2016 Transitional GEO Work Programme Discussion & CONSOLIDATION Session 10, 2015 GEO Work Plan Symposium Geneva, 7 May 2015 Alan Edwards (IPWG) Giovanni.

Slides:



Advertisements
Similar presentations
© GEO Secretariat Agenda Item 3. GEO UPDATE. © GEO Secretariat Membership 67 members and 43 Participating Organisations – New Members:Latvia, Moldova,
Advertisements

GEO-5 in Ottawa 1 29 November 2004 Draft GEOSS 10-Year Implementation Plan and Status Report on Reference Document Ivan B. DeLoatch, Toshio Koike, Robert.
1 GEOSS Monitoring & Evaluation. 2 1st GEOSS M&E WG meeting outcomes Agreed on 1.the final draft of Terms of Reference for the M&E WG 2.The plan for delivery.
Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.
© GEO Secretariat The Group on Earth Observations – Status and Post 2015 Osamu Ochiai GEO Secretariat 41 st CGMS Tsukuba, Japan 8-12 July 2013.
GEO Strategic Plan : Implementing GEOSS
ENVIRONMENTAL MANAGEMENT PLAN
© GEO Secretariat 2.4 Monitoring and Evaluation Activities Craig Larlee / John Adamec Co-Chairs, M&E Working Group GEO 2015 Work Plan Symposium 5—7 May.
Session 8. GEOSS requirements, functions, architecture Session Feedback Presenter: Max Craglia.
© GEO Secretariat GEO WP & 2013 GEO priorities for CEOS Support GEO Secretariat CEOS SIT-28 NASA - Langley March 2013.
Report of the IOC Task Force on the GEOSS Common Infrastructure (GCI) Ivan DeLoatch, U.S. Geological Survey Alan Edwards, European Commission Co-chairs.
GEO Strategic Plan : Implementing GEOSS AN UPDATE GEO WORK PLAN SYMPOSIUM 05 MAY 2015 GENEVA, SWITZERLAND.
Report of the Science and Technology Committee GEO Plenary VIII Istanbul, Turkey 16 November 2011.
6. Strategic Plan : Implementing GEOSS Validating the way forward: Review of feedback from Plenary.
6th GEO Capacity Building Committee Meeting Hanover, Germany 13 to 14 February 2008 CB-07-01a Marta ANGOLOTI INM Spain.
© GEO Secretariat GEO Work Plan 2nd GEOSS Science and Technology Stakeholder Workshop "GEOSS: Supporting Science for the Millennium Development.
ID-01 report 17 September 2014 IDIB meeting, Enschede Michel Schouppe
ST Kick-off Promoting Awareness and Benefits of GEO in the Science and Technology Community Douglas Cripe – GEO Secretariat Frascati/Brussels
Plenary Discussion of Framework for Engagement GEO XI Plenary Geneva, November, 2014.
The Use of the Targets by the Institutions & Development Implementation Board in Monitoring the Work Plan Implementation 2nd GEOSS Science and Technology.
WGISS-39, Tsukuba, Japan, May 11-15, 2015 GEO Community Portals Ken McDonald/NOAA CWIC Session, WGISS–39 May 13, 2015.
GEO Strategic Plan : Implementing GEOSS Implementation Plan Working Group (IPWG) GEO-XI PLENARY NOVEMBER 2014 GENEVA, SWITZERLAND.
GEO Work Plan Symposium 2012 ID-01 Advancing the GEOSS Data Sharing Principles.
© GEO Secretariat Work Plan Guidance document 2 nd Capacity Building Committee Meeting, Brussels September 2006.
GEO Strategic Plan : Implementing GEOSS IMPLEMENTATION PLAN WORKING GROUP GEO EXECUTIVE COMMITTEE MARCH 2015 GENEVA, SWITZERLAND.
Draft GEO Framework, Chapter 6 “Architecture” Architecture Subgroup / Group on Earth Observations Presented by Ivan DeLoatch (US) Subgroup Co-Chair Earth.
Preparation of the 2010 GEO Ministerial Summit GEO Science and Technology Committee Preparation of the 2010 GEO Ministerial Summit Gilles OLLIER Head of.
Task ID_01 “Advancing GEOSS Data Sharing Principles” The Group on Earth Observations Data Sharing Activities for 2013 Reported by Lerato Senoko 29 th EXCOM:
GEO Implementation Plan Working Group, 5 th Meeting Section 3 & 4 GEO Secretariat, Conference Room 8 Jura, Geneva, Switzerland.
Capacity Building & the European Community Research Framework Programme: (FP7) Alan Edwards European Commission.
The Data Sharing Working Group 24 th meeting of the GEO Executive Committee Geneva, Switzerland March 2012 Report of the Data Sharing Working Group.
