Bloomington’s Water Supply: System Overview and Planning by: Rick Twait, Superintendent of Water Purification City of Bloomington Mahomet Aquifer Consortium.

Slides:



Advertisements
Similar presentations
A Drop in the Bucket Today’s Goal: To learn about water scarcity on a global scale. Also, to learn that there is a finite amount of water on earth and.
Advertisements

The CSO Abatement Project Presented by: Paul Nordstrom Director of Operations and Engineering.
Yellowtail Dam & Bighorn Lake Billings, Montana October 18, 2007 RECLAMATION Managing Water in the West.
October 1, 2005 Applying Advanced Water Treatment Technology in the Largest Facility in North America Chad Hill, Vice President – Black & Veatch.
Bloomington’s Water Supply: System Overview and Planning by: Rick Twait, Superintendent of Water Purification City of Bloomington Mahomet Aquifer Consortium.
Presented by Chris Stone Assistant Deputy Director Water Resources Division.
Shell and Prairie Creek Watershed Management Plan – Reasonable Assurance Documentation And Agricultural Reservoirs Southwest Florida Water Management District.
1/40 Surface Water Hydrology at White River Lake, Texas Presented by Shane Walker May 3, 2005 CE 392K.2 – Hydrology.
Dr. Martin T. Auer Michigan Tech Department of Civil & Environmental Engineering Surface Water Supply.
Dr. Martin T. Auer Michigan Tech Department of Civil & Environmental Engineering Surface Water Supply.
City of Kimball Stormwater Re-use Project Protecting our Water Resources – a Forum Series for Policy Makers March 30, 2011.
Lake Sidney Lanier Water Supply for Atlanta, Georgia Field Photos 11/19/07 by J. Ebert.
POTABLE WATER CVEN 451 Term Project. Demand Estimate Water Use Average Flow (GPD/Capita ) # of People ADD (GPD ) MDD^ (ADD*2.4) PHD^ (MDD*1.85) Residential.
Surface Reservoir Storage Operations 2011 Public Utilities Department Public Utilities Department ( (Water Operations Branch)
ENTEBBE MUNICPAL COUNCIL WATER RESOURCE MANAGEMENT Semakula Samson Agricultural Officer Desk Officer ICLEI, Entebbe Municipal Council.
Overview and Project Approach  Clinton is currently experiencing surface water supply shortages in their raw water source, Clinton Lake, and has been.
United Water & Sanitation District Stonegate Village Metro District Water Supply Opportunities 1.
Town of Hamilton Community Information Meeting For Well Harmony Intermediate School May 13, 2010.
Equus Beds ASR Program – Wichita’s Future Water Supply September 6, 2012.
Chicago Department of Water Management Thomas H. Powers, P.E. Commissioner Leadership Summit June 2, 2015.
February 24, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
OUR URBAN WATER SUPPLY … THE PLAN FOR MEETING OUR FUTURE WATER SUPPLY NEEDS LAWRENCE C. TROPEA, JR., P.E.,DEE EXECUTIVE DIRECTOR RIVANNA WATER & SEWER.
VOLUSIA COUNTY PUBLIC WORKS DEPARTMENT WATER RESOURCES & UTILITIES DIVISION Mike Ulrich, Director Mike Ulrich, Director.
Future Water Supply - for the Ashley Valley D. Gerard Yates Central Utah Water Conservancy District.
St. Lucie and Indian River Counties Water Resource Study Mark Elsner, P.E., Director Water Supply Development Division Mark Elsner, P.E., Director Water.
City of Indianapolis Department of Waterworks Water Conservation and Energy Efficiency as Pollution Prevention The View from a Drinking Water Utility Cultural.
Urban Water Department of Hydro Sciences, Institute for Urban Water Management Peter Krebs Dresden, Global water aspects 1 Introduction to urban.
Northern Sunrise County Overview August 25, 2015.
Western Water Issues: The Challenges of Growth NARUC Water Committee Summer Meetings July 2008, Portland, Oregon Walton Hill, United Water.
Hawkin s Delafield & Wood LLP PARTNERSHIP GUARANTEES TO ENHANCE WATER CONSERVATION Presented by Rick Sapir (973) Presented.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Water Demands in the Jackson Blue Spring Basin.
What is St. Paul Regional Water Services? Supplies Public with Water Department of the City of St. Paul Public Employees Governed by Board of Water Commissioners.
Equus Beds ASR Program A Case Study in Success Texas Innovative Water 2010 Seminar October 11, 2010 Texas Innovative Water 2010 Seminar October 11, 2010.
Surface Water Supplies Joe Zulovich Extension Agricultural Engineer Commercial Agriculture Program.
Freshwater Resources Chapter 4, Lesson 3. Where do we get our water from?  Running water  Standing water  Reservoirs: man-made lakes used to store.
South Orange Coastal Ocean Desalination (SOCOD) Project Dana Point/Doheny Beach, California November 2010 Status.
1.Projects 2.Rates 3.Projects and Rates Today’s Presentation:
Mine Pool Mapping The Pittsburgh Seam Bruce Leavitt, P.E., P.G. Consulting Hydrogeologist.
Taste and Odor Control at the Bloomington Water Treatment Plant Rick Twait Superintendent of Water Purification, City of Bloomington Jill Mayes Water Lab.
Project Goals o Meet Strategic Action Plan Performance Measure Strategy 4.1.1: Utilize nature’s water supply resources effectively for water supply o.
Implementation of the Joint Operations Plan Regionalization of the Water Resource Carol Bryck Capstone Project Executive Masters of Public Administration.
POTABLE REUSE THE ALTERNATIVE WATER SUPPLY. Florida Section WateReuse Association November 9, 2015 Chuck Drake, PG.
Alabama Water Resources Conference Perdido Beach, Alabama Mac Underwood, General Manager BWWB BIRMINGHAM WATER WORKS BOARD Sustainability of Water Supply.
Upcoming Rate Case February Department of Waterworks Owns and manages Indianapolis Water. Bi-partisan seven member Board of Directors oversees department.
Public Information Meeting Wastewater Treatment January 26, 2016.
Chris Stone Assistant Deputy Director Water Resources Division.
Water Supply Facilities Work Plan Amendment. Overview Background Statutory Requirements Meeting the Requirements Identified Issues Timetable.
15 Water Supply. 15 Objectives (1 of 2) Discuss rural water supplies. Describe how portable tanks are used to supply water for firefighting. Describe.
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
Broomfield Comprehensive Plan 2016 Update Utility Work Group Report Utility Work Group: − Bob Pearson, Coordinator − Beth Willman, Recorder − Hal Lunka.
Tom Reeder Division of Water Resources.  SGWASA = South Granville Water & Sewer Auth.  Provides water & sewer service to south Granville County, Stem,
DC Water 的项目合作与职业 发展机会 Chein-Chi Chang ( 張建祺 ), Ph. D., P. E. D. C. Water and Sewer Authority, USA University of Maryland, Baltimore County, USA Environmental.
Pasadena Water and Power Set 01/25/2016 Public Hearing Date to Consider Temporary Implementation of the Level 4 Water Supply Shortage Plan December 14,
City Council March 4, Introduction The UCRA recommends the development of a storm water storage basin just to the east of FM 1223, south of Avenue.
MCC Water Infrastructure and Conservation Rural and Suburban.
Pasadena Water and Power Temporary Level 4 Water Supply Shortage Plan Public Hearing City Council - January 25, 2016 Item 17.
Current Water Rates $26.66 per month readiness to serve fee (billed on a quarterly basis at $80.00) 5.14 per 1,000 gallons of water used The City of Flushing.
Minsi Lake Dam Public Meeting October 3, 2016 Paul Urbanik, P.E.
Regulation and Development in the Edwards Aquifer Zone
Water & Wastewater Capacity Charge Work Shop
Rate Increases: Reasons Methods.
Utilizing Hach WIMS for Operational Efficiency
Nueces River Basin By Jason Jenkins.
Municipal Utilities Department June 24, 2008 Agenda Item 9.02
Capital Area Council of Governments
Seattle Water and Wastewater Facilities
October 29, 2018 Terry Lauritsen, P.E.
Water Our Water Resources March 4, 2009 Sanders.
OBJECTIVE HYDROSPHERE
Presentation transcript:

