Status of mTCA Stripline BPM Development June 4-5, 2012 Dan Van Winkle for BPM team: Sonya Hoobler, Tom Himel, Jeff Olsen, Steve Smith, Till Straumann,

Slides:



Advertisements
Similar presentations
Stephanie Allison LCLS Event System 14 June LCLS Event System Outline HW Block Diagram Timing Requirements Time Lines EVG.
Advertisements

26-Sep-11 1 New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments.
SLAC uTCA review 4-5 June 2012 Anders J Johansson Lund University Some slides from Zheqiao Geng and Tom Himel)
Update of EXT Stripline BPM Electronics with LCLS-style Digital BPM Processors Glen White, with slides by Steve Smith 15 December 2009 ATF2.
HPS MPS OVERVIEW Dan Sexton & the Safety Systems Group JLAB 1.
Linac4 BPM and Phase Pickup L. Søby08/ LINAC4 Beam Position, Phase and intensity Pick-ups.
Dayle Kotturi and Stephanie Allison Facility Advisory Committee Meeting April 20-21,
S. Smith LCLS Facility Advisory April 16, BPMs and Toroids Facility Advisory Committee April 16, 2007 System overview.
RPC Electronics Status Overall system TDC –Digitizing frequency issue (determine the bin size of the TDC value) Discriminator test result Trigger module.
Tom Himel Linac Controls Upgrade Nov SLAC National Accelerator Laboratory 1 Linac Controls Upgrade Status Tom Himel.
CDF Silicon Workshop th May 2006 New BLM & BLM electronics Jose E. Garcia, Jennifer Gimmell, Ulrich Husemann.
1 Tom Himel 1 Status of the Linac Controls Upgrade LCLS FAC review Status of the Linac Controls Upgrade Tom Himel June 8, 2009.
Ron Johnson Beam Position October 29-31, Beam Position Monitors FAC Review October 29-31, 2007 Stripline BPM.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Dayle Kotturi Facility Advisory Committee Meeting October 12, 2004 Injector/Linac Controls An overview of the status of each of.
Patrick Krejcik LCLS November 11-12, 2008 SLAC National Accelerator Laboratory 1 Post-commissioning Controls Enhancements.
Overview of the LLRF Activities at SLAC
Status of MicroTCA LLRF Development Zheqiao Geng On behalf of the LLRF AIP team 6/4/2012.
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
LCLS-II Injector LLRF System – MicroTCA Based Design Zheqiao Geng 6/4/2012.
The planned new system Tom Himel Dec 1, Outline Controls has multiple related projects Decided to use mainly µTCA architecture Description of.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
Introduction to mTCA and LLRF review Tom Himel June 4,
CRIO as a hardware platform for Machine Protection. W. Blokland S. Zhukov.
LSST Electronics Review – BNL, January LSST Electronics Review BNL January Power & Voltage Plan R. Van Berg Electronics Mini-Review.
Status of ATF2 Cavity BPM Project Sep 29, 2005 Project Scope: Instrument both couplers ATF2 cavity BPM’s (35) Produce prototype for December cavity test.
BPMs and HOM-BPMs for the XFEL Linac N. Baboi for the BPM and the HOM teams (DESY, CEA-Saclay, SLAC, FNAL, Cockroft/Daresbury) XFEL Linac Review Meeting,
John Dusatko 2012 EPICS Timing Workshop The SLAC Timing System April 24, The Accelerator Timing System at SLAC: Experiences, Ideas & Future Plans.
LCLS-II Linac LLRF Control System – L2, L3 Zheqiao Geng Preliminary Design Review May 7, 2012.
Ethernet Based Embedded IOC for FEL Control Systems J. Yan, D. Sexton, Al Grippo, W. Moore, and K. Jordan ICALEPCS 2007 October 19, 2007 Knoxville Convention.
Zheqiao Geng 6/5/2012 Plan for Evaluating LLRF Deployment Solution at LCLS-II.
Figure 2 gives an overview of the hardware components of the upgraded Main Injector BPM system. The figure shows 2 signal channels which produce one position.
BI day 2011 T Bogey CERN BE/BI. Overview to the TTpos system Proposed technical solution Performance of the system Lab test Beam test Planning for 2012.
Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 LLRF Outline System Concept Review Requirements.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
MTCA use in Linac to replace CAMAC Tom Himel June 4,
The ATF Damping Ring BPM Upgrade Nathan Eddy, Eliana Gianfelice-Wendt Fermilab for the ATF Damping Ring BPM Team.
BI day /12/00 1 PIPOS Project (TT2 & TT10) (Beam performances) G. Vismara  Present situation  Proposals  Beam parameters  Technical solution.
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
1 The Cost & Schedule to Accomplish the Transition Proposed SLAC Controls Upgrade December 1, 2010 Ray Larsen.
Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA UNCLASSIFIED LANSCE Beam Diagnostics R&D Presented by James Sedillo.
18 December 2007 ATF Damping Ring BPM System Upgrade Joe Frisch, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, Mark Woodley (SLAC) Charlie Briegel,
The recent history and current state of the linac control system Tom Himel Dec 1,
BIC Issues Alan Fisher PEP-II Run-4 Post-Mortem Workshop 2004 August 4–5.
ATF DR BPM Upgrade Janice Nelson, Doug McCormick, Justin May, Andrei Seryi, Tonee Smith, Mark Woodley.
Robert C. Sass Sheng Peng LCLS Upgrade Review June IOC Requirements 1 LCLS Phase I Upgrade; IOC CAMAC Support Requirements Robert C. Sass Sheng.
Development of a High Resolution Cavity BPM for the CLIC Main Beam
Tevatron Beam Position Monitor Upgrade Stephen Wolbers (for the Tevatron BPM Upgrade Project) PAC05, Knoxville, TN May 16-20, 2005.
LCLS Digital BPM Processor for ATF2 Extraction Line BPMs Steve Smith 26 August 2009.
DAQ 1000 Tonko Ljubicic, Mike LeVine, Bob Scheetz, John Hammond, Danny Padrazo, Fred Bieser, Jeff Landgraf.
S. Smith LCLS Facility Advisory October 12, Beam Position Monitors Facility Advisory Committee October 12, 2006.
SLAC to the Future Dan Van Winkle, Joe Frisch, Bo Hong, Jim Sebek, Charlie Xu, Andrew Young LLRF Activities at SLAC.
LEReC BPM Status P. Cernigla, R. Hulsart, R. Michnoff, Z. Sorrell June 2, 2016.
Status of CEPC Beam Instrumentation Study Ma Huizhou On behalf of CEPC BI Group Beijing, China
SLAC I&C Division / EE Department
The SLAC Instrumentation and Control Platform
SNS Status Report Karen S. White 10/15/08.
SLC-Aware IOC LCLS Collaboration Jan 26, 2005
Ewald Effinger, Bernd Dehning
New xTCA Developments at SLAC
Timing and Event System S. Allison, M. Browne, B. Dalesio, J
LLRF and Beam-based Longitudinal Feedback Readiness
ERL BPM System Mike Billing, Mark Palmer
Lehman 2000 Project Timeline
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
LLRF Control System Outline Scope Requirements Options considered
Low Level RF Design Outline Scope Requirements Options considered
SuperB Linac VME Beam Position Monitor
Undulator Cavity BPM Status
Electronics, motion control and verification
Presentation transcript:

Status of mTCA Stripline BPM Development June 4-5, 2012 Dan Van Winkle for BPM team: Sonya Hoobler, Tom Himel, Jeff Olsen, Steve Smith, Till Straumann, Ernest Williams, Chuck Yee, Andrew Young

2 Outline Background –Motivation System Description –Physics Requirements –Proposed new design –Cost comparisons –Technical Overview Current Status Schedule Risks –mTCA –Pizza Box –VME/AFE Next Steps mTCA BPM Development June 4-5, 2012

3 Background mTCA BPM Development June 4-5, 2012

4 Background 4 Flavors of BPMs mTCA BPM Development June 4-5, 2012 LCLS Pizza Box FACET – LINAC CAMAC FACET – Sector 20 XTA

5 Background Assumptions –LCLS II will use existing BPMs whenever possible (CAMAC) –91 new BPMs will be necessary for LCLS II. These will be some type of “new” electronics. –The existing linac BPMs will eventually need to be upgraded to something more sensitive (exactly like LCLS I). –This development is targeted at both the new BPMs for LCLS II and the upgrading of the existing BPM electronics throughout the linac. mTCA BPM Development June 4-5, 2012

6 Why not just clone the LINAC (CAMAC) BPM electronics? (Motivation) CAMAC technology is obsolete and becoming more difficult to maintain –Obsolete Parts –PDR Specs can not be met (this was demonstrated in LCLS I) –Technical expertise is disappearing –EPICS incompatibility mTCA BPM Development June 4-5, 2012

7 Why not just clone the LCLS-I stripline BPM electronics? (more Motivation) Pizza Box solution was a quickly thrown together solution used to replace a COTS solution that did not work out. It worked so well that it is now used throughout LCLS I. Unfortunately: Coldfire CPU in pizza box is too wimpy to do full job of IOC. Hence special private network link to a VME IOC to transfer data for processing. –Requires VME crate/CPU/EVR per 4 BPMs Takes multiple people each with special expertise to put in a new BPM or even to repair an existing one. Requires a lot of network equipment and cables. mTCA BPM Development June 4-5, 2012

8 System Description mTCA BPM Development June 4-5, 2012

9 Physics Requirements mTCA BPM Development June 4-5, Differences from LCLS I 10pC Charge 2 Bunches

10 Design Proposal A new designed based upon the emerging technology of mTCA was proposed. –New design can be used for rest of LCLS-II (even the injector if we get the design done in time) –New Design at 250 Msamp/sec (300 MHz center frequency) means existing cable plant can be used (for existing LINAC BPMs. (~500k$ savings) –Allows for mix and match of systems (LLRF/BPMs) in same shelf (theoretically sharing infrastructure costs) mTCA BPM Development June 4-5, 2012