Report of the 6 th GEOSS Evaluation Presentation to GEO-XII 11 November 2015 John Adamec Co-Chair GEO Monitoring & Evaluation Working Group.
EVALUATION OF THE SEE SARMa Project. Content Project management structure Internal evaluation External evaluation Evaluation report.
The GEOSS Science & Technology Stakeholder Network – Workshop Goals Michael Nyenhuis Hans-Peter Plag.
Committee on Earth Observation Satellites CEO Team 29 th CEOS Plenary Kyoto International Conference Center Kyoto, Japan 5 – 6 November 2015 CEOS and GEO.
GEO Implementation Boards Considerations and Lessons Learned (Document 8) Max Craglia (EC) Co-chair of the Infrastructure Implementation Board (IIB) On.
Science and Technology Roadmap - current progress 1 st GEO/EGIDA Workshop Bonn, Germany, May 09 th - 11 th, 2011.
GEO Work Programme 2016 WGISS#40 HARWELL (UKSA) 28 SEP - 02 OCT 2015 MIRKO ALBANI, ESA.
GEO Implementation Mechanisms Giovanni Rum, GEO Secretariat GEO Work Programme Symposium Geneva, 2-4 May 2016.
Support to National REDD+ Action: Global Programme Framework (SNA) Work Plan and Budget 2015 Information and Knowledge Sharing Sessions Twelfth.
Helen M. Wood Co-chair / U.S.A. On behalf of the Data Sharing Task Force 22nd Meeting of the GEO Executive Committee Geneva, Switzerland July 2011.
GEOSS Data Sharing: Plans for 2016 and beyond GEO Work Programme Symposium WMO, Geneva, 2 May 2016 Robert Chen on behalf of the DSWG co-chairs (GEO Foundational.
GEO 2016 Work Programme Giovanni Rum, GEO Secretariat GEO Work Programme Symposium Geneva, 2-4 May 2016.
Report from GEO Post-2015 WG and GEO Ministerial WG D. Brent Smith, NOAA CEOS Representative CEOS SIT-28 Meeting Hampton, Virginia, USA 12 March 2013.
Reporting, Monitoring and Evaluation Giovanni Rum, Chao Xing GEO Secretariat GEO Work Programme Symposium Geneva, 2-4 May 2016.
Work Plan Work Plan Management (Document 21)
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
GEO Strategic Plan : Implementing GEOSS Douglas Cripe GEO Work Programme Symposium 2-4 May 2016, Geneva.
© GEO Secretariat Work Plan Management Update GEO Work Plan Symposium 30 April – 2 May 2012.
GEO Programme Board Status and key messages Tim Haigh Programme Board co-chair.
Decision Makers Researchers Private Sector EducationCitizens Raw dataProducts Processing services APIs Applications and APPs Games & Tutorial Directories.
Reporting, Monitoring and Evaluation
4th Assessment of Progress Against the GEOSS 2015 Strategic Targets
Summary of the Outcomes of the 1st AfriGEOSS Steering Committee Meeting Humbulani Mudau DST, South Africa 1st AfriGEOSS Symposium 27 – 29 April 2016.
Giovanni Rum, GEO Secretariat GEO Work Programme Symposium
Summary GEOSS Subgroup Teleconference
GEO’s approach to user need definition and Gap Analysis process
Subgroup 2 - Foundational Tasks structure review and recommendations for the WP Francisco Chavez (POGO, lead), Ivan Petiteville (CEOS), David.
GEO WP 1. INFRASTRUCTURE (Architecture and Data Management)
CRE8TIVE KO Meeting, Rome Italy Quality Assurance
Programme Board 6th Meeting May 2017 Craig Larlee
Capacity building coordination Mark Noort HCP International Andiswa Mlisa GEO secretariat GEO WP Symposium Geneva, Switzerland May 4th, 2016.
Capacity Building Enhance the coordination of efforts to strengthen individual, institutional and infrastructure capacities, particularly in developing.
2018 Budget Dr Stuart Minchin, Australia
GEO Programme Board Report
2017 WPS Break-Out Session: Addressing Gaps
Work Plan Management GEO Work Plan Symposium 30 April – 2 May 2012
Oceans and Society: Blue Planet
Links with GEO.
2nd Marine Board Forum: towards a European Network of Marine Observatories for monitoring and research Session 2: Projects and Initiatives Alan Edwards.
Presentation transcript:

2016 Transitional GEO Work Programme Discussion & CONSOLIDATION Session 10, 2015 GEO Work Plan Symposium Geneva, 7 May 2015 Alan Edwards (IPWG) Giovanni Rum (GEO Sec) Douglas Cripe (GEO Sec) And most importantly YOU – The GEO Community

Page 2 Outline of the Document Suite For the GEO-XII Plenary and 2015 Ministerial 1.Ministerial Summary (2 pages) 2. Strategic Plan (approx. 10 pages) and Annexes to the Strategic Plan: GEO Rules of Procedure Description of Implementation Mechanisms Architectural Elements Monitoring & Evaluation framework 3. Work Programme The Strategic Plan, its Annexes and Work Programme are intended to provide all GEO Members and PO with a complete overview of the information required to reach decisions on GEO activities in support of GEO's Strategic Objectives and the implementation of the GEOSS.

Page 3 So for the Plenary we need to prepare a draft 2016 Work Programme And to do this, we need YOUR help. The AIM of this Session Is to discuss and consolidate the structure and content of the 2016 transitional GEO Work Programme The OUTCOME of this session Should enable the IPWG, supported by the GEO Sec., to develop the next draft of the Work Programme for broad consultation.

Page 4 The GEO Work Programme presents the activities that GEO undertakes to achieve its Strategic Objectives. It describes GEO Flagships, GEO Initiatives and GEO Community activities, and defines GEO Foundational Tasks. The GEO Work Programme serves two functions: ● It is used by GEO Members and PO to agree on priorities and activities, including the use of GEO Trust Fund and GEOSec resources. By quantifying resources needed for the activities the Work Programme provides a tool to match GEO's ambitions with available resources. ● The Work Programme also provides an overview of what GEO plans to undertake towards achieving its Strategic Objectives. It provides an information resource helping stakeholders to align their contributions. Strategic Plan: Section 4 Implementation – Work Programme

Page 5 In order for GEO to be financially stable, GEO activities need to be properly funded. The implementation mechanisms set out in Section 4 adopt a resourcing model where resources committed are commensurate with the type of activity (i.e. GEO Flagships, GEO Initiatives, Community Activities, Foundational Tasks). Contributions are: Typically made in-kind, e.g. by observation systems operated to serve the Initiative’s objectives, models, funded research projects or programmes; But may also include direct financial contributions or those that are earmarked within the Trust Fund as being in support of a particular activity. Strategic Plan: Section 6 Resources – GEO Activities

Page 6 Description: Advances in data sharing and broadening acceptance of the GEO Data Sharing Principles (DSP) have been an important success of GEO to date. Promoting the continued adoption of free, full, open and timely data access as a societal benefit remains one of GEO’s Core Functions. … Implementation mechanism: a GEO Foundational Task, implemented by the Members of the DSWG with support from the GEO Secretariat. Resources (purely for illustrative purposes): The activity is resourced from the Members of the DSWG. Some support is provided by the GEOSec. In particular, the GEOSec will assign a full-time IT professional to implement measures that enhance the use and uptake of GEOSS data, in particular through the GEOSS Data-CORE. EXAMPLE (purely for illustrative purposes) Data Sharing Source * GEO Sec25,00075,000Staff time EC25,000 Staff time (in kind) USA25,000 Staff time Trust Fund/ Member/ In-kind 100,000300,000IT Expert

Page 7 Some questions What should be kept in the current draft of the WP? What should be revised? What will not work? And what is missing? And (amongst many others) issues to be addressed: How do we ensure effective cross-cutting? For example, do we need (a) Synergy Board(s) to enhance: operations / requirment capture / development? How do we embed GEO's unique convening power within the Work Programme?power

Page 8 ENGAGE: The GEO Community, SBAa and Users Strategic Plan: Section 2 Scope & Strategic Objectives: Advocate, Engage & Deliver

Page 9 The 4 Implementation Mechanisms set out in the Plan are: GEO Community Activities: they enable a broad variety of activities, allowing stakeholders to cooperate flexibly in a bottom-up fashion and with a low initiation cost. GEO Initiatives: they develop and implement prototype services (e.g., demonstrating technical feasibility through pilot products), according to GEO priorities. They allow Members and PO to coordinate their actions and contributions within an agreed, yet flexible framework. GEO Flagships: they develop and implement pre-operational services according to GEO priorities. They allow Members and PO to spin-up an operational service serving common needs. GEO Foundational Tasks: they enable GEO to implement selected, often enabling, tasks to achieve GEO Strategic Objectives and Targets. Advisory mechanisms, such as Advisory Boards, may be set up for individual Foundational Tasks, as required. Strategic Plan: Section 4 Implementation - Mechanisms

Page 10 A GEO Programme Board, comprised of individuals elected from among Members and Participating Organizations, will oversee the development and implementation of the GEO Work Programme. The  GEO Programme Board: ensures alignment with the priorities of GEO Members & PO; identifies resource commitments by GEO Members & PO. The Work Programme is presented for acceptance by Plenary. By accepting the Work Programme GEO: Accepts that the GEO Foundational Tasks should be implemented with the resources indicated; and Takes note that the GEO Flagships, GEO Initiatives and GEO Community Activities are expected to be implemented with the corresponding indicative resources. Strategic Plan: Section 4 Implementation – Work Programme