ENJJPT SC #68 T-6A Programs Mr. Patrick Frye AFLCMC/WLZ (JPATS) Air Vehicle Lead (Deputy) XX September 2014.

Slides:



Advertisements
Similar presentations
KPI Familiarisation.
Advertisements

1 C-130 Modifications Update Maj Gen Rob Kane SAF/AQQ This briefing is UNCLASSIFIED 12 July 2011.
Introduction to Military Certification Office
Lessons Learned from the 5010 Conversion to take into ICD-10
TRADITIONAL OFFICER VACANCY ANNOUNCEMENT
Supply Chain Management System (SCMS) ICT4D Conference: Accra, Ghana, March 2013 SCMS Overview 1.
DLA's Aviation Supply & Demand Chain Manager Defense Supply Center Richmond Aviation Engineering Reliability and Sustainment Programs Defense Logistics.
Delivering Performance Results to the Customer Maxwell AFB a Case Study in Successful Performance Based Acquisition.
Ogden Air Logistics Center BE AMERICA’S BEST 1 OO-ALC Pilot Status Update UID Off-Site 23 Feb 05 OO-ALC/MG.
JHP Case Study Introduction 1 UNCLASSIFIED notional data for notional program.
Recognition of Scope Change in the IPMR July 2013 NAVY CEVM.
O F F I C E O F T H E C H I E F T E C H N O L O G I S T Dr. Laguduva Kubendran (LK) Program Executive, Flight Opportunities Program NASA Headquarters.
WELCOME! Public Informational Meeting November 12, 2003 Auxiliary Field #1 Joint Land Use Study.
SOFIA SSSC Program Status Robert Meyer Program Manager September 29, 2009.
The program work breakdown structure (WBS) establishes the essential
Airbus flight control system  The organisation of the Airbus A330/340 flight control system 1Airbus FCS Overview.
ENJJPT SC #68 T-38 Programs Mr. Greg Brown Deputy Branch Chief MAPA Branch September 2014.
Civil Air Patrol CITIZENS SERVING COMMUNITIES Flight Release Officer Refresher Training Course.
Unit I Module 2 - NAVAIR RCM Policy and Organization
Definitions, Goals and Objectives
Presented to: Aerospace Control and Guidance Systems Committee By: Stan Pszczolkowski, Manager, System Analysis Team Date: October 11, 2006 Federal Aviation.
TDAW103A Practical Training Balance Mark Christie workplace project Cluster workplace project Use training packages.
Special Evening Session: The Business of NASA Research August 22, 2006 Evening Session.
Integrity  Service  Excellence Maj Gen P. David Gillett, Jr. OC-ALC/CC 3 Sep 09 Air Force Materiel Command Oklahoma City – Air Logistics Center Technology.
DEVELOPING REGIONAL SERVICE PLANS: AN OVERVIEW EAST TEXAS MEETING October 6, 2005.
FORUM Agenda 1. Fleet Vehicle Utilization Review -- Sam 2. Fleet On-line Reports -- Scott 3. Enterprise Rent-A-Car Contract Changes -- Sam 4. Already Replaced.
How Aircraft Operators Can Benefit from PHM Techniques Big Sky - Montana 2012 IEEE Aerospace Conference Leonardo Ramos Rodrigues EMBRAER S.A., São José.
Committee on Refinery Equipment November 2010 Update to the Refining Subcommittee Michael Lubcyik, Chevron Energy & Technology Company, Chair, CRE.
Ed Hardick Director of Marketing/ Product Support.
UNITED NATIONS STAND-BY ARRANGEMENTS SYSTEM (UNSAS)
International Data Link Symposium st October 2003, Newbury, UK FEASIBILITY STUDY FOR CIVIL AVIATION DATA LINK FOR ADS-B BASED ON MIDS / LINK16 Bob.
Functional Check Flight Symposium Andre Tousignant C.I.M. Director Air Safety Investigation Office (ASIO) Bombardier Aerospace Vancouver Feb 8, 2011.
AST Research and Development Activities COMSTAC Launch Operations and Support Working Group Chuck Larsen October 24, 2006 Federal Aviation Administration.
