1 Addendum Preparation Process ESC-OE Caltrans. 2 Introduction An addendum is a change in contract requirements for an advertised project for which bids.

Slides:



Advertisements
Similar presentations
Project Estimates There are two types of estimates 1Partial Payment Estimate 2Final Payment Estimate.
Advertisements

FAA Project - Bidding Phase FAA Recommends.. Consider how you would like to bid the project early on in the design. Due to possible budget constraints.
Change Order Missouri Local Programs How to Complete a Change Order & Get it Approved.
Sales Project Reports (Student Activity Reports) Activity Purpose Statement and Budget Sales Project Report for Distribution Purchase Request Form CPS.
Field Orders on Construction Contracts Guidance Document CLC-8 May 13, 2013.
BY: HUMAN RESOURCES POSITION MANAGMENT & EMPLOYMENT TEAM HIRING PROCESS.
End Of Year Elluminate Session. All Standard PO’s must be RECEIVED ONLINE AND SENT TO A/P. A shipping line needs to be included on the original requisition.
February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.
With the Genesee County Road Commission By Fred Peivandi, P.E. And Ken Johnson, P.E. Local Road Funding.
Plans, Specifications and Estimate (PS&E) Kelli Sparkman Local Agency Liaison, Region 3 January 30, 2009.
GSA eBuy Seller’s Tutorial
Gateway Program Go to along the left side, in the third section, click on The Gateway.
Procurement.
+ Yearbook Class Introduction Rules and Syllabus Give each student their binder which includes: Syllabus Turn in signature sheet Rubric Guide.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
For West Virginia Department of Education DISCLAIMER This PowerPoint presentation serves only as a snapshot of purchasing regulations. Please visit the.
Work Plan Development Steve Robinson Highway Utility Engineer, INDOT June 11, 2015.
Exit Project Proposal How Do I Get Started?. Getting Started-Step 1 0 Talk with parents, friends, or teachers and brainstorm ideas 0 Brainstorming worksheet.
NANCY ABBOTT CANR GRANTS DEVELOPMENT OFFICER [GDO] CANR Sponsored Project Proposal Process.
2010 Construction Contract Standards Training Part 2 TOOLS November 2011.
COMPLIANCE WITH GRANT IMPLEMENTATION PROCEDURES TxDot Grant Fund Project.
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT August 21, 2014.
Chart Your Course to Business Success On Target Business Intensive: Session 7 May 8, 2012 Advisors On Target 1.
Work Plan Development Aschalew Aberra Highway Utility Engineer, INDOT November 20, 2013.
On Target Contractor’s Blueprint Chart Your Course to Business Success On Target Business Intensive: Session 8 November 14, 2013 Advisors On Target 1.
Procurement Card Presented By: Denise Matias, CAH February 1, 2012.
Tyrone Ware FDOT Specifications & Estimates Office Estimating Systems Support Section.
WASHINGTON STATE UNIVERSITY EXTENSION WE’VE GOT THE MONEY NOW WHAT? Photo here.
YEAR END CLOSING PRESENTED BY ACCOUNTING AND FINANCIAL REPORTING THE Accounts Payable Group.
1. Proposal deadline 2. Timeline  A grant opportunity announcement will include a sponsor deadline for receipt of the proposal.  The instructions will.
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT November 19, 2013.
GRANT MANAGEMENT SEMINARS MEMORANDUM OF UNDERSTANDING.
HUMAN SUBJECTS PROTECTION PROGRAM Office Location: 1350 N. Vine Ave. (one block west of Cherry Ave. & three blocks north of Speedway) PO Box Phone:
IDM Chapter 104 Utility Coordination Gail Lee Utility and Railroad Engineer, INDOT June 10, 2015.
Highway Utility Engineer, INDOT
WELCOME BACK PRESENTED BY ACCOUNTING AND FINANCIAL REPORTING THE Accounts Payable Group.
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specification-Show how project.
Reimbursement Process Michigan State Police Emergency Management and Homeland Security Division June Martin, Analyst Carla Richardson, Analyst.
San Marino Unified School District Contracts Presentation Presented by: Wesley Lee, Budget Analyst October 28, 2015.
Vendor Bid System (VBS) Seminar. Agenda Vendor Bid System Overview Step-by-Step Advertisement Posting Editing Active Advertisements Recommended Practices.
2010 Construction Contract Standards Training Part 2 TOOLS October 2012.
Grants and Contracts Jim Butterfield and Kathy Blackwood October 5, 2004.
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specifications-Show how project.
SECTION BYLAWS APROVAL PROCESS Five Easy Steps. Step 1: Collect Data Obtain Template from SWE Communities Professional Section Bylaws Community Collegiate.
Introduction to Procurement for Public Housing Authorities Sealed Bids Unit 5.
KYTC Change Order (Contract Modifications).
6/9/2016 Agenda Procedure Training Lori McWilliams, CMC Village Clerk.
Travel or Conference Training Sponsored by Classified Senate.
October 2, 2015 REQUEST FOR PROPOSAL (RFP) 7012 ADMINISTRATIVE SERVICES ORGANIZATION COUNTY OF SAN DIEGO, HEALTH AND HUMAN SERVICES AGENCY PRE-PROPOSAL.
Vera Konstantinova, Procurement Contracting Officer September 8, 2015 REQUEST FOR PROPOSAL (RFP) 7045 INDEPENDENT LIVING ASSOCIATION PROJECT COUNTY OF.
Vera Konstantinova, Procurement Contracting Officer July 16, 2015 REQUEST FOR PROPOSAL (RFP) 6922 IN-HOME OUTREACH TEAMS AND ASSISTED OUTPATIENT TREATMENT.
Raquel Harris, Procurement Contracting Officer REQUEST FOR PROPOSAL (RFP) 7060 CHILD WELFARE SERVICES FOR KEEPING FOSTER AND KINSHIP PARENTS TRAINED AND.
December 11, 2015 REQUEST FOR PROPOSAL (RFP) 7114 DEVELOPMENTAL EVALUATION CLINIC SERVICES COUNTY OF SAN DIEGO, HEALTH AND HUMAN SERVICES AGENCY PRE-PROPOSAL.
A Look at the Pre-Award & Contract Services Office Carol Darstein Director, Pre-Award and Contract Services.
OPTIONAL PRACTICAL TRAINING 17-MONTH EXTENSION (OPTX)
Contract Compliance Training
Welcome to Manor i.s.d.! Employment documents.
Registrars of Voters Conference April 21, 2017
Chapter 8 Specifications & Special Provisions
A Look at the Pre-Award & Contract Services Office
Chapter 8 Specifications & Special Provisions
* Topic 12 Special Provisions
Contract Compliance Training
THE OFFICE OF PROCUREMENT CONTRACT TRAINING MAY 2018
General comments: These projects are locally owned and the LPA should be involved and informed throughout the project. The project agreement is between.
To the ETS – Encumbrance Online Training Course
To the ETS – Encumbrance Online Training Course
Requesting PDP Funds for Travel
A Look at the Pre-Award & Contract Services Office
GSA eBuy Seller’s Tutorial
Presentation transcript:

1 Addendum Preparation Process ESC-OE Caltrans

2 Introduction An addendum is a change in contract requirements for an advertised project for which bids have not been opened.

3 Topics of Discussion Initiation of Addenda ESC-OE Review and Approval of District Requested Addenda Processing Addenda Preparing Addenda Methods of Issuing Addenda Verification on Receipt of Addenda Records Keeping

4 Initiation of Addenda District Initiated Addenda –To be requested in writing. –Processed through the DOE/ROE. –Signed by the Dist. Div. Chief (Deputy). –See RTL Guide for requirements.

5 Initiation of Addenda ESC-OE Initiated Addenda –Fed Wage Rates. –New Regulatory Requirements. –Reproduction Errors. –Etc.

6 ESC-OE Review and Approval of District Requested Addenda Can the project be bid, built and properly administered without the proposed revisions? Or Could it be done more effectively by CCO? If not, propose issuing the addendum to the Senior who recommends approval and then process the addendum.

7 Processing Addenda Things to consider when issuing an addenda: Accumulate requests and issue as one addendum when possible, unless the addendum affects the bid. Check if there is an upcoming Fed Min Wage Rate Change addendum and do it as one addendum.

8 Processing Addenda (Continued) Consider changing the BO date when an addendum is being issued close to it. Coordinate it with the Scheduling Engineer and District to make sure the proposed BO is acceptable and appropriate. Postponement of the BO is mandatory if the addendum is being issued less than 72 hours prior to BO. Contact the Addenda Unit right away when it has been recommended to issue the addendum.

9 Processing Addenda (Continued) All the Bidders must be contacted by phone when postponing a BO less than 24 hours prior to the current BO. Contact the Addenda Unit for a copy of the Bidders List. In addition, Addenda Unit will provide a copy of the “Phone Addendum Notice” form for use in calling the Bidders. Also inform Contracts Engineering and Awards Units of the postponement. Now you're ready to prepare your addendum letter, attachments and plans.

10

11 PROCESSING ADDENDUM LETTER AND ATTACHMENTS STEPS: 1. Determine the addendum issue date with your Senior but not later than the Fed Min Wage addendum, if any. 2. Contact the Addenda Unit if the date determined is feasible (because of workload). 3. Contact Plans Coordination Unit (Carol Christian) to retrieve any affected plans from repro whether to be reproduced or not.

