spectrum Management Conference,
CEPT positions for WRC-15 Mr. Alexander Kühn CPG-15 Chairman October 2015.
Activities in CEPT (European Spectrum Regulation) for Applications in Transport and Traffic Telematics including Sensors Trends in Automotive Radar and.
Doc.: IEEE /12??r0 SubmissionSlide 0 IEEE 802 Plenary, Dallas, Tx RRTAG( ) meeting Consultation on Safety Related ITS 12 th November 2008.
Major topics from ECC strategic plan Spectrum issues Peter Faris 4 th CEPT Workshop on European Spectrum Management and Numbering 5 th April 2016.
AI MHz MHz ECC DEC (15)01 + CEPT report 53 ECC-FCC-IC Liaison Meeting Maisons Alfort, May 2015 Didier Chauveau ECC PT1 Chairman.
Use of Spectrum Bands Above 24 GHz For Mobile Radio Services ‘5G’…
,4-3,8 GHz ECC Decision (11)06 + Guidelines to support the implementation of this framework at national level (mobile/FSS and mobile/FS coexistence)
Spectrum Regulations for Short Range Devices in Europe
ECC: what we do The ECC: Brings together representatives from CEPT members (48) Develops common policies and regulations A focal point for information.
Spectrum harmonised for IMT
1210 MHz of harmonised spectrum (ECC framework)
Updates on the digital dividend and UWB in the UK and Europe
EBU FORECAST November 2016 Spectrum for 5G
Dr Mohaned Juwad Senior Manager – Spectrum Strategy Intelsat
Coexistence challenges in the UHF band
GRSC Radio Microphone Task Force Report
Challenges and opportunities for CEPT
CEPT/ECC-ETSI Co-operation Process
Thomas Weilacher WG FM Chairman
Studies on 5 GHz extension bands for WAS/RLANs
Thomas Weilacher WG FM Chairman
Session 2 European Regulatory Environment (just a part!)
Dr. Mohaned Juwad Intelsat, Spectrum Strategy
Status On Current DFS CEPT/ECC Civil/Military Meeting, November 2016, Prague Thomas Weber, ECO, Spectrum Management
Session 3: Major topics on Spectrum
CEPT ECC Vice Chairman Jaime Afonso
Wi-Fi Alliance meeting
Broadband PPDR frequency situation in Europe
Radio spectrum for future railway applications
5G and IMT Identification - Views from CEPT-
Eric Fournier Chairman, Electronic Communications Committee
European Regulatory Environment (just a part!)
European 5G regulatory developments
EU-US-JP ITS Steering Group Annual Meeting 2018
CEPT ECC Vice Chairman Jaime Afonso
Spectrum Regulations for Short Range Devices in Europe
World Radiocommunications Conference
September 2003 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Millimeter wave frequency allocation.
Eric Fournier Chairman, Electronic Communications Committee
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Regulatory Update in Europe for Gigabit Application.
ECC actions on interference from 5 GHz RLAN into meteorological radars
INMARSAT > CTO> RMA
Preliminary GSC positions on WRC-19 agenda items 1.13 IMT
Presentation transcript:

ECC update: some highlights of ECC’s recent regulatory activities R&TTE CA Plenary meeting 19 May 2014, Amsterdam Alexander Gulyaev, ECO

Outline Footer - add copy here1 Outline: 1.5GHz Wi-Fi “extension bands”: a complex technical task MHz range: updated technical conditions for base stations and terminals 3.PMSE: securing the future from a spectrum perspective

Footer - add copy here2 Current trends in developing new ECC regulatory frameworks  Recent years ECC regualtory policy aims to ensure the continued liberalisation of existing regulatory provisions (especially where technology neutrality is promoted), the exemption of devices from individual licensing, and how new services may be introduced on a shared-spectrum basis with existing ones  Notified Bodies are encouraged to follow ECC Newsletters which address most important activities within the ECC and may have impact on the work of Notified Bodies (most recent ECC Newsletter is of April 2014 (this presentation is based on the content in this Newsletter but tailored to the R&TTE CA context)ECC Newsletters ECC Newsletter

