TIB cables and optical fibers ______________________________________________________ 13/7/06 CMS-Pisa group.

Slides:



Advertisements
Similar presentations
Barrel services minimum space allocation in Z ‘Strawman’ layout and Spider… layout WARM and COLD GAP versions Services envelope in Z: In order to reserve.
Advertisements

Find the length of a common internal tangent Play along at home!
MFS, MPO 4/8/12-Fiber connectors and Fan-Out assemblies.
CMS Si-Tracker Project – August 17, Bagby 1 Tracker Cable and Cooling Pipe Mapping  Linda Bagby.
1 Integration issues of FPCCD VTX Yasuhiro Sugimoto May 22,
CPR2 Optical Cables Joey Huston Michigan State University …taking optical signals from edge of CPR/crack detectors to PMT boxes mounted on back of wedges.
Walls crates cables gas chambers electronics CERN adb.
PULLING FIBER OPTIC CABLES
Comparison of cooling services at barrel end Description SCT Barrel Upgrade ID barrel one end one end Total number of staves/rows 176 Staves/rows serviced.
SLHC - WP7 Barrel UPDATE on LAYOUT OF SERVICES AT THE BARREL ENDS OPTO PCBS: Sketches describe options after discussion with Tony Weidberg ( ) Preference.
FTOF – CABLE RUNS Joe Guerra. Terms/Definition FTOF – Forward Time of Flight PCAL – Pre-shower Calorimeter PMT – Photo Multiplier tube Panel 1A – Existing.
7.7: Areas of Circles and Sectors
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD IR Mechanics 7 th B2GM.
Elimination Round 1 1st Annual WSMA Math Bowl May 27, 2011 This test material is copyright © 2011 by the Washington Student Math Association and may not.
Electrical and Optical Cables Installation at P5 What When How H. Breuker
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
Brought to you by powerpointpros.com
Aug/16/05 Su DongSiD Vertexing: Snowmass 05 SiD trk+vtx1 SiD VXD Geometry Update Su Dong SLAC.
HBD FEM the block diagram preamp – FEM cable Status Stuffs need to be decided….
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
ATLAS Tracker Upgrade - Services at Barrel Ends: Scenario where services are routed through existing services channels on cryostat shown on the next 3.
Lesson Objectives 1.You will gain a deeper understanding of the concept of diameter and radius. 2.You will explain the definition of a circle. 3.You will.
Area of a Sector and Length of an arc Ms N. Kearney.
Nov. 8, 2001M. Garcia-Sciveres -- PP0 & Service Panels1 PP0 & Service Panels 1.Introduction 2.Technical Status 3.Goals for 2002.
Hall D Integration Status GlueX Collaboration Meeting Indiana University, Ravi Anumagalla.
S Temple CLRC1 End-cap Mechanics FDR Power Tapes and Optical Fibres Steve Temple, RAL 1 November 2001.
Takeshi Matsuda LC TPC Collaboration March 5, 2008 TPC Endcap Materials.
ATLAS 1 Beam Pipe Support Structure (BPSS) Services Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman, A Smith, LBNL S. Coelli,
TOB meeting, TOB meeting 20 September 2005, Antti Onnela: TOB mechanical integration status and plans n TST-TOB-TIB integration exercise n.
Services in GIF++ A pictorial record of the work HV Cables LV cables DCS cables Signal Cables Ian Crotty 17 Dec 2014.
Circles…… Area and Circumference The Circumference of a Circle Find the circumference of the following circles. C =  d C = 2  r 8 cm cm 2 C =
PHENIX BNL 6/3/2005 Walter Sondheim, Jan Boissevain, Dave Lee PHENIX UPGRADES: SVTX + SI ENDCAPS.
IBL Mock up Mounting procedure V.2 François-Xavier Nuiry Simon Feigl
Sample Dimensions 17mm x 6.5mm x 1mm Inlet Outlet Moving posts Fixed posts Direction of linear motion.
C.BAULT November 9 th  LAYOUT STRAWMAN 07V13 Vs STRAWMAN 07V14  SERVICES AND STRUCTURES INVENTORY  ENVELOPE SERVICES  BARREL SERVICES ROUTING.
Muon barrel cooling G. Aielli and J. Godlewski LS1 TC planning.
Juan Valls - LECC03 Amsterdam 1 Recent System Test Results from the CMS TOB Detector  Introduction  ROD System Test Setup  ROD Electrical and Optical.
The ICD Project Alan L. Stone Louisiana Tech University All D0 Meeting - 7 September 2001.
Any Way you Slice it Shaded regions of circles and other polygons.
1 PST Heater Panel Design The PST heater panels are internally redundant resistive circuits printed onto a Kapton sheet with an aluminum backing. They.
ПЕЧЕНЬ 9. Закладка печени в период эмбрионального развития.
The reading is 7.38 mm. The reading is 7.72 mm.
HCAL Fall meeting, Nov 11-13,`04 HCAL digital optic link and trigger mapping Ianos Schmidt The university of Iowa.
EC: 7 DISK concept Preliminary considerations
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
Circle.
Circles Game.
Service channels between Tracker and PP1
Service channels between Tracker and PP1
Update of MVD services and requests
VELO-installation meeting CERN, January 17, 2006
Connecting to the Internet Through an ISP
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
DCS: Temperature Probes
Cooling pipes and Space for Services
? ENDCAP: Mechanics IFIC-Valencia.
Preparatory Measurement
First of all we will remind some numbers:
Cabling Lengths and Timing
'. \s\s I. '.. '... · \ \ \,, I.
Connecting to the Internet Through an ISP
Services mock-up Full-scale mock-up of one half end-cap.
Finding the Volume of Irregular Shapes
TEC Services Status 30/12/2018 Nick Lumb.
' '· \ ·' ,,,,
Alignment NOtes.
Arc Length, Sector Area, and Inscribed Angles
Connecting to the Internet Through an ISP
Pps Download Center ©
Presentation transcript:

TIB cables and optical fibers ______________________________________________________ 13/7/06 CMS-Pisa group

______________________________________________________ 13/7/06 New sector grouping By Simone Paoletti

Sect. N° Forward side-Services related to: Sect. 2 TIB: L1, CL1: 5 out+ L2, CL1: 5 out; L4, CL1: 7 out + 6 in. TID: D1 R2 half Sect. 3 TIB: L1, CL1: 4 in + L2, CL1: 5 in; L3, CL1: 8 out + 7 in. TID: D2 R2 half Sect. 4 TIB: L1, CL2: 5 in + L2, CL2: 5 out; L4, CL2: 7 out + 6 in. TID: D3 R2 half Sect. 5 TIB: L1, CL2: 5 out + L2, CL2: 4 in. TID: D1 R1 half Sect. 6 TIB: L2,CL3:4 out + L3,CL2:8 in+ 7out + L4, CL3: 6 out + 8 in;TID: D2 R1 half Sect. 7 TIB: L2, CL3: 3 in + L3, CL3: 8 out + 7 in; TID: D3 R1 half Sect. 8 TIB: L1, CL3: 4 in; L2, CL4: 5 out +L4 CL4 :8 out + 6 in. TID: D1 R3 half Sect. 9 TIB: L1, CL3: 5 out + L2, CL4: 5 in. TID: D2 R3 half + D3 R3 half Sect. 11 TIB: L1, CL1: 5 out+ L2, CL1: 5 out; L4, CL1: 7 out + 6 in. TID: D1 R1 half Sect. 12 TIB: L1, CL1: 4 in + L2, CL1: 5 in; L3, CL1: 8 out + 7 in. TID: D2 R1 half Sect. 13 TIB: L1, CL2: 5 in + L2, CL2: 5 out; L4, CL2: 7 out + 6 in. TID: D3 R1 half Sect. 14 TIB: L1, CL2: 5 out + L2, CL2: 4 in. TID: D1 R2 half Sect. 15 TIB: L2,CL3:4 out + L3,CL2:8 in+ 7out + L4, CL3: 6 out + 8 in;TID: D2 R2 half Sect. 16 TIB: L2, CL3: 3 in + L3, CL3: 8 out + 7 in; TID: D3 R2 half Sect. 17 TIB: L1, CL3: 4 in; L2, CL4: 5 out +L4 CL4 :8 out + 6 in. TID: D1 R3 half Sect. 18 TIB: L1, CL3: 5 out + L2, CL4: 5 in. TID: D2 R3 half + D3 R3 half 13/7/06

