Transportation Management Plan Overview Module 3.

Slides:



Advertisements
Similar presentations
Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated.
Advertisements

1 1 Federal Highway Administration, USDOT Work Zone Mobility and Safety Notice of Proposed Rulemaking (NPRM) proposed changes to 23 CFR 630 Subpart J.
TDOT’s WORK ZONE SAFETY AND MOBILITY MANUAL Use & Implementation of Transportation Management Plan AASHTO Subcommittee on Design Dyan C. Damron, P.E. –
Traffic Control Plan Development Course
Scoping in the EIA process Proposal Identification Screening
Alternative Project Delivery
November, 2008 Montana Department of Transportation Transportation Management Plans.
LANE CLOSURE CHARTS CHART DEVELOPMENT AND DELAY DAMAGES (District 3) OBJECTIVE To become familiar with the lane closure chart development process.
TMP Development Module 7. What is a TMP? Set of coordinated transportation management strategies applied to manage work zone impacts of the project Scaleable.
ENVIRONMENTAL MANAGEMENT PLAN
PAVEMENT MANAGEMENT SYSTEMS OVERVIEW Lecture 2. n Provide a historical perspective of the evolution of PMS over the last 20 years n Describe the basic.
Environmental Justice: Policies, Guidance, and Answers to Frequently Asked Questions FTA Region VII Civil Rights Training.
Transportation Management Plan Overview. TMP Overview2 Is that the impression people have?
Purpose of the Standards
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users SAFETEA-LU Key Safety Provisions Federal Highway Administration.
Traffic Incident Management – a Strategic Focus Inspector Peter Baird National Adviser: Policy and Legislation: Road Policing.
Office of Traffic, Safety and Technology Module 6 Specifications and Special Provisions Traffic Control Plan Development Course.
Determining Innovative Contracting Methods to Reduce User Costs Stuart Thompson Utah Technology Transfer Center.
Intersection & Interchange Geometrics (IIG) Innovative Design Considerations for All Users Module 8 Intersection- Interchange Evaluation Process.
Best Practices Related to Research Problem Identification, Scoping, and Programming: A Researcher’s View Martin Pietrucha, Director The Thomas D. Larson.
Old Policy – which no one ever seem to have heard of.
Economic Analysis: Applications to Work Zones March 25, 2004.
Basics of OHSAS Occupational Health & Safety Management System
Intersection Control Evaluation (ICE). Outline  Background  ICE Process  Impacts  Current Status.
RCPG Project Update 2013 Whole Community Conference November 22, 2013.
TMP Evaluation and Performance Module 9. Assessing TMP Performance2 Module Outline Why Assess TMP Performance? Performance Assessment – Project and Program.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
Overview of the Work Zone Safety and Mobility Rule Module 1.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
1 Federal Highway Administration, USDOT Implementing the Rule on Work Zone Safety and Mobility.
Transportation Management Plan Overview. TMP Overview2 Is that the impression people have?
WORK ZONE SAFETY & MOBILITY Meeting the Federal Rule Jim Allen Safety Implementation Engineer ATSSA Illinois Chapter Meeting.
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
1 Approaches for Integrating Systems Engineering into Your Agency’s Business Practices Presented by: Amy Tang McElwain August 2, 2007 Talking Technology.
Rule on Work Zone Safety and Mobility SHA’s Road to Compliance Maryland State Highway Administration Office of Traffic and Safety Talking OperationsJawad.
C ONSIDERING L ARGE T RUCKS IN THE D EVELOPMENT OF T RAFFIC M ANAGEMENT P LANS Neil Boudreau, MassDOT State Traffic Engineer April 13, 2015.
Presentation Topics Oregon Transportation Investment Acts (OTIA) Goals of Statewide Traffic Mobility Program Focus of ODOT’s Mobility Approaches Results.
NCHRP Study (30) Performance Measures for Context Sensitive Solutions – A Guidebook for State DOTs As presented by Sally Oldham at the 2005 Midwest.
Working Together to Save Lives An Introduction to the FHWA Safety Program for FHWA’s Safety Partners.
Office of Traffic, Safety and Technology Module 4 Work Zone Applications Traffic Control Plan Development Course.
Managing Travel for Planned Special Events: What, Why, & Benefits Walt Dunn, P.E. Dunn Engineering Associates, P.C. Talking Operations Seminar January.
5-1 Lesson 5 | Common Issues & Challenges. Describe how RSAs address project schedule (time), project cost, and agency liability concerns. Explain the.
Introduction Session 01 Matakuliah: S0753 – Teknik Jalan Raya Tahun: 2009.
Materials, Pavements & Transportation Operations CONCEPTS FOR ENHANCING THE EFFECTIVENESS OF TRAFFIC CONTROL PLANS Stuart Anderson Gerald Ullman Making.
Work Zone Rule Virtual Workshop – Rule State of the Practice Overview.
1 Federal Highway Administration Work Zone Safety and Mobility Rule Implementation of Updates to 23 CFR Section 630, Subpart J Presented by Tracy Scriba.
1 Federal Highway Administration, USDOT The Final Rule on Work Zone Safety and Mobility Updates to 23 CFR Section 630, Subpart J Presented by Tracy Scriba,
Implementation: Results from the Using Your Regional ITS Architecture Peer Exchange Network Workshop Mac Lister FHWA Resource Center ITS America Annual.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
Public Involvement. Why? Who Cares? –What we do matters to the public –Effective PI enables proactive input and enhances the decision- making process.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
1 Implementation of Transportation Management Plans (TMPs) Presented by Tracy Scriba Federal Highway Administration AASHTO Design Meeting July 15, 2008.
Work Zone Safety and Mobility Transportation Management Plans Jason Gutting, P.E. Michigan Department of Transportation.
Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
What is project management?
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
Preparation Plan. Objectives Describe the role and importance of a preparation plan. Describe the key contents of a preparation plan. Identify and discuss.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
0 Freight Activities: Year in Review Dec. 12 th 2015.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Project Management PTM721S
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Federal Highway Administration, USDOT Work Zone Mobility and Safety
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Kathy Harvey, P.E. State Design Engineer Missouri DOT
Project Management Process Groups
WisTMP 2.0 Update Andy Heidtke, PE Statewide Work Zone Design Engineer
Presentation transcript:

Transportation Management Plan Overview Module 3

TMP Overview2 Module Outline TMPs and the WZ Rule What is a TMP? Why TMPs? When to Develop TMPs State-of-the-Practice  Tools  Tips

TMP Overview3 TMP Beginnings Idea for TMP provision in WZ Rule came from Caltrans  Caltrans began requiring TMPs in 2000 for all planned activities on the State highway system  Implementation of TMPs in CA has helped to significantly reduce delays in work zones In Caltrans District 7, on the I-10 Long-Life Pavement Project, the TMP helped reduce traffic demand by an estimated 57 percent, queue lengths to 2 miles from the originally projected 44 miles, and projected delays from an estimated 1,000,000 to 16,000 total vehicle hours of delay.

TMP Overview4 TMPs and the WZ S&M Rule Requires development and implementation of TMPs for all Federal Aid highway projects Required content depends on significance  Must always include a Temporary Traffic Control (TTC) Plan  For significant projects, TMPs must also have: Traffic operations (TO) component Public information and outreach (PI) component In brief, a significant project is one that the agency expects will cause a relatively high level of disruption.

TMP Overview5 TMPs and the WZ Rule (cont.) Agencies should coordinate with appropriate stakeholders in developing a TMP Provisions for a TMP shall be in the project's Plans, Specifications, and Estimates (PS&Es) DOT and contractor shall each designate a responsible person for implementing the TMP

TMP Overview6 TMPs and PS&Es PS&Es shall either contain:  All the applicable elements of a DOT- developed TMP, or  Provisions for a contractor to develop a TMP (e.g., for design-build jobs) DOT must approve contractor- developed TMPs DOT must approve contractor-proposed TMP changes

TMP Overview7 Responsible Persons Both the DOT and the contractor are required to designate a responsible person:  At the project-level  Who is appropriately trained  Who has primary responsibility and sufficient authority for implementing the TMP and other safety and mobility aspects of the project

TMP Overview8 What is a TMP? Set of coordinated strategies implemented to manage the WZ impacts of a project Scale-able – projects with more expected impacts may need more analysis and more strategies “TMPs would streamline the process through which road user impacts due to work zones can be properly analyzed and addressed.” - MD SHA Transportation Management Plan