12 PROCESSING ADDENDUM LETTER AND ATTACHMENTS STEPS: 4. Notify Scheduling Engineer for any BO changes. Reserve the next available date. 5. Redline the affected plans and submit it to Drafting Services (DS). DS will provide a reduce copy and the original full scale plans. 6. Draft the addendum letter and prepare the attachments and plans. Forward the addendum letter, attachments (specs & BEES) and the plans (if is being attached) to the Addenda Unit.

13 PROCESSING ADDENDUM LETTER AND ATTACHMENTS STEPS: 7. Addenda Unit will finalize the addendum letter and return to the SE and Senior for their initials and obtaining the signature of the Chief of Office of PS&E. 8. SE to place the "addendum request" in the Job File, update the estimate in the Job File and return the final revised original plans (when it was not attached) to Plans Coordination Unit.

14 PROCESSING ADDENDUM LETTER AND ATTACHMENTS STEPS: 9. Addenda Unit will submit the final signed addendum letter and attachments to repro. 10. Addenda Unit will issue the addendum to all contract book holders. 11. Plans Counter request repro to reproduce more “NOTICE TO CONTRACTORS AND SPECIAL PROVISIONS” with the addendum letter at the front.

15 PROCESSING ADDENDUM LETTER AND ATTACHMENTS STEPS: 12. Addenda Unit will forward a copy of the addendum with attachments to the SE and Senior. 13. SE to place a copy of the addendum letter in the Job File.

16 HOW TO PREPARE THE ATTACHMENTS ADDENDUM LETTER: When preparing an addendum, use the appropriate form letter located in the folder titled "Addenda Letters" under the folder titled "LETTERS" in the HQ OE FileServer. There are 3 form letters for cancellation, postponement and standard (includes the format for revisions to the Plans, Specs and/or Estimate which are included in your package. Carol will come up NOW and discuss the “FORM LETTERS” available in the Server.

17 MASTER ADDENDUM FORM LETTER

18 EXAMPLE OF AN ADDENDUM LETTER

19

20 HOW TO PREPARE THE ATTACHMENTS PLAN REVISIONS: -Minor revisions may be handled by instructions in the addendum letter. -Half-sized plan sheet revisions and new sheets are issued as attachments with the addendum letter. _Changes must be identified on the plans by the inverted triangle with the addendum number inside.

21 HOW TO PREPARE THE ATTACHMENTS PLAN REVISIONS: -The statement “ REVISED (ADDED, OR REPLACED) PER ADDENDUM NO. # DATED SEPTEMBER 22, 1999” must be added on the bottom of the plan sheet. -The inverted triangle must be placed by the revisions if there are just few. It should be placed on the top right corner beside the project info box for a replaced or added sheets.

22 HOW TO PREPARE THE ATTACHMENTS PLAN REVISIONS: -After you are done with your redline, submit it to Drafting Services who in turn will provide you a reduced copy and a full size. Make sure you tell them that it is an addendum.

23 PLAN SHEET REVISIONS (AN ITEM OF WORK IS REVISED)

24 PLAN SHEET REVISIONS (DELETE A WORK ITEM)

25 PLAN SHEET REVISIONS (ANOTHER QUANTITY TABLE IS ADDED)

26 PLAN SHEET REPLACEMENT (TOO NUMEROUS TO IDENTIFY)

27 ADDED PLAN SHEET

28 HOW TO PREPARE THE ATTACHMENTS SPECIFICATION REVISIONS: -The following example on Slide # 18 should be followed how to state the revisions in a Section of the Standard Special Provisions. -Consider reissuing the Section if it has major or complex revisions i.e. a Section containing 25 paragraphs with tables and 10 of the paragraphs through out the section are being revised.

29

30 HOW TO PREPARE THE ATTACHMENTS ESTIMATE REVISIONS: -State in the addendum letter which items are being revised, added or deleted. -The affected sheets must be attached to the addendum letter. -If an item is being added and there is an item for Mobilization, the mobilization item must be deleted and added as the last item.

31 HOW TO PREPARE THE ATTACHMENTS ESTIMATE REVISIONS: -A “one time” Item Code must be obtained from Contracts Engineering when adding a new non- standard item. -Update the BEES in the Job File as soon as the addendum is finalized. Use blue pen or other color from red or green. Check the Voted Funds limit when there’s a major increase in the estimate. Update the DB to reflect the new cost estimate.

32

33 METHODS OF ISSUING ADDENDA, VERIFICATION ON RECEIPT OF ADDENDA, RECORDS KEEPING, AND MISCELLANEOUS ISSUES (BY CAROL FISHER)