Presentation on the Salient Aspects of STATE DATA CENTRE.

Slides:



Advertisements
Similar presentations
Objectives: Chapter 9: Data Centre Architecture VLAN definition and benefits * VLANs and broadcast domains * Routers role in VLANs * Types of VLANs * VLANs.
Advertisements

Source One Source One Network and Building Solutions.
MUNIS Platform Migration Project WELCOME. Agenda Introductions Tyler Cloud Overview Munis New Features Questions.
Software Quality Assurance Plan
Network Design and Implementation
Project Management Methodology Procurement management.
1 NIC / NICSIGePNIC - MMP Overview & Status of eProcurement implementation under Mission Mode Project As on
Management of IT Environment (5) LS 2012/ Martin Sarnovský Department of Cybernetics and AI, FEI TU Košice ITIL:Service Design IT Services Management.
Date: 03/05/2007 Vendor Management and Metrics. 2 A.T. Kearney X/mm.yyyy/00000 AT Kearney’s IT/Telecom Vendor Facts IT/Telecom service, software and equipment.
1 IS112 – Chapter 1 Notes Computer Organization and Programming Professor Catherine Dwyer Fall 2005.
Business Intelligence Dr. Mahdi Esmaeili 1. Technical Infrastructure Evaluation Hardware Network Middleware Database Management Systems Tools and Standards.
Interior Lifestyles Pvt. Ltd Welcome to our six step process for Interior designing of your commercial space. 6 6.
Data Center Design Christopher Geyer. A Data Center Highly secure, fault-resistant facilities housing equipment that connect to telecommunications networks.
Presented by INTRUSION DETECTION SYSYTEM. CONTENT Basically this presentation contains, What is TripWire? How does TripWire work? Where is TripWire used?
Request For Proposal Barbara Antuna Ronald Healy Chad Hodge Andrew James Mel Ocampo.
Basel Accord IITRANSITIONSERVICES Business Integration Support FCM Management Limited Paris New York Toronto.
Computer Associates Solutions Managing eBusiness Catalin Matei, April 12, 2005
Maintaining a Microsoft SQL Server 2008 Database SQLServer-Training.com.

ENAM ENAM - INFRA Project 2013.
I. C. T Mission University of Kashmir. University - Profile  Established in 1950  NAAC Accredited Grade “A” University  Two more Campuses established.
Managing Computerised Offices Operating environment
New Facilities & Disaster Recovery Solutions 0 February 20, 2007 Agency IT Resources Communications Exchange Meeting Facilities and Disaster Recovery Solutions.
Current Job Components Information Technology Department Network Systems Administration Telecommunications Database Design and Administration.
Version 4.0. Objectives Describe how networks impact our daily lives. Describe the role of data networking in the human network. Identify the key components.
ISA 562 Internet Security Theory & Practice
IT Update Sally Waselik June 2005 IOC meeting. IT Vision - “We Deliver Quality Solutions For Our Customers” 2 Today l Level of Service Concepts l IT Enterprise.
Property of Allstate Insurance Company – Proprietary & Confidential Allstate Business Intelligence COE SAP BusinessObjects deployment at Allstate Steve.
1 November 2008 David Hall Sales Manager – New Business Data Centre Hosting for the M-Business.
IT Infrastructure Chap 1: Definition
2 Systems Architecture, Fifth Edition Chapter Goals Describe the activities of information systems professionals Describe the technical knowledge of computer.
U.S. Department of Agriculture eGovernment Program August 14, 2003 eAuthentication Agency Application Pre-Design Meeting eGovernment Program.
Supporting Services in Schools ICT Service Level Agreement Howard Lazarus - ICT Support Manager Martin Morgans - Datacentre Manager.
Data Synchronization by Dennis Sparrow. Infrastructure  New York Board of Trade (NYBOT) maintains 3 sites –Primary Trading Floor –Primary Data Center.
COGNIZANT TECHNOLOGY SOLUTIONS PRIVATE. LTD Monthly Review Meeting – August 2008.
1 Drivers for Building Life Cycle Integrations Jim Sinopoli.
E.Soundararajan R.Baskaran & M.Sai Baba Indira Gandhi Centre for Atomic Research, Kalpakkam.
Service Level Agreements Service Level Statements NO YES The process of negotiating and defining the levels of user service (service levels) required.
Welcome Georgia Infrastructure Transformation 2010 Kick-off Meeting January 30, 2008.
VMware vSphere Configuration and Management v6
Module 1 Introduction to Designing a Microsoft® Exchange Server 2010 Deployment.
February 20, 2006 Nodal Architecture Overview Jeyant Tamby 20 Feb 2006.
PI in a Modern Power Plant – American National Power, Inc. PI User Conference ‘03 Presented by: Brian M. Wood, American National Power, Inc More Uses Than.
Cloud Computing Use Case Draft v2.
Ipswich City Precinct. 6. ICC Precinct Installation Standards & Regulatory Compliance ICT Infrastructure Integration & Convergence 1. Pit & Pipe Underground.
Raya for Information Technology. About US  Raya IT, established in 1998, operates in the field of systems integration and IT business solutions.  A.
Chapter 12 The Network Development Life Cycle
State of Georgia Release Management Training
MANAGED LAN SERVICES How will you benefit? Managed LAN service  Full LAN service (hardware, operation, other services)  Per-port pricing  International.
OCLC ILLiad hosted service March 18 th, 2010 The who, what, why, when and how of ILLiad hosting.
High Availability Environments cs5493/7493. High Availability Requirements Achieving high availability Redundancy of systems Maintenance Backup & Restore.
Analysis and Forming of Energy Efficiency and Green IT Metrics Framework for Sonera Helsinki Data Center HDC Matti Pärssinen Thesis supervisor: Prof. Jukka.
West Cambridge Data Centre Ian Tasker Information Services.
City of Hyattsville City Council IT Briefing October 19, 2015 dataprise.com | #ITinRealLife.
Dr. Ir. Yeffry Handoko Putra
NG/VITA Strategy & Architecture Tony Shoot
Review of IT General Controls
Chapter 1 Computer Technology: Your Need to Know
Disaster Recovery Testing.
Deploying a Million-AP WiFi Network
It’s all about the dpisd dr plan
Headgroup Meeting Data Centre Migration
Agency IT Resources Communications Exchange Meeting
Audit Plan Michelangelo Collura, Folake Stella Alabede, Felice Walden, Matthew Zimmerman.
IT INFRASTRUCTURES Business-Driven Technologies
What a non-IT auditor needs to know about IT & IT controls
Your Solution for: Energy Smart Management Real Time Power Monitoring Fuel Theft Prevention Technical presentation.
Data Centre Environment
The Survival Plan.
PerformanceBridge Application Suite and Practice 2.0 IT Specifications
Presentation transcript:

Presentation on the Salient Aspects of STATE DATA CENTRE

General Overview  SDC is identified as one of the important element of the core infrastructure for supporting e-Governance initiatives of NeGP for consolidating services, applications and infrastructure to provide efficient electronic delivery of G2G, G2C and G2B services.  SDC would act as a central repository for consolidation of the disaggregated resources.  The physical space required for the Data Centre would be the responsibility of the State. The Back-End computerization of the Departments would be the responsibility of the State.

General Overview (Contd.)  The architecture of a Data Centre would be such as to provide a model environment capable of handling the typical business model of dynamic change supporting multiple G2G, G2C, G2B, B2C activities across all channels like CSCs, portals, kiosks etc.  A centralized management and monitoring system (tool) capable of doing fault management, configuration management, security management, report generation, alerting, monitoring the critical servers, log monitoring and Data Centre network and security infrastructure etc. would be part of the Data Centre.

General Overview (Contd.) The high availability is one of the critical requirements of the Data Centre. As the systems are centralized at Data Centre, the State would be required to establish appropriate Disaster Recovery and Business Continuity Plan (DR and BCP) along with appropriate data backup and recovery infrastructure. Initially, State should plan for off-site Back-up mechanism for their DR strategy and depending upon mission critical requirement the BCP requirement would be met through the design architecture of the primary Data Centre itself. The objective of the Scheme is to create a secure close user group (CUG) government network for the purpose of delivering G2G and G2C services.

General Overview (Contd.) SDC scheme has been approved by Government with an outlay of Rs Crores over a period of 5 years. The Disaster Recovery (DR) arrangement has been envisaged to be established and provided by NIC.

Components of the SSDC CAPEX Components Site Preparation Support Infrastructure (HVAC, Fire Suppression and Detection, DG sets, UPS, Electrical works, Access Control & CCTV, BMS, Water Leak Detection System etc.) IT Infrastructure Routers, Network Switches, IPS, UPS, LAN Passive Components) Computing Resources (Web Servers, Application Servers, Storage, DB Servers)

OPEX Components Components in purview of the RFP Facility Management Expenditure License and Software Cost Components not in purview of the RFP Administrative Costs Diesel Running Cost Electricity Running Cost Bandwidth Cost Components of the SSDC(Contd.)