Air Education and Training Command I n t e g r i t y - S e r v i c e - E x c e l l e n c e Replenishing the Combat Capability of America’s Air Force WIDE.
NextGen & ADS-B Presentation to Aviation Accreditation Board International (AABI) Industry/Educator Forum July 18, 2013 Kansas City, MO.
Managing Rotorcraft Safety During Frequently Performed Unique Missions September 28, 2005 AHS International Helicopter Safety Symposium 2005 Philip G.
1 PMA-273 T45 Contractor Logistics Support April 2004.
Regional Planning Meetings 2005 Capital Improvement Program Overview Presented by Steven Cooks, Airport Planner.
Civil Air Patrol Command Council Meeting 1-2 March 2013 Arlington, VA.
C-17 Program Description Three Contracts (All Solicited prior to 1 Jan 04) – Development – Production – Sustainment 180 Aircraft by Aug 08/126 currently.
NOAA’s Fleet of Ships Operations and Replacement Challenges
MILS Migration for Foreign Military Sales UID/MILS Workshop 9-10 March 2004 Kathy Robinson
Utility Financial Management AWWA Intermountain Section Leadership Forum Session Two November 10, 2015.
ENJJPT SC #69 T-6A Programs Mr. Patrick Frye AFLCMC/WLZ (JPATS) 17 February 2015.
Performance-Based Logistics Affordability: Can We Afford Categorical Conversion to Performance- Based Acquisition? Warner Robins Air Logistics Center Andrew.
1 We Train the World Air Force Financial Update to SC70 Air Force Security Assistance Training Mr. Rick Jellison Director of Financial Management.
Steering Committee 69 “Training and Developing Tomorrow’s NATO Air Warriors Today!” FY15 Wing Commander Projects Colonel Gregory Keeton Wing Commander.
Office of Space Flight Spaceport and Range Technology Development Initiative Al Sofge NASA Headquarters May 15, 2001.
Incident Based Automation Project Update Logistics Meeting March 16, 2005.
1 Chapter 8 karvaytMélKMerag nig kareFVIr)aykarN_ nig karbiTKMerag Project Evaluation, Reporting, and Termination.
Presented to: By: Date: Federal Aviation Administration Pending FAA Reauthorization Impact on Foreign Repair Stations Maintenance Information Session 2008.
Definitions, Goals and Objectives Embry-Riddle Aeronautical University Chapter 3.
U NIQUE ID ENTIFICATION (UID) Air Force UID Overview 17 Nov 04 Col Loraine Simard AFMC/LGY Mr. Thomas Dills HQ AF/ILI
(Enhanced) Traffic Collision Avoidance System
ENJJPT SC #71 T-38 Programs Mr. Ryan Bruce T-38 Program Office March 2016.
AMI System Status Report December 11, Project Objectives Selection, p rocurement and implementation of an AMI System that: Provides automated meter.
ENJJPT SC #71 T-38 Programs Mr. Ryan Bruce T-38 Program Office March 2016.
Chapter 8. Electrical Systems
T45 Contractor Logistics Support
SER/Florida Wing 2002 National Check Pilot Standardization Course
Failure of Process / Failure of Mission
CAD/PAD Development Process
COUNTERFEIT PARTS DEFINED RISK FACTORS HISTORY WHAT IS BEING DONE
ENJJPT SC #69 T-38 Programs Mr. Ryan Bruce T-38 Programs Chief
ENJJPT SC #71 T-6A Programs
New Mexico Business Portal Closeout Department of Information Technology Estevan Lujan, Acting Cabinet Secretary September 26, 2018.
PCC Project Status Electronic Poll Book Pilot Project Partnerships
P25 Digital Statewide Public Safety Radio System Initiation Department of Information Technology Estevan Lujan, Acting Cabinet Secretary Michael Rohrbacher,
GENERAL SERVICES DEPARTMENT Facilities Management Division PROOF –NM (Process Reengineering & Optimization of O&M Functions for New Mexico) Phase II.
2019 CAP SUMMER CONFERENCE Aircraft Management
Presentation transcript:

ENJJPT SC #68 T-6A Programs Mr. Patrick Frye AFLCMC/WLZ (JPATS) Air Vehicle Lead (Deputy) XX September 2014

Overview Funding summary T-6 Current & Future Mod’s 2

SC68 Funding Timeline (FY) Summary Wing Stringer Drain Hole and ATD Visual Systems efforts are complete A new cost estimate for ADS-B Out is in work 3

T-6 Mod’s Wing stringer drain hole rework – 5 areas in wing require cold working to ensure structural durability and negate extensive recurring inspections – Not a common maintenance task/effort: depot field team will be used to accomplish rework – ENJJPT PO, Annex 10, “Logistics Essential”, per HQ AFMC – Sheppard retrofits: Completed March 14 – Estimated cost: $102K 4

Future T-6 Mod’s 1.Automatic Dependant Surveillance - Broadcast: (ADS-B) Out – Modify aircraft and ATDs to meet FAA mandated National Airspace requirements by 1 Jan – ENJJPT PO, Annex 10, “Mission Essential”, per HQ AFMC – Earliest anticipated Sheppard installation: FY18 – Estimated cost: $15.0M total Cost update in work pending project strategy 5 AETC FY16 POM strategy for ADS-B as a separate project versus combined as AVI suite approach. New cost estimate expected by early fall 2014.

Future T-6 Mod’s (cont.) 2.CFIS (Canopy Fracture Initiation System) Ballistic – Modify aircraft due to obsolescence of current laser/flash initiated system. Replace with military certified ballistic system – ENJJPT PO, Annex 10, “Logistics Essential”, per HQ AFMC – Earliest anticipated Sheppard installation: FY16 Retrofit at next scheduled R&R – Estimated cost: $349K 6

Future T-6 Mod’s (cont.) 3.Wing Rib one repair/correction – Cracking discovered on top portion of center wing rib (rib one) – Repair/correction is still TBD, but will be depot level effort – ENJJPT PO, Annex 10, “Safety of Flight”, per HQ AFMC – Earliest anticipated Sheppard work: TBD – Estimated cost: TBD 7 Cost estimate expected by early fall 2014.

Future T-6 Mod’s (cont.) 4. ATD DAS II - Control loading Retrofit Commercial Off-The-Shelf (COTS) elements of legacy platforms to the Electronic Control Loading System (ECLS) and Flight Deck I/O of the JPATS ATDs are obsolete and have limited supportability Legacy IP ‑ GSNet cards, 429 Cards, and power supplies are out of production and cannot be supplied by any vendor Projections based on current failure rates indicate that ATDs will start becoming irreparable in This will cause the number of ATDs for student training to decrease until insufficient numbers of ATDs are available to support Program Flying Training throughput mandated by AETC and CNATRA. – Estimated cost for Shepperd AFB: 1.2M 8

Future T-6 Mod’s (cont.) ATD DAS II - Control loading Retrofit (cont.) 9 ??? Next Generation of COTS Control Loading Legacy DRI system Current Production DAS II System

Future T-6 Mod’s (cont.) 5. Rudder Binding Repair Over two dozen events to date -- similar failure mode (jamming/binding rudder controls) Problem self-corrects on landing No mishaps attributed to this condition Number of incidents occurring at an increasing rate Fault tree aggressively investigated by USG and Contractor Determine root cause ECD – Unknown (maximum effort underway) Estimated cost of repair – Unknown as root cause and repair method TBD 10

Summary Cost figures presented are subject to change due to program delays, aircraft beddown changes, DoD funding adjustments, efficiencies not determined, contract restructuring and re-pricing, or other unforeseen circumstances. This info is provided for long range budget planning purposes and should not be interpreted as a final cost estimate. Our goal is to ensure NATO’s future fighter pilot training needs are met and ENJJPT, with new advanced training systems, will continue to produce the world’s best pilots. 11

Recommendation Steering Committee approve funding plan 12