Aluminum bellows for experiments

Slides:



Advertisements
Similar presentations
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Advertisements

NEW DESIGN FOR RF FINGERS C. Garion 5 June, 2012TE-VSC1 Acknowledgements to A. Lacroix and H. Rambeau for materials and help.
Prediction of Load-Displacement Curve for Weld-Bonded Stainless Steel Using Finite Element Method Essam Al-Bahkali Jonny Herwan Department of Mechanical.
CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
Dean R Walters Chamber and Bellows Jan. 5, Summary Chamber The plan is to construct a chamber made of 316LN stainless steel with.
Novel Ultra-High Straining Process for Bulk Materials— Development of the Accumulative Roll-Bonding (ARB) Process Authored by Y. Saito, H. Utsunomiya,
Theodore Todorov Pixel mechanics november 8th Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Gerhard Schneider1 14 October 2011 Status of the Composite Vacuum Chambers M. Gallilee, C. Garion, M. Malabaila,
SLAC workshop 7-10 July 2009 WP1: microwave-based accelerators Progress towards a new standard X-band high-power flange G. Riddone, (contribution.
NEW DEVELOPMENTS IN FABRICATED TEES – A QUALITY ASSURANCE DESIGN GUIDELINE A.C. Seibi and R. J. Lawrence, GPPA.
Vacuum, Surfaces & Coatings Group Technology Department Glassy Carbon Tests at HiRadMat 14 March 2014 C. Garion2 Outline: Introduction Context: Transparent.
Vacuum system in the main Linacs C. Garion CERN/TE/VSC CLIC09 workshop, October.
Selection Criteria Properties Availability Cost Manufacturability
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
FAILURE INVESTIGATION OF UNDERGROUND DISTANT HEATING PIPELINE
Dec. 4, 2001 CERN-1 Hans de Vries VELO Mechanics  RF/vacuum foil  Rectangular bellow  Wake field suppressors  Cabling Summary & Outlook VELO mechanical.
Selection Criteria Properties Availability Cost Manufacturability
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
Engineering Department ENEN Status of TCSP manufacturing Collimation Working Group (CWG) 24 June 2013 A. Dallocchio, A. Bertarelli, F. Carra, L. Gentini,
STATUS OF THE MEG CRYOSTAT Construction status Schedule ____________________________________________________________ 04/Agust/06 F. Raffaelli, L. Delfrate.
Work toward Stainless Steel SRF Helium Vessels at Fermilab Tom Peterson (presenter), Information from Jeff Brandt, Serena Barbanotti, Harry Carter, Sergei.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
CERN status - Nb cavity – Manufacturing 1 15/Nevember/2010, Ofelia Capatina EN/MME 1 SPL Cavity Working Group Meeting TaskExternal Company CERN Provide.
Brookhaven - fermilab - berkeley US LHC ACCELERATOR PROJECT LHC IRQ Inner Triplet Review Q1, Q2, and Q3 Mechanics T. Nicol April 24-25, 2007.
1.3GHz Input Coupler for ILC
Preliminary View on the LHeC Experimental Vacuum Chambers Jonathan Bosch - University of Manchester And Ray Veness - TE/VSC J.Bosch and R.Veness LHeC -
N. Dixon PH / DT CERN 12 July Straw Material, weld line latest news and plans.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
Manufacturing process, validation and factory test
C. Garion Presentation Outline  Overview of the inner triplet interconnections  Q1/Q2, Q2/Q3 interconnections  General view  Working conditions  Compensation.
OLAV3 Engineering Integration and installation of experimental beam pipes: the case of LHC 7/8/20111P.Lepeule for VSC group.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Vacuum, Surfaces & Coatings Group Technology Department 22 nd January 2015 C. Garion2 Beam Line Interconnection: snapshot of present design principles.
Status of the activities on the vacuum system C. Garion TBMWG, 27/03/2013 Outline: ON/OFF mechanism: tribology study Pumping technology: MB quad VC Accelerating.
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
IN2P3. Why Titanium for cooling circuits? Titanium material collect the most important criteria for cooling circuit design: Low CTE: important parameter.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
LEB 14 X 11 C. Garion Aluminum bellows for LHC experiments C. Garion, TE/VSC.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Metal forming processes
Cryostats for superconducting magnets
PROTECTION SHELLS TE-VSC.
Quality assurance for Manufacturing Dressed Cavities for SPS prototype cryomodule C. Parente (HL-LHC Technical Quality Officer) Date:
Roadmap for triplet cryostats
Ti/SS transitions A.Basti INFN-PISA*
Crab – RFD prototype: Production Status Update
Material alternatives to limit activation of ZS
Summary of activities for LHC-b vacuum chamber supports
Cryostat procurement, status and plan, QA/QC
Status of design and production of LEP connection cryostat
Manufacturing of the first FCC-hh beam screen prototype for ANKA
Cryo-assembly design D. Ramos, V. Parma, C. Mucher, H. Prin, M. Souchet, J. Hrivnak, M. Moretti, L. Mora, F. Savary, L. Gentini Review of the 11T Dipoles.
Cutting and welding First internal LHC Dipole Diode Insulation Consolidation Review 10 Oct 2017 G. Favre / A. Amorim Carvalho G. Favre EN-MME.
Cedric Garion, TE-VSC-DLM, WP12
Consolidation and Upgrade of the LHC Experimental Vacuum Systems
Upgrade Strategy for the Experimental Vacuum Systems
Parts exchange for HL-LHC AUP Q1&Q3
Superconducting RF Crab Cavities
Beam Wire Scanners (PS prototype and LIU series)
Système à vide du CLIC: activités en cours
Status of the PANDA Solenoid Magnet Production in BINP
Chapter 5 Power Estimation in Extrusion and Wire-rod Drawing
Ch. Boccard, M. Krupa, G. Schneider, R. Veness, M. Wendt
ME Session #5 Selection of term projects
Selection Criteria Properties Availability Cost
Presentation transcript:

Aluminum bellows for experiments C. Garion & R. Veness, TE/VSC C. Garion

Outline Development history 2 ways of procurement Development at CERN Japanese company CERN Development at CERN Material Bellows parameters Bellows manufacturing Present situation and further actions Conlusions C. Garion

Development History Formed Bellows Machined Bellows European industry R&D project (1999-2001) Thick-walled aluminium bellows are made for cryogenic applications, but no standard production of thin-walled bellows in Europe 2 development projects were followed with European manufacturers, but neither successful results nor much interest Machined Bellows CERN Workshops (2001-2006) Good results obtained for 0.3 mm thick bellows Pieces installed in LHCb (small stroke) Leaks during production and test linked to material form and quality R.Veness LEB 30 VII 09 C. Garion

Japanese Industry Background Both Titanium and Aluminium bellows have been used in accelerator vacuum systems in Japan (TRISTAN and J-PARC) They were produced by Japanese industry in large numbers following joint development projects with the labs With help from KEK, a potential supplier was identified, and CERN issued a specification R.Veness C. Garion

Development Contract Prototype series Full series Order placed in June ‘09 for a series of 3 bellows, as per the drawing opposite Delivery expected end Oct ’09 Full series An offer has been made for a series of 30 bellows Unit Price ~ 1800 CHF/piece 3 months delivery R.Veness C. Garion

CERN development for formed bellows Material Requirements: Formability (high ductility) Weldability (also with 2219) Low Heat affected zone Available in thin foils Good mechanical properties 2 materials: series 5000 (Magnesium): Well weldable Good corrosion resistance Mechanical properties acceptable Non heat treatable  5754 H22: 0.3mm thick 5083 H111, 0.2 and 0.3mm thick (available beginning of September) 0.2 and 0.3 mm thick C. Garion

Design Algorithm of optimization of bellows expansion joints (Based on EJMA) Minimise the objective function: inequality constraints: bellows convoluted length inner diameter outer diameter bellows maxi compression membrane stress membrane & bending stress fatigue life column buckling in-plane squirm Atlas constraints (technical specification EDMS 429891): Lbmax = 100 mm Dmin ~ 60 mm Dmax = 80 mm Stroke = -24/+8mm Nf > 500 cycles C. Garion

Design Bellows parameters Thickness 0.2 mm Thickness 0.3 mm Design has to be compatible with formability capacity Other wish: if possible use the same tooling: 0.3mm thick: 13 convolutions, bellows length: ~96mm, Inner diameter: 60 mm, outer diameter: 78.8mm 0.2mm thick: 8 convolutions, bellows length: ~59mm, Inner diameter: 60 mm, outer diameter: 78.8mm C. Garion

Bellows manufacturing (courtesy of L. Prever Loiri, EN/MME) Aluminum foil Rolled tube & longitudinal weld (EB) Welds of the end fittings (EB) Cut of the end fittings Forming @150°C combining pressure and displacement loading C. Garion

Present situation 2 materials have been chosen: 5754 has been received, metallurgical and mechanical tests have been done (EN/MME) 5083 has been ordered. Delivery is expected beginning of September Metallurgical observations (grain size, inclusions) Tensile test at room temperature Bellows parameters have been defined and optimized Welding procedure has been determined C. Garion Micrograph of longitudinal weld

Present situation Tooling (forming and welding) have been designed and manufactured (EN/MME) Tubes are equipped with the end fittings  First tube equipped with the end fittings is ready for forming Analysis is being done to optimize the forming process (pressure-displacement function) C. Garion

Forming simulation Mesh Mesh Deformed shapes Pressure Displacement Plastic strain after forming Further detailed FE analysis will be done (A. Sarrio Martinez) C. Garion

Next steps Forming tests on 5754 tube: As assembled After heat treatment (annealing)? Qualification tests: Leak tightness Fatigue life a room temperature Stability? Reception of 5083 and metallurgical tests Welding tests Forming Qualification: Leak tightness Fatigue life a room temperature Stability? C. Garion

Tentative schedule (Alba Sarrio) End of prototyping: 12/09 First bellows by August 2009 Series C. Garion

Conclusions An order has been placed to a Japanese company for aluminum bellows prototypes Development of aluminum bellows at CERN is well advanced: 2 Material chosen: 1 delivered and 1 available beginning of September Forming process at “high” temperature will be used Bellows parameters are defined Welding process are defined Tooling for forming are ready Forming process will probably not be straight forward. Iterations might be necessary. C. Garion