November 7, 2013. Status * Task group initiated in November 2011. * Steering Committee requested a summary report in July 2013. * Summary report deemed.

Slides:



Advertisements
Similar presentations
COMPANY MAINTENANCE MANUAL
Advertisements

Westinghouse Owners Group Risk-Informed Repair and Replacement – Implementation of 10 CFR Twelfth International Conference on Nuclear Engineering.
“RULES FOR INSERVICE INSPECTION OF NUCLEAR PLANT COMPONENTS”
Railway Grade Separations Issues. Railway Grade Separations 1.Introduction Qualifications/experience to undertake bridge planning for railway grade separations:
STATUS OF ASME CC N-755 & N-808 Frank J Schaaf, Jr Sterling Refrigeration Corp NESCC Meeting Washington DC 18 April 2013.
Codes & Standards.
Page  ASME 2014 Standards and Certification Training Module A – Administrative A2.Standards and Certification Products ASME S&C Training Module A2. Standards.
NE 127 – Codes, Standards, and Regulations American Welding Society INSTRUCTOR: Chattanooga State CC.
By Eva Freund, The IV&V Group, Inc.
LATA Environmental Services of Kentucky, LLC Process for Approved Supplier Selection and Evaluation ASME NQA (and Addenda through 2007), Part I.
COMPANY PROFILE +66 (0) , +66 (0) , +66 (0) , +66 (0) /65 Moo 4 Tumbol Tubma Amphur Muang Rayong 21000
EQUIPMENT VALIDATION.
Subsea Standardization. Brief History SPE ATW on Subsea Standardization held Dec 2008 SPE ATW on Subsea Standardization held Dec 2008 –Form workgroup.
International Civil Aviation Organization Regional Cooperation in the Southern African Development Community (SADC) Cliff Elbl CTA/Project Coordinator.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Project Change Management
The ISO 9002 Quality Assurance Management System
FAA Regulatory Policy for Composite Material Control Presented at 8/8/02 FAA/NASA Workshop (Chicago, IL) Introduction – Importance of stabilizing composite.
RIM ) - REWRITE OF SECTION XI, DIVISION II, USING RISK INFORMED METHODOLOGY - FRANK J. SCHAAF,JR, P.E. ASME CHAIRMAN, SWGRIM CONSULTANT, STERLING REFRIGERATION.
Marjan Smit International Supplier Auditing (ISA) Head office
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 January 2014.
ISO 9000 Certification ISO 9001 and ISO
"Welder Certification" The purpose of this presentation is to introduce you to the various aspects of welder certification. This is not intended to cover.
Status Report: Welding Task Group Report to NESCC – 28 March 2013 Tom Siewert – NIST
1 NRC Follow-up Actions on NESCC Task Group Reports (Concrete Repair, Cabling and Welding) NESCC Meeting November 7, 2013 Richard Jervey USNRC Office of.
Pressure Equipment Regulations - the introduction of a new category of AIA and the impact on SAQCC Certified Competent Persons AIA Meeting November 2010.
RJC Certification - (COP 9) Bribery and Facilitation Payments Training Module – March 2014.
Training Services Consultancy Auditing Inspection S.
SELECT Scheme Provider Certification of Construction (Electrical Installations to BS 7671)
Tim Haeberle API SC Winter Meeting
Basic Principles of GMP
CHAPTER 5 Infrastructure Components PART I. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser 2 Learning Objectives: To discuss: The need for SQA procedures.
Certificate in Pipeline Construction, Welding & Inspection LECA LEXTON ENERGY CORPORATE ACADEMY Copyright 2013 Lexton Energy Incorporated PCWI delivered.
Basics of OHSAS Occupational Health & Safety Management System
PART 2: A FRAMEWORK FOR SOFTWARE PROCESS IMPROVEMENT (SPI) Jean Charles Salvin Markus Erlandsson Jan-Peter Nilsson.
ICAO Aerodrome Safety Workshop Almaty, Kazakhstan – 18 to 22 November 2002  AERODROME MANUAL.
King County Wastewater Treatment Division What you need to know about WTD’s Technical Standards.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Staffing and Training.
Summary of NRC HDPE Piping Confirmatory Research Activities NESCC HDPE Piping Road Map Workshop April 18, 2013 Washington, D.C. Eric Focht, Materials Engineer.
SEM MODS COMMITTEE SLIDES Registration of Charges over Collateral Reserve Accounts – Proposed Code Modification.
Welding Inspection and Metallurgy
BSBPMG405A Apply Human Resource Management Approaches Apply Human Resource Management Approaches Unit Guide C ertificate IV in Project Management
BSBPMG505A Manage Project Quality Manage Project Quality Project Quality Processes Diploma of Project Management Qualification Code BSB51507 Unit.
National Commission for Academic Accreditation & Assessment Developmental Reviews at King Saud University and King Faisal University.
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
Mechanical Integrity Training. Lesson Objectives  Describe MI Training Required  Describe How to Conduct Training  Describe Requirements for Maintaining.
Phased Array Training & Certification
Competence management for functional safety - a certifier’s viewpoint Paul Reeve Sira Test & Certification 2nd November 2007.
Status Report: Welding Task Group Report to NESCC – 23 July 2013 Tom Siewert – NIST
Company Confidential Registration Management Committee RMC Auditor Workshop Charleston, SC July Supplemental Oversight AS9104/2A & Special.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 1 Diploma of Project Management.
Workgroup on VET Systems. In This Session … What is the status of competency standards and VET suppliers in your country and are they able to work within.
AAQG Project # 56 Harmonized Process/Standard Oversight / Surveillance Prepared by: Tim Lee The Boeing Company The Boeing Company June 7, 2005 June 7,
2015 Pipeline Safety Trust Conference November 20 th, 2015 | New Orleans, LA API RP 1175 Pipeline Leak Detection Program Management – New RP Highlights.
API 17N (and Q) Subsea Production System Reliability, Integrity, and Technical Risk Management.
Page © ASME 2015 Module B – Process B4.Initiating and Terminating Standards Projects Standards and Certification Training.
Notified Body Problem Solving Warsaw, Poland 24/26 June 2004 Presented by Peter Hanmore For the benefit of business and people TAIEX Workshop on the Pressure.
API Spec 6A: ASME Section V And Section IX Reference Editions Tim Haeberle API SC Summer Meeting.
Equipment Life Optimization Program (ELOP) Doug Hilleman February 10, 2011.
Legal Status Task Force Report CWS/4/8, CWS/4 BIS/5 Geneva, Switzerland March 2016 Young-Woo YUN Head, Standards Section.
Slide 1 POA Seminar 02 March 2016 Personnel Competence Including Certifying Staff and Release to Service Andy Swift / Michael Greer.
ACCA/PAB/ICAJ/ICAC Practice Monitoring Reviews OVERVIEW OF FINDINGS 19 July 2014.
Beyond the BACoE: Developing Business Analysis Maturity.
Logo area MQXF Review: Safety Thomas Otto HL-LHC Project Safety Officer With contributions by -Paolo Ferrcin and Ezio Todesco, TE-MSC -Francesca Viggiano,
Fermi Site Office Assessment of Fermilab Welding Quality Assurance June 20-24, 2016.
Introduction CSWIP (Certification Scheme for Welding and Inspection Personnel) is administered by The Welding Institute. The CSWIP certification process.
Standards and Certification Training
PCS CONTENT ON CMS.
CR-GR-HSE-302 Management of change
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Presentation transcript:

November 7, 2013

Status * Task group initiated in November * Steering Committee requested a summary report in July * Summary report deemed to be a useful document containing timely information. * Topical report developed from summary report: * Includes only key issues and recommendations. * Does not include background research, detailed explanations, or additional documentation. * Reviewed and approved by Steering Committee.

Topical Report Content 5 Key Issues: 1. Need to eliminate inconsistencies between codes and standards in procedure and welder qualifications. * “Why do we need to repeatedly requalify to prove what we already know? * Why must we substantially repeat a test to meet the minor nuances of different codes?” 2. Need personnel certification of Welding Engineers. * There are serious gaps within the United States (U.S.) system for certification and training of personnel.

Topical Report Content 5 Key Issues - continued: 3. Need qualification route for Welding Supervisors/Welding Coordinators. * Many Welding Supervisors/Welding Coordinators do not have a welding background and would have difficulty in achieving PE or CWEng registration - need a training and certification route. 4. Need to make better use of the inspection capabilities of phased array technology. 5. Need to make repair decisions based on fitness-for-service assessments. * Many repair decisions are based on appearance by visual testing and nondestructive examination (NDE) results, and unnecessary repairs often introduce additional damage that can cause later failures during service. * Switching to repair decisions based on quantitative engineering calculations (e.g., fracture mechanics) rather than workmanship standards (e.g., appearance) would result in only necessary repairs being made and provide a quantitative measure of expected performance, rather than just accept/reject.

Topical Report Content 5 Recommendations: 1. Harmonize procedures and welder qualifications. * Develop a strong liaison between the AWS B2 committee (which is well aligned with ASME Section IX) and the AWS D1 committee so their welding procedure philosophies and requirements could be as similar as possible or, ideally, be identical. * Develop new standardized welding procedures and expand the scope of existing procedures so that individual companies do not need to develop their own procedures. * Develop uniform (maybe even standardized) procedures for welder qualification, so that one approach works for both ASME and AWS codes. * Responsible parties: ASME BPVC Section IX and AWS B2.1 and D1 committees

Topical Report Content Recommendations - continued: 2. Expand the options for welding engineer certification within the U.S. * Responsible party: AWS 3. Expand the personnel certification of welding supervisors. * Responsible party: AWS 4. Expand the allowed application of phased array Ultrasonic testing (PAUT) inspection within codes. * Responsible parties: AWS D1 committees and the Electric Power Research Institute (EPRI), with input from the phased array equipment developers and suppliers 5. Make more repair decisions based on fitness‐for‐service assessments. * Responsible parties: AWS and ASME

* Many thanks to Tom Siewert and the Welding Task Group for their diligence in pursuing this topic and for their flexibility in delivering a topical report within a compressed timeframe.