Project Update 4-15-2009 Joe Featherall Jeffrey Ryan Christopher Crowley.

Slides:



Advertisements
Similar presentations
Advanced Energy Vehicle
Advertisements

Roadmap for Sourcing Decision Review Board (DRB)
Developing a Marketing Culture to Drive Revenue Growth BackgroundBackground The client is a publicly held holding company with eight operating companies.
Mara Turolla April 25 th, LECTURE o COACHING EVOLUTION SCENARIO o DIFFERENT COACHING MODELS o RESEARCH DEBATE o GUESTS COACHES AGENDA.
Sooner Racing Team September 10 th 2012 Systems Breakdown & Design Opportunities.
Software Modeling SWE5441 Lecture 3 Eng. Mohammed Timraz
©2006 OLC 1 Process Management: The Foundation for Achieving Organizational Excellence Process Management Implementation Worldwide.
Filament Winding Machine. Project Name – Filament Winding Machine Project Number – P09226 Project Family – Competitive FSAE Autosports Systems Project.
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
COLLEGIATE DESIGN SERIES COLLEGIATE ROADSHOW TEAM ORGANIZATION Michael Royce Albion Associates, LLC.
Project Management: A Critical Skill for Organizations Presented by Hetty Baiz Project Office Princeton University.
Snapshot Presentation for:  NIATT seeks to be a leader in “Green Vehicle” technologies  Hybrid Technologies can improve performance as well as efficiency.
EDGE™ Preliminary Project Overview P09123 – MAV Platform Team Members: Joe Hozdic (Lead)Ming Chow Aaron NashBrian David Giovanni Sorrentino.
EDGE™ Concept Level Project Plan P08043 – Magnet Centering Device Aaaron Burger (Mechanical Engineer)
EDGE™ Project Status Update PYYNNN – Project Title Here DPM Student Presenter 1 (Dept) DPM Student Presenter 2 (Dept) DPM Student Presenter 3 (Dept) USE.
RIT Senior Design I, Project Review P07310: Electronic Shifted Manual Transmission George Slack Team Guide Jason BotterillTeam Leader, Mechanical Engineer.
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
IE673Session 4 - Customer Relationships1 Customer Relationships (The Voice of the Customer)
EDGE™ Project Status Update P09141 – Thermal Heater Control System Anthony Berwin (Mechanical Engineer)
STRATEGIC COST MANAGEMENT - BA122B – Fall Value Chain Analysis (VCA) & Target Costing.
EDGE™ Final Project Presentation P09141 – Satellite Thermal Heater Controller Anthony Berwin (Mechanical Engineer)
EDGE™ Project Status Update P09141 – Satellite Thermal Heater Control System Anthony Berwin (Mechanical Engineer)
P /20093 Composites Autoclave Brandon Allen (EE) Matt Brady (ME) Brian Cario (ME) Matt DiFrancesco (ME) John Mink (EE) ‏ Chris DeMinco.
ECM Project Roles and Responsibilities
Project Status Update P09457 – Process Improvement Project Eric MacCormack (IE) Colin Roy (IE)
R I T Team Members: Dan Lester → Team Lead Chris Feuerstein → Lead Engineer/Electrical Lead Mike Schwec → Electrical Support Jacob Hillmon → Electrical.
Presented by, Jeffrey Ryan.  To develop testing and data collection capabilities for the RIT Baja team and to help them utilize all available resources.
The Software Product Life Cycle. Views of the Software Product Life Cycle  Management  Software engineering  Engineering design  Architectural design.
Organizational Project Management Maturity: Roadmap to Success
NextEnd. Supply Chain Management – Definitions Supply chain management is the management of a network of interconnected businesses involved in the ultimate.
19-1 © 2006 The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin Innovation, Technological Change and Competition Technology  The skills,
