Sydney Tar Ponds Agency President Frank Potter.

Slides:



Advertisements
Similar presentations
1 The Avenue Contaminated Land and Brownfield Remediation September 2009.
Advertisements

ABSTRACT Background. Sydney Harbour (SH), Nova Scotia has long been subject to effluent and atmospheric inputs of metals, polycyclic aromatic hydrocarbons.
Environmental Assessment in Nova Scotia
Northwest Region Cleanup Program Zidell Waterfront Property Cleanup 2012 Portland Scott Manzano | Oregon Department of Environmental Quality.
Brownfields Redevelopment in Ontario, Canada: Two Case Studies Steven Rose Malroz Engineering Inc. NATO/CCMS Pilot Study Meeting Athens, June 4-7, 2006.
Sydney Tar Ponds: Toxic Chemicals and Their Effects The Sydney tar ponds are the result of the operation of a steel plant and coke ovens in Sydney, Nova.
PROJECT OVERVIEW COOLING POND REMOVAL Sydney Tar Ponds & Coke Ovens Clean Up :
Identify source area and COCs Determine nature and extent of discharge Evaluate potential risks to public health and the environment Develop Investigation.
Climate Change Action Plan T o w n o f Y a r m o u t h F a ll Town of Yarmouth – September 27.
 Cold Spring is a town in New York State, situated on the Hudson River  To the south of Cold Spring is:  Foundry Cove – a small river inlet  Constitution.
King River Tasmania Copper Tailings Remediation. Background Macquarie Harbour is Largest Estuarine System in Tasmania 1893 – million tonnes of.
Geology Matters 2013 Presenter: Robert Federico, Principal November 14, 2013 Donkin Coal Mine Environmental Assessment Case Study.
Type ‘A’ Water Licence Application Department of Community and Government Services, Government of Nunavut Sewage Treatment and Water Supply Hamlet of Rankin.
Environmental Investigation by Con Edison Former E115th Street Gas Works November 13, 2007.
Sydney Tar Ponds, Canada Matt Greaves and Tom Baker.
Tang Report 2001 “Construct for Excellence”. Background Sub-standard foundation works in several public housing developments in 1999 The Secretary for.
Carbon Management Steering Board 7 th October 2011 ETHOS (waste to heat) & ComPod – Update CARBON MANAGEMENT BOARD – October 2011.
FY  An initiative by State of Missouri to attract and maintain industries  An initiative to keep Missouri’s current workforce competitive in the.
Permits. The Process Plans are developed by an Architect or Engineer and presented to the Municipality – State Environmental Quality Review (SEQR) declaration.
Abstract We evaluated various construction methods including: Cast in Place Concrete, CMU, ICF, Precast Concrete, and Structural Steel for an Electrical.
Applying the Federal Cabinet Directive on Streamlining Regulation Regulatory Craft in Nova Scotia Conference 2007 Halifax, Nova Scotia November 20, 2007.
Connecticut Department of Public Works -- Rebecca Cutler – Environmental Analyst.
EHS presentation 28 April Presentation Content Introductions Background to aNSwer Origins of project AMAS contract aNSwer:
Cape Breton Coal Miners Strike
About Engineering Control Corp (ECC) provides construction design, support services and engineering controls to mitigate.
HEALTH, DISABILITY & AGING Introduction to Sociology Adam Isaiah Green Winter 2013.
American Foundry Society – Small Foundry Conference December 3-4, 2008 – Schaumburg, IL Highlight on AFS Energy Management Brian Reinke, President TDI.
SITE OBSERVATIONS SUMMARY (January through December 2010) McCormick and Baxter Superfund Site Portland, Oregon.
Current Design and Implementation Challenges of Road Projects on the Coastland Ron Rahaman Chief Roads and Bridges Officer Ministry of Public Works Works.
TOUR DE TABLE – CANADA NATO/CCMS Pilot Study Prevention and Remediation In Selected Industrial Sectors: SEDIMENTS Presented by Lisa Keller, P. Eng. Environment.
1 Sustainable Real Property Presentation to the National Executive Forum on Public Property by Bruce Lorimer Director General Professional and Technical.
March 25, 2013 Strategic Facility Planning “Moving Forward”
Presentation to the NLCA-303 Workshop.  INCREASED INUIT PARTICIPATION IN BUSINESS OPPORTUNITIES  IMPROVED CAPACITY FOR INUIT FIRMS TO COMPETE FOR GOVERNMENT.
1 Presented by: Dolores Coelho Sr. Program Officer Aboriginal Procurement and Business Promotion Directorate (APBP) Aboriginal Affairs & Northern Development.
Coastal Brownfields: At the Water’s Edge Panel: Waterfront Revitalization and Marine Transportation.
With news reports, rampant pollution and who can forget the Gulf oil spill, we must beg the question “What’s in the water?”
Electronic duty of care Phil De Caux: Partnerships manager WFAA workshop - May 2012.
MELBOURNE DOCKLANDS PRECINCT DEVELOPMENT & THE FORMER WEST MELBOURNE GASWORKS REMEDIATION PROJECT Andrew Labbett – Associate Remediation Engineer.
Local Economic Benefits Vendor Briefing July 20 th, 2007 Sydney, Nova Scotia.
Ottawa’s Light Rail Transit Project OLRT Update to Finance and Economic Development Committee March 2011.
Portland Harbor Superfund Site. Overview of Statutes CERCLA - Federal law –Provides EPA with authority for clean up –Provides for liability, compensation,
Overview of the Communication Networks and Services Research (CNSR) Project A multi-institute proposal to the Atlantic Innovation Fund by Dalhousie University.
Brian Hitchens and Sam Williams PCBs in the Urban Environment: Implications for Long-Term Sustainability Of Low-Threshold Remediation.
COMPANY PROFILE  Corporate profile:   etc.  Mission and activities:   etc. 1/2.
School Surveillance Active, Passive or Combination By: Beverly Billard.
The Role of NEPA Leasing and Mineral Rights Sales Subject to Environmental Use and Planning Provisions –The National Environmetal Policy Act of 1969 requires.
HAMPTON ROADS REGIONAL WATER RESOURCES MANAGEMENT PROGRAM Presentation John M. Carlock, AICP Deputy Executive Director, Physical Planning Hampton Roads.
Republican Policy Group Convention Center Authority April 30 th 2015.
Alternative Rate Structure Paul Smith Vice President, Rates Duke Energy Ohio June 20, 2006.
Britannia Village Flood Control Project Report Back to RVCA Board of Directors – Dec 16, 2010 after attendance at Community Meeting of November 30, 2010.
Parliamentary submission on the eradication of the Bucket Toilet System 22 & 23 February 2007 Cllr. Derrick Ndlovu.
Sydney Tar Ponds Remediation —Experience to China Fan Liu & Ken Bryson Wuhan University, China & Cape Breton University, Canada.
Capital Facilities Program Update San Rafael City Schools 10 May 2016.
1 Canadian Brownfields An Emerging Market Presentation By: Mitchell Fasken President MATRIX PROPERTIES LTD. Tammy Lomas-Jylha General Manager,
Karolina Brownfields Redevelopment Site Ostrava, Czech Republic Thomas C. Voltaggio Senior Advisor Dawson & Associates
Southeast strategic regional coastal monitoring programme Strategic Regional Coastal Monitoring Programme Procurement & Contract Management.
Shared Services SA SA TENDERS AND CONTRACTS Shared Services SA Presented by Glenn Dawson, Principal Consultant Electronic Procurement Services.
Maritime Provinces Regional Committee on Coastal and Ocean Management (RCCOM) Russell Henry, New Brunswick Department of Fisheries Tim Hall, DFO Maritimes.
IOPD XI 2008 June 17, 2008 Berlin, Germany Biofuels and National Agricultural Policy State of Affairs and Future Prospects: Canada Stewart Gilroy Chair,
PRESENTED BY HENRY RUHNKE WALD, RUHNKE & DOST ARCHITECTS, LLP SIERRA HOUSE & DROP-IN CENTER.
Stage 2 Light Rail Transit Program “In the ground ready”
MOVING FORWARD!!.
Cottonwood Recycled Water Pipeline (West)
Responsible Development
Sustainable Dredging through Community Involvement
BUS 511 Become Exceptional/ newtonhelp.com. BUS 511 Week 1 Creating Business Strategies and Goals For more course tutorials visit BUS.
EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE
Remediation of Environmental Lead Contamination
Acquisition Details: Owners: James E Joyce Sr. Revocable Intervivos Trust and Gloria A Joyce Revocable Intervivos Trust Location: Section 27, Town of.
PROGRAMME 2 CONT - NATIONAL WATER RESOURCES INFRASTRUCTURE BRANCH.
Presentation transcript:

