TRT Detector Status Report Konstantin Zhukov (Lebedev Physics Institute) for the ATLAS TRT group ID week, 19 May 2014 1.

Slides:



Advertisements
Similar presentations
HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
Advertisements

The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
Uli Schäfer Discussions with H.B. after last meeting… All ATLAS standard racks and crates will be monitored. Helfrieds group will equip them with ELMBs.
Clara Gaspar, May 2010 The LHCb Run Control System An Integrated and Homogeneous Control System.
TRT DCS overview Elzbieta Banas Zbigniew Hajduk Jolanta Olszowska (INP PAS Cracow) ID Week /TRT Operation1.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
5 March DCS Final Design Review: RPC detector The DCS system of the Atlas RPC detector V.Bocci, G.Chiodi, E. Petrolo, R.Vari, S.Veneziano INFN Roma.
DCS TCSG November 10th 1999, H.J.Burckhart1 Status of the general purpose I/O system LMB u DCS Architecture u LMB u Local Monitor Box (LMB) u Concept u.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
DCS planning for ITS/SDD Vojtech Petracek Jiri Kral CTU Prague DCS workshop CERN.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Plans for the 2015 Run Vito Palladino Straw Working Group 2/2/2015.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
Active gas system status. S.Konovalov, K.Zhukov. Active gas system operation. S.Konovalov "Active gas system..."TRT Overview  Good design.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
Mobile DAQ Testbench ‘Mobi DAQ’ Paulo Vitor da Silva, Gerolf Schlager.
TOF Gas System Project Overview. Content Prototype for Aging tests done for RPC’s TOF Gas System: parameters and module layouts. Special Technology: channel.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
Anatoli Romaniouk TRT Introduction TRT in ATLAS p. 2-4TRT in ATLAS p. 2-4 TRT design p. 5-7TRT design p. 5-7 TRT operation principles p. 8-9TRT operation.
Status of NA62 straw electronics Webs Covers Services Readout.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
07-Jan-2010 Jornadas LIP 2010, Braga JC. Da SILVA Electronics systems for the ClearPEM-Sonic scanner José C. DA SILVA, LIP-Lisbon Tagus LIP Group * *J.C.Silva,
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
CF 16/Feb/20031 H8 Beam Test in 2003 ─ Preparation status TGC-Japan electronics group.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
TB Peter Glässel, Heidelberg1 TPC Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
NA62 straw tracker DCS Straw tracker overview Bulk power supply Power supply distribution and monitoring LV + monitoring HV Temperature monitoring Gas.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
ATLAS DCS ELMB PRR, CERN, March 2002Fernando Varela ELMB Networks CAN/CANopen Interoperability of the ELMB Usage of the ELMB in ATLAS ELMB Networks Full.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Straw electronics status  Signal generation and formation in straw  Webs + Cover  Backend  TTC  Services + DCS  New engineer on VIA program Georgios.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Distributed Low Voltage Power Supply System for Front End Electronics of the TRT Detector in ATLAS Experiment E.Banaś a, P.Farthouat b, Z.Hajduk a, B.Kisielewski.
Active gas system status & plans. S.Konovalov, K.Zhukov, K.Vorobev.
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
10/09/10FV 1 News and observations from Brussels' meeting.
ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart1 CAN and LMB in ATLAS u Controls in ATLAS u CAN u Local Monitor Box u Concept.
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
Plans for the 2015 Run Michal Koval, Peter Lichard and Vito Palladino TDAQ Working Group 25/3/2015.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Outline Upgrade status of the ECAL/HCAL HV control mezzanine board;  Firmware design,  Setup for making functional tests and validation FPGA firmware.
TRT (and a bit beyond) – Overview 1. TRT Desynchronization – [206248: 1 -> : 533), elogelog – ROD firmware issue Reverted to the before-the-TS settings.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
TRT HV System status and plans for LS1 LPI Moscow, K. Zhukov.
LKr status R. Fantechi.
Micromegas Vertex Tracker Status Report
Institute of Nuclear Physics Polish Academy of Sciences
T1 Electronic status Conclusions Electronics Cards:
Mini-drawers, FE-ASIC , Integrator
LPI Moscow, K. Zhukov, MEPhI-LPI Moscow, V. Kantserov
TRT DCS status and LS1 plans
TPC Detector Control System
Presentation transcript:

TRT Detector Status Report Konstantin Zhukov (Lebedev Physics Institute) for the ATLAS TRT group ID week, 19 May

Subsystems covered in this talk Active Gas System (Active GS) Remote Regulation for AGS Ozone studies Gas Gain Stabilization System (GGSS) High Voltage System (HV) DAQ Radiation Damages DCS Auxiliary TRT systems 2

Active Gas: leaks estimations In 2012 large leaks appeared in detector’s peek pipes - With the help of many our colleagues Data quality wasn’t affected. We fixed all accessible pipes (in the EndCaps). Target leak rate ~100l/day (in TDR) Modifications/upgrades of the GS -General maintenance of the GS done -Sensors/transmitters upgrade for precise control done -Distribution racks modifications to be ready for different scenarios of detector work (for Ar-mix, Xe-mix flush) in progress -Planned upgrades for safety and reliability in progress -Transferring specific TRT options to CPC6: run mode – done/ other in progress -Remote gas flow regulation and DCS control (remote adjustments) in progress Tuning in progress: System is running with AR-CO2-O2 mixture. The fine tuning of leaking channels is ongoing to estimate the level of gas consumption we can keep. Works with remote regulation implementation. All works are well supported by CERN Gas Group. 3