Sect. N° Analog fiber ( TIB + TID ) Control fiber ( TIB + TID ) MS cable DS MS cable SS Control cable Inlet Pipes Sect (23+6) 4 (3+1) 14 (10+4) 4 (4+0) 4 (3+1) 3 (3+0) Sect (22+6) 4 (3+1) 13 (9+4) 4 (4+0) 4 (3+1) 2 (1+1) Sect (23+6) 4 (3+1) 14 (10+4) 4 (4+0) 4 (3+1) 3 (3+0) Sect (14+6) 3 (2+1) 13 (9+4) 03 (2+1) 1 (0+1) Sect (21+6) 4 (3+1) 8 (4+4) 8 (8+0) 4 (3+1) 0 (0+0) Sect (13+6) 3 (2+1) 7 (3+4) 4 (4+0) 3 (2+1) 3 (3+0) Sect (21+4) 4 (3+1) 9 (9+0) 6 (4+2) 4 (3+1) 5 (4+1) Sect (16+8) 4 (2+2) 10 (10+0) 4 (0+4) 4 (2+2) 1 (0+1) Sect (23+6) 4 (3+1) 14 (10+4) 4 (4+0) 4 (3+1) 3 (3+0) Sect (22+6) 4 (3+1) 13 (9+4) 4 (4+0) 4 (3+1) 2 (1+1) Sect (23+6) 4 (3+1) 14 (10+4) 4 (4+0) 4 (3+1) 3 (3+0) Sect (14+6) 3 (2+1) 13 (9+4) 03 (2+1) 1 (0+1) Sect (21+6) 4 (3+1) 8 (4+4) 8 (8+0) 4 (3+1) 0 (0+0) Sect (13+6) 3 (2+1) 7 (3+4) 4 (4+0) 3 (2+1) 3 (3+0) Sect (21+4) 4 (3+1) 9 (9+0) 6 (4+2) 4 (3+1) 5 (4+1) Sect (16+8) 4 (2+2) 10 (10+0) 4 (0+4) 4 (2+2) 1 (0+1) Total /7/06

______________________________________________________ 12/3/04 Ribbon Length (1) The optical connectors are placed at three different radii: R1 = 284,5, R2 = 358,5, R3 = 432,5. Ribbons must arrive at radius 1170, : D R1 = 885,5,  R2 = 811,5,  R3 = 737,5. Then run over the endcap up to Z = 2600,  Z = 1434 ( = 2600 – 1166) And over the Barrel for a overall length of 3150 then we can add 100 mm e 200 mm of slack at connector and PP1 position. TOTAL: L1 = 5769,5, L2 = 5695,5, L3 = 5621,5 In some sector the routing of the ribbon are not aligned with the center of the sector and we have to add an extra R x Df length considering that this Df must be done outside the service panel ( for safety we can consider R = 1170 mm)

______________________________________________________ 20/4/04 Ribbon Length (2) Sector N° Df Length 6 & 58,5°173,5 mm 715,0°306 mm

______________________________________________________ 13/7/06 Ribbon Length (3) The different lengths are : Sector 2,3,4,8,9 Sector 6,5 Sector 7 R R R Control ribbon are positioned at R average : 484 → L = 5720 N° control ribbon Forward : 76 ( needed 60)