Salient Features of the RFP  Eligibility Criteria  Scope of Work  Estimated Timelines  Service Level Agreement  Evaluation Criteria  Solution Architecture  Bill of Material  Technical Specifications – IT Components  Technical Specifications – Non IT Components  Compliance Specifications

Salient Features of the RFP(Contd.) Model on a Turnkey basis(Site Preparation, Operation and Maintenance) Duration of the Project – 5 years Submission of Pre-Qualification,Technical and Financial Bids Selection Methodology – Quality cum cost based selection Pre-qualification - Compliance to Eligibility Criteria,Technical Evaluation (a minimum of 70 marks), Key evaluation parameters - Relevant past experience, solution / design & architecture proposed, solution scalability, SLA, manpower proposed etc. Commercial bid - Quality-cum-Cost based selection Service oriented approach SLAs for performance based monitoring Pre-Qualification Criteria Technical Evaluation Crteria

SCOPE OF WORK Basic Infrastructure Services Managed Services  Monitoring and Management Services  Help Desk Services  Server Monitoring (Hardware & Operating System), Administration & Management Services  Database Administration & Management Services  Storage Administration & Management Services  Security Administration Services  Network Monitoring Services  Back Up / Restore Services  Vendor Management Services

Scope of Work (Contd.) Roles and Responsibilities during Operation & Maintenance Phase  Project Management  System Administration & Management  Storage Administration  Security Administration  Database Administration  Application Monitoring, Maintenance & Administration  Change Management  Help Desk and Monitoring Team

Other Important Salient Points Bill of Material Amendments in the Commercial,Technical & Bid Process Specifications Manpower Resources Timelines Implementation Schedule

Site Progress Update up to 30 th Sept 2010 for the Sikkim State Data Centre

Work Completed Civil Fire Retarded Door Installation Work Insulation work in Server Farm area - True Ceiling & True Floor Granite flooring work in office area False flooring in Server, NOC & UPS room False ceiling in Server room and office area Gypsum Board partition One coat of non fire rated color completed in office area. DG foundation Guard wall behind DG foundation One coat applied on external walls

Electrical & BMS Electrical Conduiting and Cabling, LT Panel, UPS, PDU, AMF panel & battery rack positioning. 20 Nos. Earth Pits completed. Lighting Fixture Installed and green SDC Internal cabling for LT Panel, UPS & PDU Cable tray for DG & Transformer power cables PAC Indoor - Outdoor units installed, copper piping & Pressure testing Completed CAC outdoor units installed, copper piping Completed. Cabling for CCTV, Access control, Smoke detectors VESDA and Gas suppression piping tested Conduiting for rodent repellent system Electrical Conduiting and Cabling, LT Panel, UPS, PDU, AMF panel & battery rack positioning. 20 Nos. Earth Pits completed. Lighting Fixture Installed and green SDC Internal cabling for LT Panel, UPS & PDU Cable tray for DG & Transformer power cables PAC Indoor - Outdoor units installed, copper piping & Pressure testing Completed CAC outdoor units installed, copper piping Completed. Cabling for CCTV, Access control, Smoke detectors VESDA and Gas suppression piping tested Conduiting for rodent repellent system Work Completed

Work to be Complete / In progress Civil Fire rated area paint & painting of outside walls. Aluminum frame door installation for cabins. NOC room fire rated glass installation Furniture laminated sheet work. Installation of Racks Electrical & BMS Transformer & DG Cabling to LT panel. LT Panel connectivity, Battery installation, UPS connectivity DG Installation BMS equipments and panel installation

Material Delivery Status  Material Delivered as on date Civil Work related materials, Doors, Furniture Items, False Floor & Ceiling. Electrical Work related material, PAC, CAC, UPS, LT Panel, PDU, Racks, Novec Gas Cylinder. Licenses from Microsoft, Red Hat, SQL & Oracle IT Hardware & networking (IBM Servers, SAN, SAN Switches, 3-Com Network Equipments) Material under dispatch / In Transit DG Sets, BMS equipment and panels Chairs for SDC. NOC Room Fire rated vision glass. Syslog server

Current Challenges Water seepage issue in UPS room coming from third & second floor. DG Foundation area road clearance for DG installation. Currently two temporary canteens are located there. SDC wants to remove canteens and install DG from 15 th to 19 th Oct 2010 being holidays.

Lighting Fixture and False Ceiling

AMF Panel Positioning and Incomer cable Ladder Tray

Fire Rated Doors.

Furniture

PAC and PDU Positioning

THANK YOU