SAMPLE IMPLEMENTATION PLAN OF A POVERTY ASSESSMENT TOOL To Report to the Management of Microfinance Association of Patharland (MAP), Patharland This proposal.

Slides:



Advertisements
Similar presentations
Multiple Indicator Cluster Surveys MICS3 Regional Training Workshop Survey Logistics.
Advertisements

Elements of Survey Methodology Documentation MICS3 Data Analysis and Report Writing Workshop.
MICS4 Survey Design Workshop Multiple Indicator Cluster Surveys Survey Design Workshop Survey Quality Control.
MICS4 Survey Design Workshop Multiple Indicator Cluster Surveys Survey Design Workshop General Structure of a Survey Plan.
The MICS3 Process. By now we have decided to do a MICS3 We have answered these questions: Why is the survey being done? How will the survey results be.
How to Apply for an Interlibrary Cooperation Grant from the Alaska State Library March 23, 2013 Alaska Library Association Conference Valdez.
1 Field Management: Roles & Responsibilities Partially Adapted from Multiple Indicator Cluster Surveys (MICS) Regional Training Workshop – Survey Techniques,
Planning and Preparation Inter-agency Child Protection Working Group & Save the Children Picture: Lindsay Stark Training material developed by: Hani Mansourian.
Collecting and analyzing social performance data: Experience of SANASA Development Bank Hosted by Amelia GREENBERG (SPTF) Guest speakers: Nilupama Madurawala.
1 Fieldwork Logistics. OBJECTIVES The importance of logistics in supporting high quality survey results and implementation schedule Key logistical.
1 Zambia Malaria Indicator Survey 2010 “What to do” of the MIS Supervisor.
Mt. San Antonio College CLASSIFICATION AND COMPENSATION STUDY February 2012.
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
1 Fieldwork logistics and data quality control procedures Kathleen Beegle Workshop 17, Session 2 Designing and Implementing Household Surveys March 31,
Approaches followed & lessons learned- Group Feedback -Chelanko Keble SLATE Training for Africa RISING / NBDC Addis Ababa / Jeldu April 2013.
1a Implementing USAID Poverty Assessment Tools Materials Developed by The IRIS Center at the University of Maryland.
Multiple Indicator Cluster Surveys Survey Design Workshop
Project Cost Management Estimation Budget Cost Control
TOPIC: PROJECT: NAME: TEACHER: CLASS:. Design brief for: To insert title, click the ‘view’ menu, press the ‘slide master’ button and edit slide master.
1a Job Descriptions for Personnel Involved in PAT Implementation Materials Developed by The IRIS Center, University of Maryland.
MICS Survey Design Workshop Multiple Indicator Cluster Surveys Survey Design Workshop Overview of MICS Tools, Templates, Resources, Technical Assistance.
MICRO AGRI PRODUCT Designing a Rural Finance Product:
SONATA: Progress out of Poverty Index (PPI) Pilot Summary of Analysis February 2009.
Sudan Experience on Poverty Survey Somaia K.E.Omer Date 7-8 Aug بسم الله الرحمن الرحيم.
IN CHILD SUPPORT PERFORMANCE MEASUREMENT AND MANAGEMENT.
L545 Systems Analysis & Design Week 4: September 23, 2008.
Reviewing the 2015 AmeriCorps Applications & Conducting the Review AmeriCorps External Review.
Do it pro bono. Strategic Scorecard Service Grant The Strategy Management Practice is presented by Wells Fargo. The design of the Strategic Scorecard Service.
1 PLANNING A description of what we want to accomplish in the future and agreement on the means for achieving it. Planning is an effort to arrange for.
MICS Data Processing Workshop Multiple Indicator Cluster Surveys Data Processing Workshop Overview of MICS Tools, Templates, Resources, Technical Assistance.
United Nations Regional Workshop on the 2010 World Programme on Population and Housing Censuses: Census Evaluation and Post Enumeration Surveys Bangkok,
