High Energy Dump LSS5 STI Cost Estimate A.PERILLO MARCONE & F.PASDELOUP 2015/04/16 With contribution of R.FOLCH & D.GRENIER.

Slides:



Advertisements
Similar presentations
General Infrastructures Services Department LIU-SPS external beam dump - Internal Review Civil Engineering Aspect for Option B (LSS4) 30/7/2014 Martin.
Advertisements

Recap of heat loads and peak doses from HL-LHC Q1 to Q7 L.S. Esposito, F. Cerutti HL-LHC WP3 meeting, 22 May 2014.
Preliminary studies for T2 primary target for the NA61 fragmentation beam run 11 th October 2010 – NA61 Collaboration Meeting M. Calviani on behalf of.
1 Preparation for MQXF Short Model Tests G. Chlachidze Fermilab.
1 Secondary Emission Beam Profile Monitor H. Haseroth, CERN.
Superconducting Large Bore Sextupole for ILC
1 M. Modena for the CLIC MDI magnet study Team (A. Aloev, P. Thonet, E. Solodko, A. Vorozhtsov) CLIC MDI Meeting,16 January 2015.
1 DS Collimators at IR3: mechanical engineering and design LHC Collimation Upgrade Review Alessandro Bertarelli, Alessandro Dallocchio, Delio.
Upgrades and Activities of 13kA EE systems during LS1 Bozhidar Panev TE-MPE-EE
M. Modena, A. Aloev CERN, Geneva, CH “An alternative Super-ferric design for ILC QD0” “LCWS14, 6-10 October 2014 Belgrade.
TCDI operation until LS2 LIU-SPS-to-LHC Transfer Line Protection Devices (TCDI) Review 1 Oliver Aberle 26/03/2014 O. Aberle (EN-STI-TCD)
Status of MDI+BDS Cost Estimate Lau Gatignon. Summary ItemkCHFComments 4 QD0 magnets1340But replaceable item! IP feedback system610Preliminary Pre-alignment.
ENEN H- INJECTION: STATUS ON MECHANICAL DESIGN - VACUUM SECTORIZATION - BHZ162 CHAMBER MODIFICATIONS - DUMP AREA - BHZ11 CHAMBER MODIFICATIONS.
REQUIREMENTS FOR FCC DILUTION KICKERS AND BEAM DUMP LINE GEOMETRY F. Burkart, W. Bartmann, M. Fraser, B. Goddard, T. Kramer FCC dump meeting 18 th June.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
Design of DC septum magnets based on measurements and 3D calculation of an R&D septum magnet for Rapid Cycle Synchrotron of J-PARC Masao Watanabe, Accelerator.
Activation around dump shielding, and design of beam line mask Mathieu Baudin, RP Genevieve Steele, EN-STI Helmut Vincke, RP.
LIU external beam dump review External beam dump option A: branching off from LSS6 J.L. Abelleira Thanks to: F. Velotti, B. Goddard, M. Meddahi, H. Vincke,
Presentation at BBC, Linac 4 Commissioning Dump at 50 and 100MeV 1 Øyvind Dahle Lauten, EN-STI.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
LIU budget cuts – SPS savings? First brainstorming discussions!!! BG 30/4/14.
SPS Beam Dump in LSS5 Etienne Carlier on behalf of LIU-SPS LSS5 Dump Working Group. IEFC –
POTENTIAL EN-MME DESIGN JOBS IDENTIFIED BUT CURRENTLY NO REQUEST FROM EQUIPMENT OWNERS TO EN-MME EDMS B.RIFFAUD On behalf of EN-MME design team.
TIDVG2014 PRODUCTION AND INSTALLATION STATUS 23/07/2014 – “TIDVG Follow-up Meeting” Ivo Leitão.
Shielding the 140 mm option F. Cerutti, L.S. Esposito on behalf of CERN FLUKA team.
Status of n_TOF Facility
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.
Simulation of the new PS EC detector: implementation and results A. Romano, G. Iadarola, G. Rumolo LIU-PS Student Day 20 April 2015.
TPSG4 validation at HighRadMat #6 Cedric Baud, B. Balhan, Jan Borburgh, Brennan Goddard, Wim Weterings.
Francesco Cerutti ENERGY DEPOSITION ASPECTS FOR LHCb REQUEST 5th Joint HiLumi LHC - LARP Annual Meeting Oct 29, 2015 through L.S. Esposito’s work and essential.
Status of the LSS5 beam dump and proposed relocation of LSS5 systems Etienne Carlier on behalf of LIU-SPS LSS5 Dump Working Group LIU-SPS Coordination.
LSS1 post LS2 F.M. Velotti, B. Goddard. Q-Dogleg in LSS1 The quadrupole misalignment in LSS1 was needed to dump horizontally wide beams (e.g. FT beam.
SPS BEAM DUMP UPGRADE FUTURE CABLING CAMPAIGNS Georgi Minchev Georgiev EN-EL-FC.
Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE)
TCDI Project Budget Update François-Xavier Nuiry May 10 th 2015 EN-STI-TCD.
RECENTLY OBSERVED PROBLEMS WITH PRESENT TIDVG 30/07/2014 – “LIU-SPS External Beam Dump” Ivo Leitão.
High Energy Dump of the Super Proton Synchrotron at CERN – Present and Future designs A. Perillo-Marcone (EN-STI) Contributions from several colleagues.
Movable beam pipe and NNC Study & prototype development Manchester 14/12/20091D. FP meeting.
September 27, 2007 ILC Main Linac - KOF 1 ILC Main Linac Superconducting Quadrupole V. Kashikhin for Magnet group.
SPS High Energy LSS5 Thermal contact & cooling aspects
Remote Measurement and Alignment Applications for Survey and Alignment P. Bestmann for BE/ABP/SU
C. Bracco, R. Bruce, B. Goddard, C. Wiesner, A. Lechner, M. Frankl
TE-EPC internal review of the ELENA project
Motion control implementation and validation for high precision, highly reliable moveable devices Jorge Sola Merino (EN-STI-ECE) Supervisor: Mark Butcher.
Impact of TIDVG problem on LSS5 dump design schedule
AD consolidation activities in LS2
Design of TIDVG#4 A. Perillo-Marcone (EN-STI).
Comparison between 1) HL-LHC BASELINE: Q5 at point 6 at 1
PREX II Vacuum Box, Shielding and Septum Design Status
FCC Tunnel and Shaft Cross Sections
Arc magnet designs Attilio Milanese 13 Oct. 2016
Beam instrumentation for the upcoming TIDVG#5
Accelerator and Experiment Interface Session: LS2, LS3
EN-STI activities in LHC during EYETS
M. Calviani, A. Ferrari (EN/STI), P. Sala (INFN)
AMMS-WG BE-BI and PPE 9/12/2018.
Compact and Low Consumption Magnet Design The DESY Experience
Energy deposition studies in IR7 for HL-LHC
دانشگاه شهیدرجایی تهران
تعهدات مشتری در کنوانسیون بیع بین المللی
HiRadMat Test Facility
LIU-SPS review for BI (no BWS)
East Hall under construction
HL-LHC - WP15 modifications Coffrets Prise C4L8
Michele Martino – Jean-Paul Burnet
WP15 budget changes linked with Matching Section
Presentation transcript:

High Energy Dump LSS5 STI Cost Estimate A.PERILLO MARCONE & F.PASDELOUP 2015/04/16 With contribution of R.FOLCH & D.GRENIER

Outline EN/STI work packages WP1: QD Coil mask WP2: DUMP Core WP3: Displacement of UA9 elements WP4: Displacement of LHC test collimators 2015/04/23High Energy Dump LSS5 - Cost Estimate2

WP1: QD519 Coil mask WP1.1: Design WP1.2: Manufacturing + Tests WP1.3: Installation + Commissioning WP2: Dump core, spare and connections WP2.1: Design + Tests WP2.2: Manufacturing + Tests WP2.3: Installation + Commissioning WP3: Displacement of UA9 elements WP3.1: Disassembly WP3.2: Installation (Mounting + Cabling) + Commissioning WP4: Displacement of LHC test collimators WP3.1: Disassembly WP3.2: Installation (Mounting + Cabling) + Commissioning EN/STI work packages 2015/04/23High Energy Dump LSS5 - Cost Estimate3

Parts include in this work package The whole mask Request We need to have a predesign to evaluate the cost. Questions What is the power deposited on the mask? What precision is needed for the aperture? What are the specifications? Cost estimate If we consider a passive coil mask (without cooling system) and its spare, 150kCHF is reasonable price WP1: QD Coil mask 2015/04/23High Energy Dump LSS5 - Cost Estimate4

Parts include in this work package All parts include in the diameter of the first iron shielding The pipes for connections The actuators for the alignment Note: the external shielding is exclude of EN/STI work packages Request We need to have a predesign to evaluate the cost. WP2: DUMP Core 2015/04/23High Energy Dump LSS5 - Cost Estimate5 Core + First shielding Ø850: EN/STI WP Pipes for connections: EN/STI WP External shielding: NOT EN/STI WP First Shielding Absorbing block Copper core

Question What is the precision needed for the aperture? Cost estimate A current cost estimate of the current TIDVG is on going to give a rough estimate. For 1 dump: To Be Confirmed Yoke: On-going (~ 200kCHF) Core + absorbing blocks: 700kCHF Actuators: 100kCHF TOTAL: ~1MCHF for 1 dump 4.3m long Note: this dump is only 4.3m long, the new dump will be around 6m long. WP2: DUMP core 2015/04/23High Energy Dump LSS5 - Cost Estimate6

Parts include in this work package TECS TECS BSHV.51792,3,4,5 BRCV BRCH XRPH TACW XRP Question What is the distance of moving? S.MONTESANO will give us data soon. Cost estimate The biggest part of the cost should be the cabling of each device. Estimate on-going with S.MONTESANO and J.LENDARO. WP3: Displacement of UA9 elements 2015/04/23High Energy Dump LSS5 - Cost Estimate7

Parts include in this work package LHC test collimators Question Will these devices used after LS2? Cost estimate On going with S.DE MAN WP4: Displacement of LHC test collimators 2015/04/23High Energy Dump LSS5 - Cost Estimate8

THANK YOU FOR YOUR ATTENTION 2015/04/23High Energy Dump LSS5 - Cost Estimate9