SuperB Detector Summary SuperB Miniworkshop, Oxford 18/19 th May 2011

Slides:



Advertisements
Similar presentations
Jaap Velthuis, University of Bristol SPiDeR SPiDeR (Silicon Pixel Detector Research) at EUDET Telescope Sensor overview with lab results –TPAC –FORTIS.
Advertisements

Striplet option of Super Belle Silicon Vertex Detector Talk at Joint Super B factory workshop, Honolulu 20 April 2005 T.Tsuboyama.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
SPiDeR  First beam test results of the FORTIS sensor FORTIS 4T MAPS Deep PWell Testbeam results CHERWELL Summary J.J. Velthuis.
1 Conceptual design adopts state-of-the-art silicon sensor techniques (compare ATLAS/CMS/ALICE inner tracker layers, BaBar tracking of B mesons). Design.
October 28-th, 2005Straw tracker 1 Status of Straw Tracker for P236 P.L. Frabetti, V.Kekelidze, K.Kleinknecht, V.Peshekhonov, B.Peyaud, Yu.Potrebenikov,
First Results from Cherwell, a CMOS sensor for Particle Physics By James Mylroie-Smith
Simulation issue Y. Akiba. Main goals stated in LOI Measurement of charm and beauty using DCA in barrel –c  e + X –D  K , K , etc –b  e + X –B 
Semi-conductor Detectors HEP and Accelerators Geoffrey Taylor ARC Centre for Particle Physics at the Terascale (CoEPP) The University of Melbourne.
SPiDeR  SPIDER DECAL SPIDER Digital calorimetry TPAC –Deep Pwell DECAL Future beam tests Wishlist J.J. Velthuis for the.
1 Digital Active Pixel Array (DAPA) for Vertex and Tracking Silicon Systems PROJECT G.Bashindzhagyan 1, N.Korotkova 1, R.Roeder 2, Chr.Schmidt 3, N.Sinev.
First tests of CHERWELL, a Monolithic Active Pixel Sensor. A CMOS Image Sensor (CIS) using 180 nm technology James Mylroie-Smith Queen Mary, University.
A Silicon vertex tracker prototype for CBM Material for the FP6 Design application.
Thin Silicon R&D for LC applications D. Bortoletto Purdue University Status report Hybrid Pixel Detectors for LC.
PHASE-1B ACTIVITIES L. Demaria – INFN Torino. Introduction  The inner layer of the Phase 1 Pixel detector is exposed to very high level of irradiation.
At the HERA collider in Hamburg an experiment (ZEUS) has been built to study electron-proton collisions. For the near future an upgrade of this experiment.
PHENIX Silicon Vertex Tracker. Mechanical Requirements Stability requirement, short and long25 µm Low radiation length
Adrian Bevan Queen Mary, University of London SVT Mechanical Support and Strip Sensors.
CLICdp achievements in 2014 and goals for 2015 Lucie Linssen, CERN on behalf of the CLICdp collaboration CLIC workshop, January 30 th
Technology Overview or Challenges of Future High Energy Particle Detection Tomasz Hemperek
UK Activities on pixels. Adrian Bevan 1, Jamie Crooks 2, Andrew Lintern 2, Andy Nichols 2, Marcel Stanitzki 2, Renato Turchetta 2, Fergus Wilson 2. 1 Queen.
26 Apr 2009Paul Dauncey1 Digital ECAL: Lecture 2 Paul Dauncey Imperial College London.
High-resolution, fast and radiation-hard silicon tracking station CBM collaboration meeting March 2005 STS working group.
CMOS MAPS with pixel level sparsification and time stamping capabilities for applications at the ILC Gianluca Traversi 1,2
CMOS Sensors WP1-3 PPRP meeting 29 Oct 2008, Armagh.
WG3 – STRIP R&D ITS - COMSATS P. Riedler, G. Contin, A. Rivetti – WG3 conveners.
Blair Ratcliff, SLACUS R&D Meeting, Sept. 3, 2008 Blair Ratcliff SLAC Detector R&D: Overview and Opportunities Detector Overview (some old news!). Present.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Technical Design for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
F. Bosi, M.Massa SuperB Workshop, Isola d’Elba May 28 – June2, 2011, 11 Layer0 - SVT Mechanics F. Bosi – M.Massa INFN-Pisa on behalf of the SuperB SVT.
Hybrid CMOS strip detectors J. Dopke for the ATLAS strip CMOS group UK community meeting on CMOS sensors for particle tracking , Cosenors House,
G. RizzoSVT Meeting – April, SVT Update SVT bi-weekly Meeting - April, Giuliana Rizzo Universita’ & INFN Pisa Group Organization & WBS.
1/20 LHCb upgrade, Jeroen van Tilburg Nikhef Jamboree, 14 Dec 2015 Preparing for the LHCb upgrade.
Low Mass, Radiation Hard Vertex Detectors R. Lipton, Fermilab Future experiments will require pixelated vertex detectors with radiation hardness superior.
G. RizzoSVT Status – SuperB Workshop, SLAC Oct SVT- Status Update on R&D activities for TDR X SuperB General Meeting Workshop SLAC – Oct. 6-9,
The SuperB Silicon Vertex Tracker Abstract : The SuperB project aims to build an asymmetric e+ - e- collider capable of reaching.
F. Bosi -SuperB Collaboration Meeting, QMUL, 13 – 16 September SVT Mechanics F. Bosi INFN-Pisa on behalf of the SuperB SVT Group.
Advanced Monolithic Active Pixel Sensors with full CMOS capability for tracking, vertexing and calorimetry Marcel Stanitzki STFC-Rutherford Appleton Laboratory.
G. RizzoSVT - SuperB Workshop – Paris 16 Feb SVT Plans for TDR Activities since Elba Meeting Plans for TDR preparation Giuliana Rizzo Universita’
Update on & SVT readout chip requirements
SVT – SuperB Workshop – Annecy March 2010
Valerio Re INFN Pavia and University of Bergamo
for the SPiDeR collaboration (slides from M. Stanitski, Pixel2010)
F. Bosi INFN-Pisa on behalf of the SuperB SVT Group
Detector building Notes of our discussion
SVT Parallel-SuperB Workshop Perugia, June
SVT subchapters & editors
Preliminary thoughts on SVT services
BaBar Silicon Tracker Perspective
SVT – SuperB Workshop – SLAC 6-9 Oct 2009
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
Layer0 - SVT Mechanics update (MDI meeting)
ATLAS-MUON Trigger hardware developments
Hybrid Pixel R&D and Interconnect Technologies
SVT Mechanics Baseline SuperB SVT configuration
Simulated vertex precision
The SuperB Silicon Vertex Tracker
SVT Issues for the TDR What decisions must be taken before the TDR can be written? What is the mechanism for reaching those decisions How can missing information.
SVT detector electronics
SVT detector electronics
Francesco Forti SuperB Workshop LNF, March, 2006
Vertex Detector Overview Prototypes R&D Plans Summary.
SVT- Status Update on R&D activities for TDR
Enhanced Lateral Drift (ELAD) sensors
SVT detector electronics
SVT – SuperB Workshop – Frascati Sept. 2010
Perugia SuperB Workshop June 16-19, 2009
Presentation transcript:

SuperB Detector Summary SuperB Miniworkshop, Oxford 18/19 th May

The SuperB Silicon Vertex Tracker This is the dateWho - title2  SVT provide precise tracking and vertex reconstruction, crucial for time dependent measurements, and perform stand-alone tracking for low p t particles.  Physics performance and back. levels set stringent requirements on Layer0:  R~1.3 cm, material budget < 1% X 0  hit resolution um in both coordinates  Track rate > 5MHz/cm 2 (with large cluster too!), TID > 3MRad/yr  Several options under study for Layer0  Based on BaBar SVT: 5 layers silicon strip modules + Layer0 at small radius to improve vertex resolution and compensate the reduced SuperB boost w.r.t PEPII 40 cm 30 cm 20 cm Layer0 old beam pipe new beam pipe B  ,  =0.28, hit resolution =10  m  t resolution (ps) 18/19 May 20112Fergus Wilson, RAL

SuperB SVT Layer 0 technology options Sensor Digital tier Analog tier Wafer bonding & electrical interconn.  Striplets option: mature technology, not so robust against background occupancy.  Marginal with back. track rate higher than ~ 5 MHz/cm 2  FE chip development & engineering of module design needed  Hybrid Pixel option: viable, although marginal.  Reduction of total material needed!  FE chip with 50x50 μ m 2, pitch & fast readout (hit rate 100MHz/cm 2 ) under development  FE prototype chip (4k pixel, ST 130 nm) successfully tested with pixel sensor matrix connected.  CMOS MAPS option: new & challenging technology.  Sensor & readout in 50 μ m thick chip!  Extensive R&D (SLIM5-Collaboration) on  Deep N-well devices 50x50 μ m 2 with in-pixel sparsification.  Fast readout architecture with target hit rate 100MHz/cm 2 & 100 ns timestamping developed..  CMOS MAPS (4k pixels) successfully tested with beams.  Thin pixels with Vertical Integration: reduction of material and improved performance.  Two options are being pursued (VIPIX-Collaboration)  DNW MAPS with 2 tiers  Hybrid Pixel: FE chip with 2 tiers + high resistivity sensor 18/19 May 20113Fergus Wilson, RAL deep p well MAPS from RAL is a promising development.