PADI Action Agenda for China(draft) History of Poverty Reduction in China History of Monitoring & Evaluation in Poverty Reduction Objectives.
MABS APPROACH TO AGRICULTURAL MICROFINANCE Module 1, Session 2 Designing a Micro-Agri Product: Understanding Present Agricultural Lending.
Ahmad Al-Ghoul. Learning Objectives Explain what a project is,, list various attributes of projects. Describe project management, discuss Who uses Project.
M & E Working Group Meeting: New Technology Applications in M & E Wireless Data Entry & Wireless Data Transmission from Mobile Devices to Web Virginia.
AADAPT Workshop South Asia Goa, December 17-21, 2009 Maria Isabel Beltran 1.
Post enumeration survey in the 2009 Pilot Census of Population, Households and Dwellings in Serbia Olga Melovski Trpinac.
Using Client Satisfaction Surveys as a Quality Improvement Tool.
The wonderful job at KIMEP High average salary range KIMEP tuition discounts for employees Trainings & seminars for your self-development Annual performance.
Preparing national HES Manuals. What is the function of the national HES manual Documents the entire survey process Planning Field work Laboratory procedures.
DESIGNING EFFICIENT ORGANIZATIONS FOR MICROFINANCE OPERATIONS CANTILAN BANK’S EXPERIENCE.
Rural Bankers Association of the Philippines- Microenterprise Access to Banking Services (RBAP-MABS) Supervisors Training Course Supervision.
Development Impact Evaluation in Finance and Private Sector 1.
MF Policy Compliance Review Rural Bankers Association of the Philippines- Microenterprise Access to Banking Services (RBAP-MABS) Supervisors Training Course.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
Regional Investment Climate Assessment 21 January 2015 Ankara, Turkey.
March 2014 Possibilities, Perils & Pitfalls of doing a CP-KAP Mónica Ruiz-Casares, Ph.D.
1 Cross-Cutting Issues 5310-JARC-New Freedom U.S. Department of Transportation Federal Transit Administration SAFETEAU-LU Curriculum August 7, 2007.
IDPs and Returnees Profiling Joint IDP Profiling Service Presented by William Chemaly Geneva, August 10, 2010 Yemen, June 16-July 10.
MicroLoan Foundation: Creating balanced staff incentives Daniella Hawkins, Social Performance Manager.
Dimension 1: Define and Monitor Social Goals Today’s speakers: Margaret Namazzi, Opportunity Bank, Uganda (OBUL) Anton Simanowitz, Director, The Business.
INTRODUCTION TO INFORMATION SYSTEMS FOR IMMUNIZATION SERVICES IPV Global Workshop March 2014.
1 Health Results-Based Financing Impact Evaluation Surveys Quality Assurance and Data Management Álvaro Canales, Beatriz Godoy, Juan Muñoz Sistemas Integrales.
Getting Public Agencies Started on Fund Mapping evidence2success Strategic Financing.
CSBG ROMA NEXT GENERATION
Session 6: Data Flow, Data Management, and Data Quality.
Day 6: Supervisors’ Training This presentation has been supported by the U.S President’s Emergency Plan for AIDS Relief (PEPFAR) through the U.S. Agency.
Using the EGRA Calculator for Study Design and Budget Estimates Kellie Betts RTI International April 27, 2016.
Orienting Agency Leads for Fund Mapping evidence2success Strategic Financing.
SP Fund, 19th May 2016 SPI4, the Universal Standards and Internal Audit/Control.
Principal Investigator ESTCP Selection Meeting
Session VIII: Work Plan and Budget Plan
Principal Investigator ESTCP Selection Meeting
Post Enumeration Survey Census
Overview of the PAT Implementation Process Materials Developed by The IRIS Center at the University of Maryland.
LIVESTOCK PRODUCTION AND PRODUCTIVITY
Albania 2021 Population and Housing Census - Plans
Principal Investigator ESTCP Selection Meeting
Principal Investigator ESTCP Selection Meeting
International Standards and Contemporary Technologies,
Presentation transcript:

SAMPLE IMPLEMENTATION PLAN OF A POVERTY ASSESSMENT TOOL To Report to the Management of Microfinance Association of Patharland (MAP), Patharland This proposal is based on using the USAID PAT for Patharland Using the Household Survey Method

What is a Poverty Assessment ‘Tool’? Includes: –Sets of indicators and coefficients –Integration into program implementation: who implements the tool on whom and when –Data entry and analysis: MIS or other data collection system/template –Instructions for contextual or programmatic adaptation –Training materials for users

What the tools will NOT do Measure complex nature of poverty Measure multiple dimensions of poverty Measure relative poverty amongst clients Target clients for inclusion in the program (results will be only known in the aggregate) Measure impact or movement out of poverty for individual clients

INSTITUTIONAL INFORMATION Beginning of Operations : 1995 Coverage: 76 branches all over Patharland Programs: Solidary Groups, Individual Credit Portfolio: US$23,863,000 Number of clients: 214,459 ( 100% women) Credit average: US $190 Funding sources: European Investment Bank and local commercial banks Entity Associated Network: Microfinance International, National Federation of Micro Finance Association

AUDIENCES FOR POVERTY ASSESSMENT USAID Evaluation & Monitoring Staff Executive Staff of organization

Pre-implementation Planning: Brief the management team in-country Assign or hire staff Plan for equipment and supplies needed Plan timeline for tasks involved in entire implementation process

Pre-implementation Questionnaire Translation: Translate the questionnaire to Patharland dialect Back-translate the questionnaire to English Pretest the questionnaire with a small group of people near headquarters before training interviewers to ensure questions are clear and easily understood

Criteria Used for Quantitative Sampling Will use our main financial product : –Solidarity groups loan which constitutes 98% of our portfolio –Will focus only on women clients who constitute 100% of our clients –Will focus on one branch representative of clients with stratification among urban, peri- urban, and rural –Clients with less than 12 months in the program will be selected

Sampling (1) - We will interview at least 300 clients within Harud branch -We chose 40% more clients (120) in the sample than needed for actual interviewing. This results in a total of 420 clients being selected. -Total sample selected was as follows:  168 from urban areas (40%)  126 from peri urban areas (30%)  126 from rural areas (30%)

Survey Sample UrbanPeri- Urban RuralTotal Clients interviewed Substitute sample (approx 40%) Total Sampling (2)

Human Resources Involved Job TitleName of Person (s)Level of Effort per person (no. of days) Project Manager Field Supervisors Sampling and Survey Tracking Coordinator Data Processing Coordinator Interviewers Data Processors Logistics

Calculation of Number of Interviewers Tools# of Minutes # of interviews per person per day in rural areas Total of interviewers Total per day # of daysTotal # of interviews using this tool Household Survey 20 minutes

Interviewers Based on the job description, we will select experienced and qualified interviewers. We will hire one more interviewer than needed in case any drop out during training. After the project manager and the field supervisor sample the clients, the field supervisor will refine the of how the implementation team is going to reach and interview the 420 clients. The project manager and the field supervisor will train interviewers. Pre-test the tool for the second time giving the interviewers practice as a part of the training. Hold FGD after pre-test to see which problems the interviewers encountered.

Planning the Interviewing Logistics Assign the sampled clients to interviewers Organize what forms of transportation each team will need Make sure that all are clear on their duties and how to handle different scenarios with interviewees Ensure that there are different levels of Quality Control (at the field level; in the office as the forms are received; and in the data cleaning)

Implementation of Interviewing Each interviewer will go to her/his assigned geographic area, supervised by the field supervisor who will perform the first phase of quality control after surveys are completed. If there is missing data, the interviewer must return to the respondent to obtain the information. Interview the assigned clients. If cannot find the assigned clients or the substitutes on the list provided by the field officer, use a random sample method to substitute the respondents by selecting a person from the locality. Forms are returned to the branch office each day where they go through the second phase of quality control by the survey and sampling coordinator.

Preparing for Data Input We will use EPI Info We will hire and train 2 data processors We will use the data from the pre-testing of the tool as part of training the data processors

Implementation of Data Input Sampling and survey tracking coordinator marks the respondents who have been successfully interviewed on master list Completed forms passed on to data processing Third phase of quality control by data processing coordinator to prepare surveys for entry Generating trial reports to test the data processing process Data analysis

Budget and Financing Resources The required funding will be estimated based upon the time frame for the project. This includes the pre-implementation phase, the training and data collection itself, data analysis and dissemination of results. See the Excel spreadsheet for the budget examples. Make projections and enter on following page.

Costs Program Staff Total: US$8,500 Administrative and Management Staff Total: US$1,000 Equipment and Supplies Total: US$700 TOTAL COST: US$10,200

Time Schedule (1) April 1-15: Sampling design; give general team orientation; compose master list of clients; translate questionnaire; transportation and logistics plan (locations, schedules, vehicles); set up data entry operations; brief management. April 15-28: Hire interviewers, data processors, finalize sampling.

Time Schedule (2) May 5-16, 2007 – Interviewer training; pre-test; organize transportation, additional logistics for field work May 19–June 17, Field interviews; data processing. June 18-20, 2007– Data comparing and cleaning, poverty calculation June 23, Report to USAID, PowerPoint presentation to management

Report Results to USAID and to Microfinance Association of Patharland Management With the report, send: Poverty calculation Database of survey data Any important comments or concerns