Office of Traffic, Safety and Technology Module 6 Specifications and Special Provisions Traffic Control Plan Development Course.

Slides:



Advertisements
Similar presentations
Metro Muncipal Agreement Program
Advertisements

CM/CG Contracting Tom Ravn, Mn/DOT Director, Office of Construction and Innovative Contracting.
Bob Smith, P.E. Region 1 Benjamin Acimovic, P.E., Region 1
Construction Contracting
Innovative Contracting
PART III: Going After Jobs. Who Provides the Offer & Who Accepts.
DISTRICT FIVE CONSTRUCTION CONTRACT ADMINISTRATION UPDATE TRAINING Submission of Working Schedule Specification SP A.
Innovative Contracting Techniques that Consider Driver Impacts Use of A+B Bidding Presented by: David L. Kent P.E. New York State Department of Transportation.
November 19, 2013 Preparing a Successful RFP to get Desired Results.
Contract Law 2014 NCHCA Education Series- January 23, 2014 Presented by Geoffrey Cantello, City of Ottawa and Ron Price, Rasmussen Starr Ruddy LLP.
State Aid Design-Build Project Delivery for Minnesota Cities and Counties.
Alternative Project Delivery
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
Innovative Contracting Construction Management Association of America Seminar May 17, 2013 California Department of Transportation.
CIVL202 Construction Engineering I
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
Performance Monitoring All All Contracts require basic monitoring once awarded. The Goal of contract monitoring is to ensure that the contract is satisfactorily.
MASTERING THE RFQ PROCESS Genanne Wilson, DJJStu Potlock, DMS Gina Gibson, STOBill Zimmerman, DOHVonnie Allen, AWI Department of Management Services Division.
Discussion Topics Construction Contract Administration Lessons Learned Other Construction Issues Questions? / Comments (Anytime)
2015 Traffic Signals 101 Topic 12 Special Provisions.
Determining Innovative Contracting Methods to Reduce User Costs Stuart Thompson Utah Technology Transfer Center.
Module V Final Wrap-Up ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control (SC) III Tracking, Wind Erosion, and Construction.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Rural Intersection Conflict Warning System (RICWS) Design-Build Project.
Discussion Topics Construction Contract Administration Other Construction Issues Questions? / Comments (Anytime)
Mn/DOT AUDIT COUNTY HIGHWAY ACCOUNTANTS SINGLE AUDIT DISCUSSION.
Construction Contracts and Project Delivery Methods
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
TH 2 – Wilton Bridge Replacement Design-Build Project S.P March 5, 2009 Todd Vonasek, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING.
CONSTRUCTION MANAGEMENT CONSTRUCTION ENGINEERING & MANAGEMENT DEPT
YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT. A contract is a legally binding agreement between two or more parties.
2010 Construction Contract Standards Training Part Standard Specifications November 2011.
Specification & Quantities Estimating
New York State Department of Transportation Accelerated Bridge Program Phase 1B Design-Build Projects Request for Proposals Informational Meeting April.
Conditions of the Contract ACT Objective To provide an overview of the Conditions of the Contract, their purpose, content, and relationship to.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
Maintenance Specifications For Jan and beyond.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Presented By: Jeffrey T. Folden, P.E. Assistant Chief, Innovative Contracting Division.
Safe & Sound Bridge Improvement Program. Purpose of Meeting Introduction of Team Today’s discussion  History of Safe & Sound  DBFM to MDBB/DB split.
Office of Traffic, Safety, and Technology February 2012 Arden Hills, Minnesota Minnesota DOT Intelligent Transportation Systems Project Management Design.
Contractor Alternate Design Serving the Public’s Best Interest.
FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING SPRING SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.
LACCD Building the Future THOMAS HALL Director Facilities Planning and Development.
2010 Construction Contract Standards Training Part 2 TOOLS October 2012.
2010 Construction Contract Standards Training Part 2 Prototype October 2011.
MnDOT Intelligent Transportation Systems Project Management Design Course Section 5: Special Provisions.
1. Design-Build is a project delivery process in which the design and construction phases of a project are combined in a single contract. The consultant.
Project Delivery Performance Improvement Report to the Oregon Transportation Commission Hal Gard, Technical Services, Geo-Environmental Dee Jones, Technical.
The Contract Management Process Post Award Activities.
ITS Device Standards & Procurement Project PURPOSE  Develop a series of Standards & Strategies designed to guide and provide consistency across the development.
Measure N Modernization IMPLEMENTATION PROCESS Planning, Bidding, Construction, and Occupancy.
Chapter 8 Specifications & Special Provisions
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Chapter 8 Specifications & Special Provisions
* Topic 12 Special Provisions
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
Innovative Contracting and Trns*Port
Designers’ Manual Overview and Chapter Contents
Caltrans 2010 standard specifications
Traditional Steps Leading To A Bid Document
PROJECT DELIVERY METHODS
Design-Build Acquisition and Contract Incentives July 19, 2018
Construction Contracts
Design-Build Acquisition and Contract Incentives May 9, 2019
Directed Change Constructive Change
Txdot field inspection
Diversity management system (DMS)
Presentation transcript:

Office of Traffic, Safety and Technology Module 6 Specifications and Special Provisions Traffic Control Plan Development Course

Office of Traffic, Safety and Technology 2 MnDOT Standard Specification for Construction Book (Spec Book)  The “Spec Book” contains standard specifications used and referred to in –Plans –Special Provisions  2014 Spec Book –includes numerous modifications to the 2005 Spec Book  MnDOT produces a new Spec Book on a 5 year cycle

Office of Traffic, Safety and Technology 3 Spec Book  Format of the Spec Book –The Spec Book is made of three divisions: Division I - General Requirements and Covenants Division II - Construction Details Division III - Materials

Office of Traffic, Safety and Technology 4 Spec Book  DIVISION I — General Requirements and Covenants –Each Division I Specification number begins with “1” (1101 – 1911) –Nine (9) sections –Section 1404 of Division I contains information on Maintenance of Traffic

Office of Traffic, Safety and Technology 5 Spec Book  1404

Office of Traffic, Safety and Technology 6 Spec Book

Office of Traffic, Safety and Technology 7 Spec Book

Office of Traffic, Safety and Technology Coordination of Plans and Specifications

Office of Traffic, Safety and Technology 9 Spec Book  DIVISION II — Construction Details –Each Division II Specification number begins with “2” ( ) –Six sections 1. General ( ) 2. Grading ( ) 3. Base Construction ( ) 4. Pavement Construction ( ) 5. Bridges and Structures ( ) 6. Miscellaneous ( )

Office of Traffic, Safety and Technology 10 Spec Book –Each section is generally divided into the following sections: 1. Description 2. Materials 3. Construction Requirements 4. Method of Measurement 5. Basis of Payment

Office of Traffic, Safety and Technology 11 Spec Book  DIVISION III — Materials –Each Division III Specification number begins with “3” ( ) –Division is divided into eighteen sections

Office of Traffic, Safety and Technology 12 MnDOT Contract Proposal  Contents –Each MnDOT project has a proposal –The proposal contains items such as: Addendums Notices to Bidders Appendices Special Provisions (by division, for example: Division A, Divisions S, Division SS, Division SL, Division ST, etc.) Attachments Contract Schedule (Bid Prices)

Office of Traffic, Safety and Technology 13 Special Provisions  Special Provisions are defined as: –“Additions and revisions to the Standard and Supplemental Specifications covering conditions peculiar to an individual project” –Special Provisions are just that: “SPECIAL” provisions –If an item(s) is adequately addressed or specified in the Spec Book, Standard Plates, Plan, or other Contract documents, then that item(s) should not be duplicated within the Special Provisions