TMP Overview9 TMP vs. TCP TCP – plan for handling traffic through the use of traffic control devices  Once strategy is determined, TCP implements TMP – more comprehensive - incorporating broader issues -  Public awareness  Mobility and safety impacts  Stakeholder involvement If not a “Significant project”, then TMP can equal TCP

TMP Overview10 What is a TMP? DOTs create design documents to show how they are going to build a project The TMP shows how the DOT is going to manage transportation needs during a project With today’s WZ challenges, a TTC plan may not be enough TMPs = a more comprehensive approach to managing WZ safety and mobility

TMP Overview11 TMPs are a Tool Part of overall WZ management Effective WZ management requires: Understanding the likely impacts of a WZ  Safety and Mobility Impacts Choosing a combination of strategies  That will address the impacts for that project Implementing those strategies The TMP outlines all that for a project

TMP Overview12 TMP Strategies to Manage Work Zone Impacts Temporary Traffic Control (TTC) Strategies Public Information (PI) Strategies Transportation Operations (TO) Strategies -Traffic control/design approaches -Traffic control devices -Project coordination, contracting, and innovative construction -Public awareness -Motorist information -Demand management -Corridor/network management -WZ safety management -Traffic/incident management & enforcement

TMP Overview13 Potential TMP Components Introductory material Executive Summary TMP Roles and Responsibilities Project Description Existing and Future Conditions Work Zone Impacts Assessment

TMP Overview14 Potential TMP Components (con’t) Work Zone Traffic Management Strategies  TTC Plan  Traffic Operations Plan  Public Information Campaign TMP Monitoring Requirements Contingency Plans Implementation Costs May be a single document, or several documents/plans compiled together

TMP Overview15 Example: Wisconsin TMP Components Type 1  Traffic Control Plan  Public Information and Outreach Type 2, 3, 4  Traffic Control Plan  Public Information and Outreach  Transportation Operations  Incident Management

TMP Overview16 Example: Michigan TMP Template Table of Contents: Executive Summary Temporary Traffic Control Plan (TTCP) Transportation Operations Plan (TOP) Public Information Plan (PIP) Delay Calculation Details Alternative Traffic Control Vicinity Map or Location Diagram

TMP Overview17 Michigan TMP Executive Summary Basic description - Location, work type Specific Project Data:  Letting Date  Anticipated Project Duration (Construction Start Date and Completion Date)  Existing Lane Widths  Existing Paved Shoulder Widths  Existing Aggregate Shoulder Widths  Threshold Criteria Which criteria were exceeded ? How was delay calculated? What is the source of traffic volumes?  Facility Details (e.g., ADT, lanes)  Crash Analysis and Safety Review

TMP Overview18 TMP Formats TMPs need to be documented Options include:  Single document with all included material  Brief document with summaries of analysis results and decisions, where the full documentation is in the project files or similar  Powerpoint format has been used  Others? Scope, content, level of detail may vary based on DOT policy and impacts

TMP Overview19 Why TMPs? WZ management is increasingly complex  Increasing traffic volumes using the same roads that agencies need to maintain and rehabilitate  Requires traffic management efforts beyond TTC plans Key issues:  Safety  Mobility  Constructability Objective: Achieve constructability without compromising safety and mobility

TMP Overview20 Importance of a TMP What are the benefits of having a well thought-out approach to managing traffic during a construction project? Consider your stakeholders:  Contractors  Motorists  Property owners  Project owners  Businesses  Environment  Event organizers, etc.

Why TMPs?

TMP Overview22 Is that the impression people have?

TMP Overview23 Why TMPs? – Key Benefits A well-planned method for managing traffic flow during construction can: Address safety and mobility impacts of work zones at corridor and network levels Promote efficient and effective construction phasing and staging, minimize contract duration, and control costs Improve safety for workers and road users Minimize traffic and mobility impacts of a work zone

TMP Overview24 Why TMPs? – Key Benefits (cont.) A well-planned method for managing traffic flow during construction can: Minimize:  Circulation, access, and mobility impacts to local communities and businesses  Complaints from road users, businesses, and communities Improve:  Intra- and inter-agency coordination  Improve public awareness

TMP Overview25 Why TMPs? – Key Benefits (cont.) Earlier assessment of work zone impacts  Can lead to reduced project costs Better documentation of analysis and mitigation of impacts Better coordination and scheduling of projects More basis for reviewing MOT changes requested by the contractor

TMP Overview26 TMPs Lead to Satisfied Drivers In RI, the number of customer complaints about roadwork has decreased In MI, customers have been calling with positive comments about work zones TMP strategies lead to reduced delay and overall impacts to drivers.