11 Deliverables Design build and install one crate of 3 BPMs in a sector (1 st 20 sectors) –We expect to use new 250 Msamp/sec ADC or potential undersample at 125 Msamp/sec using Struck Board –The analog front end electronics will be a new design, same topology as pizza box front end (but higher in frequency) –The necessary software will be done to integrate the BPMs into the EPICS control system Mass production for 10 sectors (LCLS II) will be a separate AIP funded outside LCLS II core project. mTCA BPM Development June 4-5, 2012

12 Cost Comparisons mTCA BPM Development June 4-5, 2012 Cost Comparisons Between Systems Micro TCA LCLS - I XTA Hardware Labor Estimate960 Hardware Labor Estimate2880 Hardware Labor Estimate1920 Digitizer4250 Pizza Box3598 Digitizer2200 RTM (AFE)1500 AFE2100 Total6710 Total6478 Total6220 Crate 9 BPMs1BPM 9 BPMs1BPM Shelf5300 Crate (21 SLOT)8495 Crate (21 SLOT)8495 Crate (4-slot) 3885 MCH2300 CPU4125 CPU4125 CPU2125 EVR2700 EVR2700 Power Module1000 EVR Fanout550 EVR Fanout550 EVR3300 Network Switch (x2)360 Network Switch(x2)360 Power Switch600 Power Switch600 Total14025 Total Total Max Number of BPM/Shelf9 9 9 Max Cost per BPM (1BPM)$20, $18, $18, Min Cost per BPM (9 BPM)$8, $8, $8,090.00

13 Requirements Similar Analog Front end at new frequency (300 MHz) (next slide) Expect slightly better dynamic range to accommodate new 10 pC charge limit for LCLS II Initial operation will use internal clock. For multi-bunch operation, phase synchronous ADC clock will be required to extract bunch phase information (238 MHz). mTCA BPM Development June 4-5, 2012

MHz vs. 140 MHz mTCA BPM Development June 4-5, 2012 By using 300 MHz instead of 140 MHz gain 4.6 dB of signal level This allows us to potentially save large sums of cabling costs when we eventually upgrade the LINAC BPMs. (New LCLS II BPMs will not see this cost advantage due to pulling of new cables anyway.

15 System Description mTCA BPM Development June 4-5, 2012 Up to 9 BPM processors per crate

16 RTM Signal Flow Block Diagram mTCA BPM Development June 4-5, 2012 Calibrator 4 Channels of Analog Processing

17 Current Status mTCA BPM Development June 4-5, 2012

18 3 RTM Boards Loaded –Initial RF testing complete –Initial Data acquisition complete RTM CPLD Programmed and verified FPGA on AMC card started –Code for driving and control of CPLD 250 Msamp digitizer spec started (90% complete). mTCA BPM Development June 4-5, 2012

19 Prototype Board Complete (in test) BPM AIP Review April 11, 2012 Analog Front End RTMStruck 125 MHz digitizer

20 Modifications of 125 MS/s Board mTCA BPM Development June 4-5, 2012

21 Initial Results mTCA BPM Development June 4-5, 2012 Measured Results from mTCA system on “simulated” Beam Signal

22 Schedule mTCA BPM Development June 4-5, 2012

23 Current Schedule BPM AIP Review April 11, 2012

24 Schedule Comments Tight Schedule to make LCLS II Injector FDR’s for Injector occurring in July/August time frame. Hardware installed in racks not required till late There is some belief that we can still get the design into the LCLS II injector. mTCA BPM Development June 4-5, 2012

25 Risks mTCA BPM Development June 4-5, 2012

26 Risks (mTCA) mTCA Infrastructure –New standard - interoperability is a potential issue – we are diligently working on this Digitizer –Counting on vendor which is currently struggling with 10 channel design. However vendor seems solid and recent vendor visit put most fears to rest. –Potential delays due to vendor Manpower availability/Priority Setting Backup Plan for injector is VME digitizer with AFE in small pizza box. mTCA BPM Development June 4-5, 2012

27 Risks (Pizza box) Obsolete Parts Unsupportable PADs with “wimpy” coldfire CPU’s Redesign necessary on PAD for continued use Custom electronics which must be supported for the indefinite future. mTCA BPM Development June 4-5, 2012

28 Risks (VME Digitizer/AFE) (Backup Plan) Custom Boards (ADC and AFE) (not COTS) Could be obsolete parts on digitizer Custom electronics which must be supported for the indefinite future. May not be able to do multi-bunch operation mTCA BPM Development June 4-5, 2012

29 Next Steps Calibrator needs to be tested Finish FPGA code in Struck 10ch digitizer Order new digitizer (250 Msamp/sec version) System software and integration mTCA BPM Development June 4-5, 2012