1 Pasadena Water and Power Set 01/25/2016 Public Hearing Date to Consider Temporary Implementation of the Level 4 Water Supply Shortage Plan December 14, 2015 Item 21

2 Pasadena Water and Power MWD 10-Day Shutdown Metropolitan Water District (MWD) will suspend water deliveries to Pasadena and other member agencies:  Start date: Monday, February 29, 2016  Scheduled Completion: Wednesday, March 9, 2016. About 60% of Pasadena’s water is imported from MWD Pasadena must rely solely on local groundwater supplies and water stored in reservoirs during the shutdown 2

3 Pasadena Water and Power 3 MWD Construction MWD is constructing a new ozone treatment facility at their Weymouth Treatment Plant in the City of LaVerne Plant will be shut down for 10 days to allow for switchover No imported water will be delivered to Pasadena during the shutdown.

4 Pasadena Water and Power Water Supply/Demand Supply Source Ten-Day Supply (MG) Daily Supply (MGD) Reservoirs77 MG7.7 MGD Five Local Wells103 MG10.3 MGD Total180 MG18 MGD Typical March Demand  Average: 23-24 MGD  Wet years: 20 MGD 4 Past “Level 4” Demand  3/2011: 15.2 MGD (wet)  2/2013: 18.3 MGD (dry)

5 Pasadena Water and Power 5 Water Conservation  Under Current Level 2 Restrictions:  The last watering day prior to the MWD shutdown would be Saturday, February 27, 2016  PWP would have insufficient time (only one day) to completely fill local reservoirs  Staff recommends implementing the Level 4 Water Supply Shortage Plan effective February 25, 2016

6 Pasadena Water and Power 6 Water Shortage Plan Levels Level 1Level 2Level 3Level 4 Watering Days Per Week 3 summer 1 winter 2 summer 1 winter 1 summer 1 winter No watering or irrigating Obligation to Fix Leaks, Breaks or Malfunctions 72 hours after notification 48 hours after notification 36 hours after notification 24 hours after notification Additional Prohibitions N/A Filling ornamental lakes/ponds Filling ornamental lakes/ponds Filling ornamental lakes, ponds, residential pools or spas No new potable water service provided

7 Pasadena Water and Power 7 Public Outreach News articles through City/PWP publications- CM Newsletter, Pasadena In Focus, PWP e-newsletter Billboards (3 citywide) & bus shelters Citywide mailer to all PWP customers Direct outreach to City departments, large customers, and community groups Update phone systems, message & Customer Service Representatives/311 Reps will update customers Daily updates on PWP website and city/PWP social media (Facebook/ Twitter) Ads in print publications- Pasadena Star News, Pasadena Weekly, Journal, Independent, Outlook, Pasadena Now, La Opinion

8 Pasadena Water and Power 8 Action Items 1.Declare CEQA Exemption 2.Set date of January 25, 2016, for Public Hearing to: 1.Determine water supply shortage emergency exists. 2.Temporarily implement Level 4 Water Supply Shortage Plan measures starting February 25, 2016 until MWD imported water supply is restored 3.Resume Level 2 Water Supply Shortage Plan after termination of temporary Level 2 Water Supply Shortage Plan


Download ppt "Pasadena Water and Power Set 01/25/2016 Public Hearing Date to Consider Temporary Implementation of the Level 4 Water Supply Shortage Plan December 14,"