MAPS  Charged particle generates free charge carriers in epitaxial layers.  Due to doping profiles, electrons are confined to epitaxial layer.  Electrons diffuse.  When close to diode electrons collected  Deep p-well protects electronics

(Pixel) Sensor Overview Calorimetry Tracking Vertexing Deep p-well TPAC 1.0TPAC 1.2TPAC 1.1 High Res & 4T INMAPS FORTIS 1.0FORTIS 1.1 TODAY Stitching TPAC for SuperB CHERWELLCHERWELL2 FuturePast DECAL 18/19 May 20115Fergus Wilson, RAL

Strip sensors  BaBar used 300 μ m double sided strip sensors made by Micron semiconductor.  6 types of sensors (6 sets of masks, 6 geometries required)  Need to design and fabricate a thinner version of these sensors.  Need to identify team to design masks.  Will require QA at production site.  Each sensor will need to be validated at a lab post-production in order to validate manufacturer specs and ensure only high quality sensors are used in modules.  Semi-automatic probe stations available in Pisa, RAL, QM for this purpose. Additional sites would be welcome.

Mechanics Adrian Bevan: SuperB Physics7  L0:  Support from the beampipe  L1-5  Support from the cryostat/tungsten shield  Generic solution for inner/outer layers is independent of technology choices.  Need to have quick access to the SVT/IR region for repair work during the lifetime of SuperB.

BaBar SVT Support cone Space frame (CFRP tubes) Fixtures to bilt halves together Modules Gimbal rings

L0 Light pixel module support & cooling  Light support with integrated cooling needed for pixel module: P~2W/cm 2  Carbon Fiber support with microchannel for coolant fluid developed in Pisa:  Total support/cooling material = 0.28 % X 0 full module, 0.15% X 0 net module  Thermo-hydraulic measurements in TFD Lab: results within specs 700  m Carbon Fiber Pultrusion Peek tube Net Module  = 0.15%  mm 700  m Full Module  = 0.28%  0 Full module supports with microchannels glued toghether

Fast extraction system  Aim:  Access SVT/permanent magnets in the IR within a few days.  Central cryostat/magnet SVT supported off of the same object.  Modifications/repairs on the innermost detector/accelerator components will be relatively quick to perform. Remove vacuum pipe in drift regions near IR. Move ends of detector out of the way. Slide cryostat support on rail (with tungsten shield and SVT). Set up temporary clean room to replace L0 if damaged. 2-3 week turn around.

SVT Radiation Protection system Adrian Bevan: SuperB Physics11

SVT Radiation Protection system Adrian Bevan: SuperB Physics12 Sensor cost ~£100 Cheap to build a sensor array for SuperB

SVT Radiation Protection system Adrian Bevan: SuperB Physics13 Cost in electronics: Option 1: cheap off of the shelf solution O(ns) resolution. Option 2: Fast electronics (becomes a beam diagnostic tool: on detector fast lumi monitor?) Assume Option 1 is good enough for SuperB (based on yesterday's discussion)

Computing Adrian Bevan: SuperB Physics14  UK contribute a significant fraction of SuperB GRID Monte Carlo production resources.  Little / no manpower require: minimum effort is to enable VO at site, and then SuperB uses available resources transparently.  Large technical pool in computer literate people in the UK  opportunity to explore new technologies for a new project  Could feed back into running experiments (e.g. LHC) without exposing them to risk.  Timescale compatible with LHC upgrade (2021)  Need to embrace GRID more openly than BaBar (already being done within SuperB)

Computing Adrian Bevan: SuperB Physics15 Essentially a small fraction of code could be re- used, this is an opportunity to start afresh with an improved system.

Computing Adrian Bevan: SuperB Physics16 New technology to adopt soon: e.g. OO GEANT in etc. C++: use whole language or restrict coding standards? Use python to glue system together should learn from other experiments e.g. CLEO-c/Belle

Computing Adrian Bevan: SuperB Physics17 Many interesting areas for computing folks to play a role. BaBar experience of needing ~20FTE/yr to support computing is unusual... Other experiments have a few core people.

Summary Adrian Bevan: SuperB Physics18  RAL & QM are submitting an SoI to STFC for the 23 rd May.  Focus to work on design and construction of the SVT in collaboration with INFN.  concentrate on sensors and mechanics.  Funding envelope defined by JW is compatible with this.  Aim to refine costing and submit proposal by the end of the year.  New groups are welcome to participate in this endeavour.  Independent of that: Aim to work on bringing together the experimental flavour community into some common forum.