Session Objectives To introduce the Micro-Hydro Project Scope & Plan

Slides:



Advertisements
Similar presentations
Project Cycle Management
Advertisements

Step 4: Strategy Implementation. Learning Objectives Understand the elements and benefits of developing an action plan Value the involvement of internal.
Museum Presentation Intermuseum Conservation Association.
Training activities administration and logistical support
1 Project Design Module 5 Session 5. 2 Summary This session provides introduction to project preparation, project documents, and checklist for questions.
TITAN Group …….Managing Site Build up for the telecom sector TICS Telecom Projects Consultancy Pvt. Ltd.
Delivering a real CDM Project The BP PRODEEM Rural Solar Project.
Generation Business Line
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
Norwegian Water Resources and Energy Directorate
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
The Nottingham Declaration Action Pack Local Renewables 2007 Freiburg Thursday 14 June: Session B1 Steve Waller Sustainability Advisor.
12-May-151 Khan Younis Waste Water Treatment Plant Management Arrangements Khan Younis Waste Water Treatment Plant Management Arrangements.
Mini-Grid Based on Renewable Energy (Biomass) Sources to Augment Rural Electrification Implemented by UNIDO.
Introduction to MIRC 2014 Research: Energy & Resource Assessment Study for Mint Farming Research being conducted by etc3 Ltd.
Cleaner Production Assessment (Chapter 4)
Racco industrial consulting working according to investment law to prepare Engineering, Economic, Technology, Environmental Studies for industrial projects.
Micro-hydro Power Alvin Chan, Benjamin Garber, Lance Stratton, Philip Pulitzer Advisor: G Flo.
ENVIRONMENTAL MANAGEMENT PLAN
BUSINESS BRIGADES INFORMATION SESSION MONTH DAY, YEAR.
Business Consulting Services Agenda Discussion: Management Reports Discussion: Project Reports Discussion: Engagement Proposal Upcoming Events Review Project.
TRP Chapter Chapter 4.2 Waste minimisation.
Energy Audit- a small introduction A presentation by Pune Power Development Pvt. Ltd.
They also develop power- using machines such as refrigeration and air- conditioning equipment, machine tools, material handling systems, elevators and.
Chapter 5 Initiating and Planning Systems Development Projects
Committee Planning and Budgeting Tool: Outlining the Roles and Responsibilities of Selected Committee Support Personnel A Presentation to Committee 8 July2014.
Emergency Action Plans Miriam Gradie Anderson Planning Specialist 608/ Wisconsin Department of Natural Resources.
© 2006 ITT Educational Services Inc. SE350 System Analysis for Software Engineers: Unit 6 Slide 1 Chapter 5 Initiating and Planning Systems Development.
Project Location: El Chaguite, Yoro District, Honduras Northeastern University’s Student Chapter 1Project: El Chaguite Water System.
Community Preparedness & Disaster Planning. Why Disasters occur ?
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
PRODUCT TRANSFER.
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
1 RENEWABLE ENERGY MARKET TRANSFORMATION PROJECT.
Chapter 5 : Initiating and Planning Systems Development Projects.
© 2005 by Prentice Hall Chapter 5 Initiating and Planning Systems Development Projects Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer.
FOR SIXTY YEARS WE HAVE BEEN TAKING THE POWER FROM WATER AND HANDING IT OVER TO NATIONS LINKING THE DOTS Bucharest, February 20, 2014.
Technology Transfer Execution Framework. 2 © 2007 Electric Power Research Institute, Inc. All rights reserved. Relationship Between Your EPRI Value and.
Cairo, 20 December 2004 National Strategy for the Development of Statistics (NSDS) Roadmap.
Phare 2003 Sector: Economic and Social Cohesion Title: Water Supply and sewerage in tourism and resort settlements.
SAINT LUCIA PROPOSED PROJECT IDEAS GEF Regional Meeting Presented by: Mr. George James and Ms. Caroline Eugene.
Training Resource Manual on Integrated Assessment Session UNEP-UNCTAD CBTF Process of an Integrated Assessment Session 2.
THE PROJECT CYCLE By Dr. Peter Quartey (ISSER, Univ. of Ghana)
BLACKSPRING RIDGE PROJECT UPDATE Liaison Committee Presentation February 23, 2015.
1 Improvement of Industrial Energy Efficiency in Nigeria Presented by UNIDO.
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
Alternative Energy Evaluation May06-16 Team Members: Steve ChebuharEE Anhtuan DinhEE Ryan FerneauCprE Justin JorgensenEE Client : Professor Ralph Patterson.
Chapter 8 Final Construction Final construction in the SDLC Construct and test programs Construct and test the database Obtain additional hardware Prepare.
Role of Consultants in Developing Sustainable Projects Pooja Kapoor Head (Business Development)
Global Partnership for Enhanced Social Accountability (GPESA) December 19, 2011 World Bank.
In today’s world of ever-increasing energy prices and environmental concerns, alternative energy sources are constantly being researched. This project.
Implementing Program Management Standards at Duke Energy.
Sally Lyon and Staff August 26, OPERATING REVENUES AND OTHER INCOME BUDGET FY 2016.
1 Workshop “Energy Efficiency management in chemical Industry sector" Thessaloniki, Greece Use of CARE +Tools in Bulgaria energy management.
BioEnergy Sustaining The Future 2 BESTF2 Briefing Event 11 th December 2013 Dr Megan Cooper, BESTF co-ordinator.
Principal Investigator ESTCP Selection Meeting
CMGT 410 aid Education Begins/cmgt410aid.com
The Feasibility Study: something we already know
Systems Analysis and Design in a Changing World, 4th Edition
A Co-op in Your Community?
Systems Implementation,
Principal Investigator ESTCP Selection Meeting
Business System Development
Description of Revision
SUSTAINABLE ENERGY INDUSTRY DEVELOPMENT PROJECT (SEIDP)
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Principal Investigator ESTCP Selection Meeting
Feasibility Report.
Principal Investigator ESTCP Selection Meeting
{Project Name} Organizational Chart, Roles and Responsibilities
Presentation transcript:

Bario Asal & Arur Layun Micro-Hydro Project – INITIAL BRIEFING PACK

Session Objectives To introduce the Micro-Hydro Project Scope & Plan To describe the benefits of implementing the hydro To present the project outline Cost Estimates Project Funding To describe how the community will be involved in the project Project Team – Roles & Responsibilities

Outline Why are we doing this? What is a Micro-Hydro Power Plant? What are the benefits to Bario Asal & Arur Layun community? Where are we now and what next? Who will be involved in the Project?

Why are we doing this? Provide the residents of Bario Asal & Arur Layun with electricity; Elevate the standard & quality of life of the local community; Encourage sustainable development.

What are the benefits to the community? A constant supply of electricity Savings on the cost of buying diesel for diesel powered generators Low environmental impact Low noise and air pollution Coupled with reforestation in the water catchments area, the project also aims to reduce the risk of flash floods in years to come.

What is a Micro-Hydro Power Plant? A small scale power plant that generates electricity using the energy potential of water. Micro-hydro power plants convert the energy of flowing water into electrical energy. The energy produced by them is renewable & the process does not emit polluting gases.

Outline Why are we doing this? What is a Micro-Hydro Power Plant? What are the benefits to Bario Asal & Arur Layun community? Where are we now and what next? Who will be involved in the Project?

Where are we now? A bank account at Maybank Boulevard, Miri has been set up in the name of JKK Kampung Bario Asal with over RM10k in the account A preliminary site survey has been carried out and a project paper has been drafted; Contacted various interested parties who have prior experience in executing similar projects in Borneo: The Borneo Project Team – Focal Point : Jessica Lawrence PACOS – Focal Point : Adrian Lasimbang Seacology.Org – Via Jessica Lawrence PACOS & Seacology.Org previous projects website

Micro hydro Gantt Chart Q2 2006 Q3 2006 Q4 2006 Q1 2007 Q2 2007 Q3 2007 Q4 2007 Preliminary feasibility study Conceptual Design /Design Full feasibility study and Project Plan Excavation and civil works Build and test Electromechanical component installation Wiring and testing Implement Maintenance Training Mapping, Reforestation and Training Fundraising

Cost Estimates – Total RM200,000 No. ITEM RM 1. Excavation (Estimation basis: Fuel Costs of 5 days work) Note: Propose that the usage of tractors & driver be provided in kind. 1,000 2. Material – Electromechanical (turbine & cabling) 70,000 3. Material – Civil Structures (pipes, gate valves, flanges, cement, rebar/brs) 20,000 4. Equipment rental – Surveyor’s equipment from PT Heksa Indonesia Note: Genset & welder (in-kind. Value:RM2k); Truck & Tractor (in-kind. Value:RM5k) 2,000 5. Transportation – technical team from PACOS & HEKSA 6. Transportation – materials (Estimation basis: flight charter) Note: Propose that the followings are provided in kind: (a) transportation from airport to site; (b) transportation fuel 7. Mapping of upstream area 5,000 8. Reforestration activites of upstream area 15,000 9. Training 8,000 10. Administration, accounting & reporting (stationeries, printing etc.) 11. Technical Consultancies – In kind Propose that food & lodging to Technical team be provided in kind 12. Unplanned costs 53,000

Who will be involved in the project? Everyone will be involved, at varying levels in the various phases. Project Team Will involve Local Project Team & PACOS Technical Advisors to effectively plan and execute the work JKK Kampung Bario Asal Committee Overall coordination of Bario Asal community efforts JKK Kampung Arur Layun Committee Overall coordination of Arur Layun community efforts The Community (refer next slide)

Community Involvement? Volunteer labor for excavation and construction works Transportation of equipment and people to and from microhydro site Food and lodging for technical team and volunteers Mapping, marking and reforestation of water catchments Maintenance personnel Conduct workshop to train end users on responsible resource management Fundraising activities, sourcing of materials

Local Project Team – Roles & Responsibilites Overall Project Coordinator – Plan & monitor project progress, liaise with NGOs & manage project team logistics; Fund Raising Committee – Organise fund raising activities, contact governments or NGOs or Companies or Individuals for donations & materials; Financial Controller – Manage project budget, focal point for donation, assist in raising funds; Bario Asal Focal Point – to source and organise local manpower & equipment, to assist in trainings, to assist in attaining food & lodgings for technical advisors & volunteers; Arur Layun Focal Point – to source and organise local manpower & equipment, to assist in trainings, to assist in attaining food & lodgings for technical advisors & volunteers. IT Focal Point – to upload and manage documents on the project website

How to find us Project updates will be posted at : http://briefcase.yahoo.com/bariohydro Emails pertaining to the project can be sent to : Bariohydro@yahoo.com

End of Slides Thank You

Bank Account Details Bank : Maybank Boulevard, Miri Type of account: Savings account Account Name: JKK Kampung Bario Asal Account No.: 5942085 Signatories: 1. Ribed Inan, 2. Sekan Berauk, 3. Aline Pasang Item Transaction Date +ve -ve Total Donation from Aline Pasang 5 June 2006 250.00 Donation from Datu Robert Lian 16 June 2006 9,997.00 10,247.00 Return to slide