TMP Overview27 TMP Development Process (from Developing and Implementing TMPs for Work Zones)

TMP Overview28 When is a TMP Developed? TMP development should begin during systems planning and progress through design Conducting TMP analyses early in project development helps ensure:  Systems planning and preliminary engineering: TMP development and implementation costs included in the project budget  Design: Agencies consider WZ impacts in evaluation and selection of design alternatives  For some projects it may be possible to choose a design alternative that alleviates many WZ impacts Final TMP development occurs during DESIGN

TMP Overview29 Caltrans TMP Development Process

TMP Overview30 Wisconsin TMP Process Process - Work Zone Impacts Assessment - Determine Type of TMP - Prepare Initial TMP - Update, Implement, Monitor - Evaluate After Project

TMP Overview31 During Design… Final assessment of WZ impacts is done, which should affect the choice of:  Best construction/staging option(s)  Most suitable design and contracting approach  Most appropriate WZ traffic management strategies

State-of-the-Practice, Tools, and Tips

TMP Overview33 TMP Development and Implementation WZ Self Assessment Most agencies (94%) had a policy for developing TMPs to help manage the WZ impacts of a project  20% score increase from 2006 to 2007 and 2007 to 2008, 8% in 2009, 3% in 2010 A number of agencies have developed TMP teams and tools

TMP Overview34 Use of TMP Strategies The agency is expanding WZ management beyond traffic safety and control to address mobility through the consideration and use of transportation operations (TO) and public information (PI) strategies.

TMP Overview35 Virginia TMP Requirements VDOT developed a TMP Guide:  Guidelines for acquiring information to develop TMPs  Guidance on each Project Team member's role and responsibilities in the development of TMPs  Covers Project Managers, Roadway Designers, Traffic Engineers, WZ Safety Coordinators, Public Affairs Managers

TMP Overview36 Maryland TMP Development TMP Guidelines WZ Design Checklist MOT Red Flag Summary MOT Red Flag Summary

TMP Overview37 Maryland TMP Development Summary of Work Zone Impact Management Strategies Public Information and Outreach Plans Development Guidance Public Information and Outreach Template

TMP Overview38 Missouri DOT TMP Strategy Database Helps MoDOT staff select WZ management strategies and develop TMPs in a more systematic way Suggests possible appropriate WZ management strategies based on user inputs  Time concerns  Public impact  Location  Traffic flow

TMP Overview39 Missouri DOT TMP Strategies Database The TMP Database is meant to be used at the very beginning of WZ planning to choose the most effective methods from the start, with re-evaluation occurring in the design stage.

TMP Overview40 TMPs Need to Be… Well-thought out Started early in project development Use a multi-disciplinary approach Coordinated with other projects nearby Contain a combination of strategies Fit the expected level of WZ impacts Funded Updated as needed after project award Implemented! Monitored – and adjusted as needed

TMP Overview41 Some Considerations Agency WZ policies  E.g., Maximum WZ queue lengths/delays allowed Lane Closure policies/charts  Specify when lane closures are permitted  Twin Cities Lane Closure Manual Analytical/modeling tools used by the Agency Concerns of stakeholders

TMP Overview42 Key TMP Development Questions Was a TMP developed for the project? Does the TMP consider the expected impacts of the project? Did the agency determine if this is a significant project? Does the TMP contain strategies to manage the identified impacts? Are the strategies reasonable for the level of expected impacts?

TMP Overview43 Key TMP Development Questions (cont.) Were key stakeholders involved? Is implementation of the TMP funded? Has a responsible person been designated for the DOT? Has the DOT approved the TMP per its policies/procedures? Are the relevant parts included in the bid package?

TMP Overview44 TMP Resources WZ Safety and Mobility Rule Web Site  Example TMPs, development resources Developing and Implementing TMPs for Work Zones  Includes a TMP Checklist and matrix of strategies Templates and Samples Online Training – coming in 2011 FHWA