Footer - add copy here3 5GH Wi-Fi “extension bands”: a complex technical task The greater growth is now in data traffic over RLAN networks (Wi-Fi) than over mobiles, although Wi-Fi access points are considered as complementary to mobile internet services. Nomadic and static Wi-Fi usage profiles stipulate the need for higher spectrum bandwidth! Majority of Wi-Fi devices in use today are still operated in the 2.4 GHz band (83.5 MHz wide) and are using 20 MHz or 40 MHz channels. A new generation of Wi-Fi (known as IEEE ac) will be able to achieve throughput rates sufficient enough to extend existing high-speed fixed broadband infrastructures wirelessly (providing data rates of 30 or 100 Mbps or more when using 80 MHz and/or 160 MHz channels)

Footer - add copy here4 5GH Wi-Fi “extension bands”: a complex technical task EU: Digital Agenda for Europe: sufficient spectrum resources should be available on a harmonized basis to support the evolution (in particular, the use of larger channel bandwidths) of WAS/RLAN technologies: Digital Agenda for Europe EC Mandate to CEPT (September 2013) to develop harmonized technical conditions for WAS/RLAN in the bands MHz and MHz ('WAS/RLAN extension bands'). The aim: to enable a future Wi-Fi usage of the whole range MHz (including the 455 MHz of already designated in 5 GHz spectrum) based on a general authorisationEC Mandate The new WAS/RLAN spectrum bands are also under discussion in the preparation for AI 1.1 of WRC-15 (primary allocation to Mobile Service).

Footer - add copy here5 5GH Wi-Fi “extension bands”: a complex technical task Technical challenge in the 5 GHz: many incumbent users in the band (as well as in the adjacent bands) also have high priority and right to protection, including: o the European Earth monitoring programme GMES (Global Monitoring for Environment and Security), now known as “Copernicus”, and o ITS (Intelligent Transport Systems), including safety-related systems The interference situation in the current “5 GHz Wi-Fi bands” (i.e MHz and MHz) should continue to be in the focus of NBs (recent ECC Report 192 on issues with Dynamic Frequency Selection in the 5 GHz range, Final Report on ADCO R&TTE 5 GHz campaign, coordination of follow-up actions at the European level)ECC Report 192

Footer - add copy here6 5GH Wi-Fi “extension bands”: a complex technical task Timing: the CEPT work in response to the EC Mandate is divided into three steps: Interim Report (March 2014) - a description of work undertaken and interim results under tasks (1) and (2) of the EC Mandate CEPT Report A (March 2015) – main technical results before WRC-15, and CEPT Report B (July 2016) – ‘sanity check’ after WRC-15 (in order to reconfirm the technical conditions provided in CEPT Report A)

Footer - add copy here7 5GH Wi-Fi “extension bands”: a complex technical task Notified Bodies: follow closely the evolution of the ETSI standards and national regulatory frameworks of European countries in respect of the DFS requirements in Wi-Fi consumer products in the existing 5 GHz bands ( MHz and MHz), based on the conclusions of ECC Report 192ECC Report 192 follow and note the outcome of the CEPT work on the technical requirements for the “WAS/RLAN extension bands” ( MHz and MHz)

Footer - add copy here MHz range: updated technical conditions for base stations and terminals The MHz is a large amount of still partly under-used spectrum open for future, truly broadband, mobile applications ECC used over two years for studies to complete its regulatory and technical work for this band since the adoption in December 2011 of a Decision (ECC/DEC/(11)06) This work has resulted in: ECC Report 203,ECC Report 203 CEPT Report 49, andCEPT Report 49 updated ECC/DEC/(11)06ECC/DEC/(11)06

Footer - add copy here MHz range: updated technical conditions for base stations and terminals Scope of review of ECC/DEC/(11)06: TDD was declared as the "preferred" frequency arrangement and FDD – as an "alternative" for the MHz sub-band (the upper sub-band MHz was initially harmonized for exclusive TDD use) Block Edge Masks (BEMs) for TDD and FDD modes were developed which are applicable to MFCN base stations with different power levels (i.e. macro, micro, pico and femto BS).