Bloomington’s Water Supply: System Overview and Planning by: Rick Twait, Superintendent of Water Purification City of Bloomington Mahomet Aquifer Consortium Meeting No. 56 October 22, 2007

Bloomington, Illinois Water Utility 77,000+ Customers 75,000 City Residents 2,200+ Customers from Villages and Public Water Districts 11,400,000 Gallons Average Daily Pumpage Approximately 80% Residential Consumption BNWRD Discharges ~20 mgd

Bloomington’s Two Water Supply Reservoirs Lake BloomingtonEvergreen Lake Constructed in 1929Constructed in 1971 Raised 5 feet in 1954Raised 5 feet in surface acres900 surface acres 8,760 acre-ft storage15,480 acre-ft storage 69.5 sq.mi. drainage area41.1 sq.mi. drainage area 70:1 drainage to surface area ratio 29:1 drainage to surface area ratio

Additional Watershed Area Due to Mackinaw River Pumping Pool

Acknowledgements Steve Stockton, Mayor, City of Bloomington Bloomington City Council, Tom Hamilton, City Manager Brian Brakebill, Deputy City Manager Craig Cummings, Director of Water Jill Mayes, Bloomington Water Treatment Plant Dr. John O’Connor, H2O’C Engineering Dr. Jack Wittman, Wittman Hydro Planning Associates The Staff of the Bloomington Water Treatment Plant and Water Department Our Water Customers