FABRICATION OF BLOCKS OWNERS REQUIREMENT DESIGN CLASSIFICATION SOCIETY

Slides:



Advertisements
Similar presentations
AFT END ARRANGEMENT By Group 1.
Advertisements

Work Smart. Is our vessel ready on site Or has there been a delay.
CODE OF PRACTICE FOR BUILDINGS
Steel Construction.
Large Steel Seamless Pressure Vessels
WELD TESTING.
HVAC523 Heat Sources.
Speech by Chinese Shipbuilding Industry ( CSNAME &CANSI ) Contents 1. The acceptation of IMO PSPC standard 2. Preparation done by Chinese shipbuilding.
HVAC523 Soldering.
© 2012 Delmar, Cengage Learning Automotive Plumbing: Tubing and Pipe Chapter 24.
2 Fire Fighter Qualifications and Safety Skill Drills.
Service Technician Training
COMPANY PROFILE +66 (0) , +66 (0) , +66 (0) , +66 (0) /65 Moo 4 Tumbol Tubma Amphur Muang Rayong 21000
Lesson 4 Shell Plating and Framing.
Finally, a compressed air piping system so simple…it’s EZ!
Example of a successful lining Description: Tuff Stuff is sprayed as a protective lining onto a boat hull. The lining with TS provides a high level of.
View from the bridge wing in the drydock of open cargo holds forward.
Chapter 7 Metals.
Ship Structural Response: Loads
Shipyard Layout. Big Bigger Biggest Manufacturing Processes.
Ship Building Process Su-jin Kim Manufacturing Process
Objective : To understand the fabrication, design, installation welding, inspection and testing for new construction in oil and gas industry After followed.
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
FLEXI TANK PRESENTATION
Training Services Consultancy Auditing Inspection S.
High Pressure Lifting Bags
Student Book © 2004 Propane Education & Research CouncilPage Applying Protective Coatings to Storage Containers ASME tanks require proper.
CHAPTER 4 CPB 20004: Plant Utility n Maintenance
ALOKRAJ. V - NA07B004. High Pressure Water Jet Blasting Machine  One Electric driven water blasting machine  2 water jet guns, hoses 400 feet each as.
Floors and Double Bottoms
1. Fabrication definition Fabrication is the second main process in steel lifecycle after production from mills. 2.
Ivy Tech Community College
SFOBB East Span Seismic Safety Project Steve Margaris, Specifications Engineer, Caltrans.
1 HVACR316 - Piping Soldering. 2 Soldering Copper Tubing The most common method of joining copper tubing in hydronic heating systems is soft soldering.
NSQP MEETING Valery AKHNAZAROV January 20th 2011 ISP PP0 Board Bonding Procedure Type 1 Type 3 Type 4peek Type 4 Assembly Name: ISP ASM Parts.
Air Conditioning International Mechanical Code
Lesson Five Bulkheads and Pillars.
Automotive Engines: Theory and Servicing, 7/e By James D. Halderman Copyright © 2011, 2009, 2005, 2001, 1997 Pearson Education, Inc., Upper Saddle River,
Principles of Manufacturing Copyright © Texas Education Agency, All rights reserved 1.
Copyright © 2010 Delmar, Cengage Learning. ALL RIGHTS RESERVED. Unit 13 Fastening Metal.
Lecture 2: Ship structural components
WELCOM TO EGIQC. EGIQC Engineering Group For Inspection & Quality Control.
Commissioning Forms & Procedures ESCONDIDA CONSTRUCTION COMPLETION PHASE CIVIL PROCEDURES INSTRUMENTACION PROCEDURES Testing Test of Density In Field Z01.
SIA “Reserv Inc” Arturs Andersons Latvia Tel
STORAGE AND MAINTENANCE OF LARGE FARM EQUIPMENT Prepared by : Von G. Peavy South Region Ag Mechanics.
S. Barbanotti - DESY Requirements Conformance for SRF Cryomodules Workshop 16/10/2014 – ESS, Lund XFEL cryostat main components: Quality Assurance and.
TOPIC 4: SHIPYARD PRACTICES.
Anhydrous Ammonia Storage and Handling Original Power Point Created by Brandon Ritter Modified by Georgia Agricultural Education Curriculum Office June.
Plumbing Unit. Purpose: Transporting liquids safely from one point to another for storage, processing, and direct use Carries fresh water from a source.
Financial Elements 1. Firm’s Main Objective is Value Creation for Shareholders and Other Stakeholders.
Automotive Engines Theory and Servicing
Fabrication of Boilers and Pressure Vessels
Automation Chapter 2 Manufacturing Operations The University of Jordan
Base Metal Preparation
How to Select and Optimize Abrasive Blasting Equipment
ENGINE CLEANING AND CRACK DETECTION
CLEAN UP & INSPECTION.
Construction Area Activity Quantity HSD Oil StorageTanks Mechanical works Sand blasting of bottom plates Primer coating of bottom plates Welding of plates.
Automotive Engines Theory and Servicing
Automation Chapter 2 Manufacturing Operations The University of Jordan
Organization Chart Part II.
Superstrut SilverGalv (EG)
SAFETY, TOOLS AND EQUIPMENT, SHOP PRACTICES
LaBour Pump Selma, Alabama “The Can Do Place” 11/19/2018.
SALMAWY UNITED GROUP CONSULTANT
Automotive Engines Theory and Servicing
Presentation transcript:

FABRICATION OF BLOCKS OWNERS REQUIREMENT DESIGN CLASSIFICATION SOCIETY PROCUREMENT SURFACE PREPATION CUTTING FABRICATION ERRECTION

OWNERS REQUIREMENT CONTRACT WORKING SPECIFICATION VESSELS PARTICULARS MACHINERY AND EQUIPMENTS PAINTING SPECIFICATION CLASSIFICATION SOCIETY.

DRAWINGS DESIGN SECTION. BASIC DRAWING CONSTRUCTIONAL DRAWING AS PER BLOCKS CUTTING PLAN (NESTING)

CLASSIFICATION SOCIETY BASIC DRAWING APPROVAL CONSTRUCTION DRAWING APPROVAL MATERIAL APPROVAL WELDING PROCEDURE APPROVAL WELDERS QUALIFICATION APPROVAL

PROCURREMENT OF MATERIAL(STEEL) CLASSIFICATION SOCIETY DIMENSION AS PER DRAWINGS & CUTTING PLAN GRADE OF MATERIAL AVAILABILITY.

STACKING OF MATERIALS

LOADING OF PLATE ON ROLLERS FOR SURFACE PREPARATION THE PLATE HAS TO BE DRY AND FREE FROM GREASE OIL ETC.BEFORE BLASTING.

SURFACE PREPARATION BLASTING Abrasive used for blasting sand Copper grit Iron grit CLEANING

SHOP PRIMER PAINTING Shop primers are thin coatings which are applied to steel plates and profiles after blast cleaning to provide temporary corrosion protection during transport, storage and production.

PAINTING

PAINT DRYER

STACKING OF PLATES

CUTTING OF PLATES CUTTING PLAN Nesting of plates as per drawing. NOTE:-Nesting is done taking in consideration the shrinkage area after welding. Program is fed to the CNC cutting machine. Plate placed on the cutting bed is as per the dimensions in the program fed. Plate squareness is checked & cutting is proceeded according to the program.

PARTS CUT FROM PLATES FLOORS MARKING ON FLOORS

EDGE PREPARATON

BENDING OF PLATES

TEMPLATES

BLOCK FABRICATION (e.g. Double Bottom) SUBASSEMBLY Bottom panel Tank top panel Floors Girders Bulkhead Margin brackets

SUBASSEMBLY BOTTOM PANEL TANK TOP PANEL

SUBASSEMBLY FLOORS GIRDERS MARGIN BRACKETS BULKHEAD

UNIT ASSEMBLY Fitting & welding Tank top panel shifting Floor, girder, bulkhead and margin bracket fitting to the tank top panel and its welding. Pipe line fitting and welding accept end connections Bottom panel fitting. Bilge plate fitting and welding.

Bilge plate fitting and welding

Welding The block is toppled and welding of floors, girders, bulk head and margin brackets to the bottom panel is carried out ,this is done to change the position of welding from overhead to down hand. As down hand welding is faster then overhead and also consumable required is less. Dry survey is carried out .

STACKING OF BLOCKS

FABRICATED BLOCKS Aft block. Bulbous bow

Erection of blocks

Joining of Mega Blocks

Test to check the soundness and water tightness of blocks NDT Ultra sonic testing Radio graphic testing Magnetic particle testing Die penetrant testing/ Liquid penetrant testing. WATER TIGHTNESS Air pressure test Hydrostatic test Hose test.

Painting of blocks Surface preparation as per painting specification. Cleaning of surface from water, grease, oil etc. Blasting, buffing (power tooling). Cleaning of grit after blasting and surface inspection. Painting as per specification.

Launching Pre launching Activities Under water survey Drain plug fitting Over board valves to be closed. Anode fitting to be checked. Propeller to be locked. Rudder to be locked. Clearing the path of slipway etc. Launching.

Final out fitting Sea trials Delivery.