INCOSE 1 st reactions. One other area that struck me has the sheer number of levels of proficiency—in ours we are going with 5 and the first one is limited.
1 The Business Growth Innovation Collaboratory (BGIC) NC State Executive Education.
SAE BAJA. It is a college competition to provide SAE student members with a challenging project that involves the planning and manufacturing tasks found.
Project Status Update R09220 – Competitive FSAE Autosports Systems Aaron Heyman (IE) Shijo George (ME) Stephanie Malinowski (ME) Alex Sandy (ME) Greg Wall.
PowerPoint Presentation for Dennis, Wixom, & Tegarden Systems Analysis and Design with UML, 3rd Edition Copyright © 2009 John Wiley & Sons, Inc. All rights.
2010 MBNQA WINNER: K & N MANAGEMENT – SMALL BUSINESS CATEGORY PRESENTED BY: MOORE, YAGER, TODD, PEAVY.
Advising Strategic Plan University of Cincinnati August 10,2015.
Campaign Readiness Project Overview Enabling a structured, scalable approach to customer-centric campaigns.
“Enterprising” Students Lead Campus Sustainability Initiatives at Michigan Tech Presented by: Andrew McKenzie Erin Valdivia Green Campus Enterprise AASHE.
Optical Encoder for a Game Steering Wheel May Team members Sam DahlkeCpr E Peter FecteauCpr E Dan PatesEE Lorenzo SubidoEE Advisors Dr. James Davis.
1 Project Management Introduction. 2 Chap 1 What is the impact? 1994: 16% of IT projects completed “On-Time” 2004 : 29% of IT projects “On- Time” 53%
Software Product Line Material based on slides and chapter by Linda M. Northrop, SEI.
Systems Analysis and Design in a Changing World, Fourth Edition
The Value Driven Approach
through Introduction  Particle Imaging Velocimetry (PIV) uses a sheet laser beam to illuminate particles that cross the sheet.  The particles.
Project Management Cross lifecycle Activity
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
Implementing Strategy Chapter 7. Objectives Upon completion of this chapter, you should be able to:  Translate strategic thought to organisational action.
Quality Management Theory Terms, Concepts, & Principles.
Thank You Sponsors. Thank You Sponsors Problem Statement Identification of Critical Subsystems Identification of Vehicle States Analysis of Vehicle States.
New Product Development Page 1 Teddy Concurrent Engineering by Teddy Sjafrizal.
Tim Southerton Brian Grosso Matthew Morris Lalit Tanwar Kevin Meehan Alex Reid.
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
Project Final Presentation Joe Featherall.
Lau Siang Hua See Shie Ping Terence Leow Shin Woei Ooi Kean Chong Cheong Sheng-En Jonathan Managing Technological Changes.
SAE and Technical Policy Analysis Shuvo Bhattacharjee ETAS Inc. – Diagnostic Systems
What has been accomplished at the end of MSD 1 & 2?
1 Industry Advisory Council’s Enterprise Architecture Shared Interest Group (IAC EA SIG) Collaborative Approach to Addressing Common Government- Industry.
EDGE™ Final Project Plan Presentation P09001 – RFID Reader & Active Tag Philip Davenport (Industrial and Systems Engineering)
Suspension Cody Dykman Jesse Ramer Jesson Salyards Frame Warren Starbuck Brett Schuler Doug Romoth Drive Train Josh Voorhees Corey Saner Spencer Garland.
Account Management Overview
Dr. Marcos Esterman Faculty Guide W. Casolara Project Leader
Chapter Outline Innovation, Technological Change, and Competition
Validation through Instrumentation
WaterHUB People Worksteam Update 10 July 2018.
Project Status Update R09220 – Competitive FSAE Autosports Systems
Project Readiness Review P10029 – Air Muscle Artificial Limb
Supply Chain Management: From Vision to Implementation
UNH Precision Racing Data Acquisition, Telemetry and Analysis
Presentation transcript:

Project Update Joe Featherall Jeffrey Ryan Christopher Crowley

Project Name 3 Projects To be Determined Roadmap Number R10221 Project Family RIT Baja SAE Roadmap Track Automotive Engineering Start Term End Term Faculty Guide Dr. Nye Faculty Consultant Professor Deminco Primary Customer RIT Baja SAE

RIT BAJA SAE UNVEILING 2009  Off-road Vehicle Design Competition  Design, Build, Test Off-road Vehicle  3 Yearly competition  1 Amphibious Competition  Compete in Areas:  Design Performance  Design Presentation

 Increase the overall competitiveness of the RIT Baja SAE Team  Form a mutually beneficial relationship between the RIT Baja SAE Team and the KGCOE MSD Program  Roadmap the development of cutting edge technologies that will provide an engaging learning experience and benefit the University’s SAE Teams.

 Leadership in Automotive Innovation  Long Term Project Goals and Focus  Synergizing Academic and Extracurricular Efforts  Benefit from Outside Perspectives  Benefit from Multidisciplinary Designs  Leveraging Professionalism and formality of Senior design process

 Creating Technologies beneficial to other SAE Teams  Aligning with current industry push in drive system development  Aligning with evolution towards integrated electronic controls

Road mapping Group KGCOEDr. Nye Marty Gordon (Baja Advisor) Baja SAE Team Professor Deminco SAE Competition Competitive Goals Educational Goals

Failure Consistent Low Risk Mediocre Performance 4130 Steel Design Failure 6061 Aluminum Design 2008 All previous years 2009 Carbon Fiber Design

Reliable, Low Risk Medium Risk and Innovation High Risk, Highly Innovative, Research and Testing Intensive Initial Design RefinementInitial Design Refinement & Continuation Release Time

 Incremental Benefit  Controlling / Learning from Failure  Reduce Wasted Design Effort  Increase Reliability  Forward Looking Approach  Creating Knowledge Base

Suspension and Traction Event Testing durability and capability of suspension and drive systems University of Southern Florida Cage Cam

BAJA COMPETITION VEHICLE IN 2003 BAJA COMPETITION VEHICLE CURRENT

COMPOSITE SUSPENSION COMPONENTS ALUMINUM FABRICATED SUSPENSION COMPONENTS

ROLLER CHAIN REDUCTION (LATE 80’S -2005) CURRENT PLANETARY/SILENT REDUCTION

 Demand for Higher Performance Level  More Sophisticated Design  Increasing Complexity  Increasing development time Increasing Complexity

 Driver feedback both real time and stored for later analysis.  The R.I.T. data system includes:  3-axis accelerometers  Engine RPM  Wheel speed  GPS  900MHz wireless (20 km range)  SD card slot  Clutch, engine and transmission temperature sensors  Brake and throttle position sensors  USB connectivity  Low oil sensor.

 Graduate Thesis by Aburn Baja SAE team member  Model structural rigidity and driver reactions in simulated crashes and rollovers

TEAM P08221 POSTER

 Freshman-Senior Level Design Competition  Attended by many strong Baja SAE Competitors  Focus on:  Early Introduction to Team Oriented Design Process  Design Presentation  Extemporaneous Scientific Debate

BRAKING BASED TRACTION CONTROL OREGON STATE 2007  Championed both Design and Endurance Race segments of the Competition  Developed in OSU MSD Program

 Customer Meeting  Created Affinity Diagram with Executive Board Goals High Innovation Through Concurrent Design Long Term Development Mutual Benefit Secondary Customer Benefits Risks Team Resource Cost Budgeting Creating Unproductive Relationship Customer Needs Not Met Failure To Communicate

 Vehicle Shielding  Design Improvement  Alternate Material’s  Water  Suspension  Brakes  Drive train  Testing  Team Development  Data Collection  Details  Driver Feedback  Documentation  Manufacturing  Current Electric  Stupid Problems  Interpersonal  Public Relations

Become a Competition Leader Utilize Resources Resolve Intra- Team Issues Gathering and Implementing Knowledge Design Improvement Current System Refinement New Technology Development

Water: Propulsion Hydrodynamics Drive train: Efficiency CVT Hybrid Testing and Data Collection: Driveline Chassis Suspension Active Vehicle Control Systems: Traction Control Driveline Controls

 Center for Integrated Manufacturing Studies  Other SAE Teams  Engineering Classes and Lab usage  Power train System Design  High Performance Vehicle Dynamics  Internal Combustion Engines  General Automotive Option Classes

Week 6Week 7Week 8Week 9Week 10Week 11 Revisit Technical SupportTeam ReturnsBreakout Reconvene and work on pathsPresenting Revisit Advising Meet with team Executive board Work on individual Paths Presentation building Address Team Concerns Gathering Team input Creating Video Resources Team leaves Solidification of Technologies Hammer Down on Roadmap Phase 3Phase 4 Firing Squad

 Interfacing SD Team with Baja Team  Having Senior Design Team understand design task well without significant involvement of team.  Culture and Thinking  Baja Team relies heavily on short term design cycle  Cost Benefit Perception of the Team

 Thus Far, Focus has been on Establishing needs, contacts, and mitigating team boundaries.  Meet with team to revue details of upcoming competition  Future focus is to be on detailed definitions of projects and Project Readiness Packages  Contact Previous Baja Affiliate Road mapping group