Active GS: Remote flow regulation Remote flow regulation Design/production of HW part Software development/ debugging Test stand for DCS part development Installation in the rack in UX Full system test with DCS control with running GS in normal mode ready to install. Regulators’ modification was done (fine regulation). All parts are ready to install. in progress. Few versions of SW were tested. Algorithms’ debugging is in progress. Test setup is ready for remote tests/developing of FSM panels In progress. EC A has been equipped with regulators. EC C/Barrel ready to mount. In progress. be done/debugging After full installation many tests should be done/debugging 4

Ozone studies The ozone production studies are in progress to give an answer whether we can reduce ozone concentration to reduce destructive factor for peek tubes. done -Tests with 300mm straw matrix (a prototype with 15 straws) were done done -Tests with different gas additive were done (using the straw matrix) in progress -Measurements with Barrel module type2 (1440mm straws) in progress to be done in June -Ozone influence on TRT materials (peek, polyurethane etc.) to be done in June Results will be presented at TRT Krakow workshop in June. 5

Gas Gain Stabilization System The commissioning of the new hardware was successfully done. New hardware equipment installed in USA15. migrated in March GGSS - migrated in March All new hardware installed GGSS low level software packed to dedicated rpms Waiting for Xe mixture for final calibration and tunning GGSS is working with the reference Ar gas mixture 6

High Voltage system upgraded SC508 HVSys Controller Firmware upgraded (to achieve better communication performance) Baud rate (better internal synchronization-buffering) – 3x faster Cell monitoring faster (aggregation of voltage value, current value and status bits in one command) New OPC UA server development in debug phase (h/w) HVSys OPC DA (TRT private development – 2005) migrated to new OPC UA standard ATLAS standard OPC UA Toolkit used (migration to new Toolkit) Windows version of the server is ready Windows version of the server is ready in progress Moving to SLC6 platform, tests and preparing rpm package in progress in progress PFC controller upgrade: in progress (waiting for boards from HVSYS) Three more boards ready to send for checks/upgrade. System is ready for M3. 7

DAQ: milestones runs 8 TRT joined M2, will participate in all following milestone runs In M2: - migration of software to SLC6 and tdaq successful - joined combined running successful - provided fast-or trigger for cosmics successful - test of recovery procedures to be completed in M3 - high rate testsROD firmware prevented us from reaching 100 kHz have a new version now, currently under test in standalone to be tested in combined partition in M3

DAQ: other upgrades/maintenance 9 Tackling the front-end – ROD bandwidth limit: reduced readout (chop off last 4 of 27 data bits per straw word) allows 105 kHz rates, minimal impact on trackingimplemented/tested Tackling the ROD processing limit (event processing time proportional to occupancy due to compression) application of validity gate (straw considered empty if no signal in certain time window) reduces occupancy implemented/tested clock speed update on ROD board implemented, currently testing hard-coding of most common straw patterns to increase speed of compression to be done Hardware crate power supplies: new fans, higher current limits for end-cap in preparation for higher load in run 2 done low voltage power supplies: rolling upgrade in progress to improve voltage stability by gold-plating the connectors on schedule for Run 2 maintenance of off-detector electronicsin progress recovering of spares where possiblein progress

Radiation damage studies 10 Radiation damage of front-end electronics effects seen at lower total ionizing doses than expected flattening off to check if initial effects were missed during earlier tests, new irradiation tests of front-end board (lower rates, lower total doses) work in progress high threshold calibration to mitigate radiation effects during Run 2 in progress Absolute change in the threshold needed for a 300 kHz noise rate, vs integrated luminosity in

DCS: migration to new environment: Dell R610, SLC6/VM2008, WinCCOA 3.11 SCS – migrated in February System Overview part to be installed after all projects migrated to be followed Gas system: all h/w modifications *extra mixer *, *extra distribution* - to be followed by DCS modifications when finished by gas group (DCS part to follow the h/w commissioning) - we are in contact with gas group developers LCS1 ( Cooling, LV Bulk, VME crates, CAN bus PSU, HWI, Alarms ) : migrated in December Scattered project: main project on Linux, Wiener OPC DA server on VM2008 Upgrades foreseen: FSM for CAN PSU to include control of individual branches PPA1, A2, C1, C2 ( Front End LV + detector temperature ): migrated in December CanOpen OPC UA server + upgraded TRT dedicated f/w component HVA, B, C ( high voltage control ): to be migrated when HV OPC UA server ready CHROM ( gas chromatograph ) : to be migrated, a small project, will be done at the end 11

Auxiliary systems ouside Point1 SR1 TRT Demonstration and Test Stand Test Stand is operational (W7 + XP PC’s) Long term plans: migrate to Dell Server PowerEdge 1950 (pcatltrtsr1det) with Linux SLC6 and VM 2008 Test Stand in 104 RC-016 : tests and repairs of LVPP Patch Panels and tests of TTC Patch Panels, tuning Maraton bulks Test stand operational on 2 XP PC’s Long term plans : started Migrate to SLC6/W7/W2008 – started started Development GUI for LVPP tests (in place of CLI) - started 12

SUMMARY 13 is readyOn schedule Active gas system: Ready for M3. Run mode is ready. On schedule. Leak estimations in mid-summer. in progress. Remote regulation : installation in progress. Ready for final tests this summer. in progress Ozone studies: in progress. Results in June-July. Ready in progress. HV System: Ready for Run2. PFC upgrade in progress. Ready in autumn. Ready GGSS: Ready for Run2. Some tuning with Xe mixture needed. donein progress, on schedule DAQ: many things done, some things in progress, on schedule in progress Radiation Damages Studies: new irrad. tests in progress migratedin progress DCS: many things has been migrated. Other things in progress, on schedule.

Thank you. 14