Footer - add copy here MHz range: updated technical conditions for base stations and terminals The updated ECC/DEC/(11)06 does NOT contain a BEM for terminals (UE – user equipment), therefore terminals out-of-band emission (OOBE) levels will be specified only in the relevant ETSI standards. HOWEVER: The updated ECC/DEC/(11)06 contains a recommended value of maximum UE in-block power which is set to 25 dBm (it’s specified as e.i.r.p. for UEs designed to be fixed or installed and as TRP for UEs designed to be mobile or nomadic). A tolerance of up to 2 dB has been included in the above limit, to reflect operation under extreme environmental conditions and production spread. A new EC Decision 2014/276/EU (amending the current EC Decision 2008/411/EC on the MHz) which is binding on EU Member States specifies the maximum UE in-block power value of 25 dBm as “technical conditions for terminal stations” but contains a provision stating that Member States may relax this limit under certain circumstances, for example fixed terminal station.2014/276/EU2008/411/EC

Footer - add copy here MHz range: updated technical conditions for base stations and terminals Notified Bodies: in assessing the compliance of MHz IMT terminals attention should be paid to the actual relevant national regulation, i.e. the arbitrary chosen maximum in-block power limit which is set in ECC/DEC/(11)06 and EC Decision 2014/276/EU to 25 dBm as a default value.

Footer - add copy here12 PMSE: securing the future from a spectrum perspective TV, theater and other show progamme making facilities have a huge public and social importance; look at the public interest to the recent Eurovision contest 2014 in Copenhagen! The need for frequencies (for audio, video and service links) that support the making of programmes, as well as a much wider range of cultural, social and economic activity, are a major element in the frequency management. However, wireless microphones are in international frequency law the 'secondary service‘! CEPT has carried out an extensive series of studies, also in response to the recent EC Mandate which will serve as a technical basis for the Commission's next steps in policy-making towards PMSE (Programme Making and Special Events).EC Mandate

Footer - add copy here13 PMSE: securing the future from a spectrum perspective Three elements of the recent CEPT work related to PMSE: Duplex gaps at mobile allocations in 1800 MHz and 800 MHz, and also in the 700 MHz (duplex band and guard band) “L-band”: o MHz range was considered as a potential new space for PMSE, however this is now harmonized by ECC/DEC/(13)03 to mobile supplemental downlink (SDL).ECC/DEC/(13)03 o MHz band has recently been identified by CEPT for indoor operation of wireless microphones o MHz band is currently under study Cognitive approaches: more as a means of protecting PMSE from 'white space devices' than as a vehicle for PMSE itself

Footer - add copy here14 PMSE: securing the future from a spectrum perspective Major CEPT/ECC deliverables on PMSE: ECC Decision (09)03 on MFCN in the 800 MHz band (Annex 3, section 3.1 – “Technical conditions for PMSE equipment”)ECC Decision (09)03 ERC Recommendation (currently under review): the tuning ranges for PMSEERC Recommendation ERC Recommendation (Annex 10)ERC Recommendation ECC Report 191 and an addendum to CEPT Report 50 (usability of center gaps in the 1800 MHz and the 800 MHz mobile allocations):ECC Report 191an addendumCEPT Report 50 CEPT Report 51: 8 frequency bands between 2 and 8 GHz which were proposed as alternative bands for cordless camerasCEPT Report 51 ECC Report 204: spectrum use and future requirements for PMSEECC Report 204

Footer - add copy here15 PMSE: securing the future from a spectrum perspective Need to explore further sharing opportunities to accommodate PMSE spectrum requirements, e.g. in the L-band: the spatial environment of downlink frequencies is much more predictable (given a channelling plan and specific base station siting) than for uplinks with their mobile terminals eventually being placed anywhere…

Footer - add copy here16 PMSE: securing the future from a spectrum perspective New technologies for wireless microphones: short and medium term: wireless microphones will remain largely analogue devices, while digital solutions could provide for greater security of quality in environments of light to moderate interference cognitive techniques for individual microphones is rather a long- term option

Footer - add copy here17 PMSE: securing the future from a spectrum perspective Notified Bodies: in assessing the PMSE equipment attention should be paid to multiple PMSE frequency options, varying from country to country, and the associated technical conditions in CEPT regulations and relevant ETSI harmonsied standards. More complex technical requirements ensuring compatibility of PMSE with other ‘primary systems’ may be expected in the future that will in turn result in higher complexity of test reports and more sophisticated assessment procedures.

ECC deliverables currently under the public consultation ECC deliverables open for public consultation are available at: 18

ECO is always ready either to respond directly to the requests from R&TTE CA regarding ECC regulations or to assist in consultations between R&TTE CA and relevant ECC specialist groups