Office of Traffic, Safety and Technology 14 Special Provisions  Topics that are always covered by Special Provisions include –Construction Start Dates –Completion Dates –Traffic Control –Special Pay Items  The Special Provisions need to cover every special pay item from the Plan

Office of Traffic, Safety and Technology 15 Special Provisions  Division S is for general projects  Special Provisions may be formatted into more than one S section –Time and Traffic (Division S) S-1 Contact Information S-2 (1404) Maintenance of Traffic and (2563) Traffic Control S-3 (1710) Traffic Control Devices S-4 (1806) Determination and Extension of Contract Time S-5 (1807) Failure to Complete The Work on Time S-6 (2563) Traffic Control Supervisor

Office of Traffic, Safety and Technology 16 Special Provisions  The following sections can be found in the Special Provisions: –Opening Descriptive Paragraph –General Section –Materials –Construction Requirements –Measurement and Payment

Office of Traffic, Safety and Technology Special Provisions  Special Provision Boiler Plates –Standard special provisions have been developed for use on MnDOT Construction projects –The following is a handout of the “boilerplate” special provisionsspecial provisions 17

Office of Traffic, Safety and Technology Innovative Contracting Methods  Innovative Contracting incorporates new practices to supplement traditional low- bid, design-bid-build contracting  Innovative Contracting Guidelines Innovative Contracting Guidelines 18 Page 6-61

Office of Traffic, Safety and Technology Innovative Contracting Methods  Types of Processes –A+B Bidding A+B bidding reduces contract time on projects Contractors bid the time to complete the project and a dollar amount for work items The contract is awarded to the lowest combination of time and cost. 19

Office of Traffic, Safety and Technology Innovative Contracting Methods  Types of Processes –Lane-Rental Lane-rental reduces impacts to the traveling public by minimizing the time lanes are closed Contractors are charged a fee for closing lanes and shoulders due to construction activities The concept focuses on the time that the public is affected, NOT the overall contract time 20

Office of Traffic, Safety and Technology Innovative Contracting Methods  Types of Processes –Incentives/Disincentives The contractor is paid for early completion of a project as provided for in the contract If the contractor completes the project later than the time allowed, disincentive money is subtracted from payments due 21

Office of Traffic, Safety and Technology Innovative Contracting Methods  Types of Processes –Constructability Reviews The industry provides valuable feedback into key areas that the Agency may not be able to quantify during the project development process Feedback on preliminary plans has the potential to significantly reduce project costs and construction timelines 22

Office of Traffic, Safety and Technology Innovative Contracting Methods  Types of Processes –Locked Incentive Date A locked incentive date provides an incentive if the contractor completes the work done early Contractors are not allowed any extensions in the completion date, regardless if extensions are owner caused or not 23

Office of Traffic, Safety and Technology Innovative Contracting Methods  Types of Processes –Design-Build Design and construction phases overlap, allowing faster overall project delivery 24

Office of Traffic, Safety and Technology Innovative Contracting Methods  Types of Processes –Pay-for-Performance Pay-for-performance specifications rely on final outcomes measured against performance criteria set forth in the contract If the contractor fails to meet minimum performance criteria, payment is withheld and corrective action is required 25

Office of Traffic, Safety and Technology Innovative Contracting Methods  Types of Processes –Warranties Warranties require contractors to guarantee all or portions of a construction project to be free of defects in materials and workmanship for a period of time The contractor is required to correct deficiencies that occur during the warranty period. 26

Office of Traffic, Safety and Technology Innovative Contracting Methods  Types of Processes –Critical Path Method (CPM Schedules) Critical Path Method (CPM) schedules are excellent tools for both the contractor and MnDOT to monitor contract time during a construction project 27

Office of Traffic, Safety and Technology Innovative Contracting Methods  More Info –A+B –Lane-Rental –Incentives/Disincentives –Constructability Reviews –Locked incentive Date –Design Build –Pay-for-Performance –Warranties –Critical Path Method 28

Office of Traffic, Safety and Technology End  Questions?  Training Certificates  List  Evaluation Forms 29