Sydney Tar Ponds Agency President Frank Potter

 1899 – Dominion Iron and Steel Company Ltd. (DISCO) begins construction of steel plant on eastern shore of Wintering Cove in Sydney Harbour  In 1968, the Province of Nova Scotia buys the plant and forms Sydney Steel Corp (Sysco)  In 1968, Government of Canada buys Coke Ovens, forms the crown corporation Cape Breton Development Corporation (DEVCO)  In 1973, Sysco takes over Coke Ovens from DEVCO  In 1982, DFO find PAHs from the Tar Ponds in Sydney Harbour lobsters. The south arm of the harbour was closed – indefinitely

 A $400 million cost-share agreement between the Province of Nova Scotia and the Government of Canada was signed in May, 2004  Three weeks of panel hearings were held in April 2006 to assess the project’s Environmental Impact Statement  The panel submitted its report in July, 2006; the cleanup plan was modified to reflect panel’s 55 recommendations

“ Vision without action is a dream. Action without vision is simply passing the time. Action with Vision is making a positive difference.” -Joel Barker

In Our Sites Tar Ponds 33 hectares (81 acres) 700,000 tonnes of sediments contaminated with PAHs 45,000 tonnes of sediments contaminated with more than 50 ppm PCBs 30+ sewer outfalls An average of 13 million litres per day of sanitary sewage Coke Ovens 72 hectares (178 acres) 300,000 tonnes of soil contaminated with PAHs & VOCs (no PCBs) Tar cell at northwest corner of site contains 25,000 tonnes of coal tar

Tar Ponds  Cost: $256 million  Duration: 7 years  Technology: Treat Material in place with stabilization and solidification, then encapsulate with a multi- layered, engineered cap Coke Ovens  Cost: $144 million  Duration: 6 years  Technology: Treat contents of tar cell (25,000 tonnes) with solidification and stabilization, then encapsulate the rest of the site with a multi-layered, engineered cap

Cost-Share Agreement Government of Canada Province of Nova Scotia $280 million$120 million

Procurement Initiatives Local Economic Benefits Tenders have a 15 percent weighting in each contract evaluation First Nations The first aboriginal set-aside project (the cooling pond) for the Province of Nova Scotia An aboriginal procurement strategy is being developed

Community Liaison Committee Formed in members Monthly meetings Community is represented (6 sectors) Group is a sounding board for governments Access to project experts Supported by the Agency’s administrative staff