HL-LHC Standards and Best Practices Workshop (11-13 June 2014)

Slides:



Advertisements
Similar presentations
USING NASA QUALITY STANDARDS NASA Academy of Aerospace (AAQ) Quality Mini-Workshop Ken Crane Quality Engineering Technical Discipline Team Lead NASA SAFETY.
Advertisements

SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
TECH 101 Product Design and Manufacturing. TECH 1012 System Life-Cycle Engineering 2 Major phases in almost all products and in many cases services –Acquisition.
Safety Management of the LIU Project A. Funken Anne Funken, LIU PT 21/05/15.
Safety & Safety Documentation 2 3 Safety in three Questions Why ? Providing a safe workplace is a legal and moral obligation on every undertaking, and.
H IGH L UMINOSITY LHC WP1 - CERN S AFETY R EQUIREMENTS Stefan Roesler - Phillip Santos Silva – Ralf Trant EDMS# HSE Unit April 2011.
Configuration Management Process and Environment MACS Review 1 February 5th, 2010 Roland Moser PR a-RMO, February 5 th, 2010 R. Moser 1 R. Gutleber.
Objectives 4 Understand the ISO standards. Why are standards required? 4 Need standards to ensure that a term means the same for all 4 Need company standards.
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
From Research Prototype to Production
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
HL-LHC Quality management
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
Overview of WP1 at a Glance Pierre Bonnal Engineering Department Scientist-in-Charge for CERN.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
HL-LHC Project Kick-off Meeting Friday 15 th April 2011 Sylvain Weisz DG-DI-DAT on the behalf of the A&T Sector Projects Support Office.
HL-LHC Configuration Management Keywords : HW Baseline, Naming, Parameters, Layout DB, Change Control The HiLumi LHC Design Study (a sub-system of HL-LHC)
CERN Equipment Management Integrates Safety Aspects EDMS Doc Eva Sanchez-Corral Mena, Stephan Petit / CERN 1 CERN Equipment Management Integrates.
CLIC Project breakdown structure: organization, documentation and cost estimate Beam Instrumentation Workshop, June 2-3, 2009 CLIC Project breakdown structure:
Engineering Department ENEN What is changing in EN 1. Streamlining and boosting remote handling and manipulation activities 2. Bringing small works closer.
LHC Hardware Commissioning Review May 2005, CERN, 1211 Geneva 23 1 LHC Hardware Commissioning Review Contribution ID: 20 – Quality assurance and.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
Corporate Technical Infrastructure Management From MP5 to a Corporate Technical Infrastructure Management System.
Margarita Saifoulina BE/RF/SR. Outline Data Management EDMS & MTF for RF structures Future prospects for EDMS/MTF solution Data Management EDMS & MTF.
DPE CSSW Process Model Annex A WP-400 ECSS Case Study.
1 | 2010 Lecture 3: Project processes. Covered in this lecture Project processes Project Planning (PP) Project Assessment & Control (PAC) Risk Management.
C. Parente (HL-LHC Technical Quality Officer) Date:
Planned Document Management Improvements Rob McKercher, Iain Goodenow, George Angeli.
NCSX Systems Engineering Management Plan Peer Review Bob Simmons May 15, 2003.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
MTF - Travellers 28/2/2001 S. Mallon + P. Martel EDMS Doc Id Contents Problem and scope Timing of MTF usage Definition of a standard MTF Creation.
MTF – Manufacturing and Test Folder Large Scale Deployment of MTF Sonia Mallón Amérigo Elena Manola-Poggioli on behalf of the EDMS Team, TS-CSE.
LIU-PSB Configuration Management EDMS Documentation, Layout and ECRs Thomas Birtwistle EN-MEF-DC.
ST Quality WG I. Béjar Alonso Group Leader’s meeting 6th July.
Thermosiphon project management and quality assurance EN/CV/DC Presentation done by Elena Perez Rodriguez For further information contact
M. Battistin, J. Botelho – 20 October 2011EN/CV/DC Detector Cooling Project V Thermosiphon Workshop - Cost and Planning Michele Battistin Jose Botelho.
Project Breakdown Structure Tracing changes to our different baselines I. Bejar Alonso and Project Office TCC – 14 th January 2016.
Review of the processes released in the framework of the MMP Goran Perinić.
ELENA Documentation and Data Management Items, Assets, Functional Positions T. Birtwistle EN-ACE-CL With input from T. Krastev EN-ACE-EDM.
Report on database work for INB in ALICE Latchezar Betev (ALICE) Information Session INB – June 8, 2006.
Safety Documentation How do we organize it and what will be the contents? A. Funken, LIU Project Meeting, 26 th September 2013.
Follow-up to SFT Review (2009/2010) Priorities and Organization for 2011 and 2012.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
Product Lifecycle Management with the CERN EDMS David Widegren CERN, TS/CSE 8 Nov 2005EDMS:
HL-LHC Review of WP 1 Lucio Rossi – CERN 3rd general meeting for application 20 October 2010.
Cold mass procurement, status and plan, QA-QC H. Prin With contribution from S. Becle, O. Housiaux, R. Principe, J.-L. Rudeiros Fernandez, F. Savary 3.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
Logo area MQXF Review: Safety Thomas Otto HL-LHC Project Safety Officer With contributions by -Paolo Ferrcin and Ezio Todesco, TE-MSC -Francesca Viggiano,
S. Barbanotti - DESY Requirements Conformance for SRF Cryomodules Workshop 16/10/2014 – ESS, Lund XFEL cryostat main components: Quality Assurance and.
11T Quality Assurance O. Housiaux, R. Berthet, S. Menu, R. Principe 3rd International Review on the 11T dipoles at collimator Section for the HL-LHC 6-8.
Instrument Construction Phase 1 and beyond Rob Connatser Chief Instrument Project Engineer September, 2014.
LIU Configuration Management EDMS Documentation, Layout and ECRs This presentation follows the LIU-PSB specific presentation done on 9 th October 2014.
WP3 Quality Assurance Rosario Principe Richard Berthet, Olivier Housiaux, Sabine Menu, Paula Alvarez Lopez International Review of the Inner Triplet Quadrupoles.
Scope of PCP Phase 1: Solution Design of Q4 First-of-a-kind prototype QUACO Bid Conference, CERN, 07 th July 2016 Arnaud Foussat, CERN TE MSC-LMF Helene.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
CONFIGURATION MANAGEMENT AND CONTROL PLAN ESS Quality Assurance and Control workshop (30June) V. HENNION.
What’s It All About, SACM?
East Area Renovation Project Team meeting # 2 – EDMS News
Preparation of functional/engineering specifications for HL-LHC
Implementing the DESY EDMS
Documentation (XFEL Naming convention, uploading…)
Mauro Morandin & Antoine Daël
ESSI CHANGE AND nonconformity control SYSTEM
I&C requirements and configuration management
East Hall under construction
HL-LHC Quality management
Safety in the East Area Renovation Project
Presentation transcript:

HL-LHC Standards and Best Practices Workshop (11-13 June 2014)

2 Contents LHC QAP Documents/Templates Tools

HL-LHC Standards and Best Practices Workshop (11-13 June 2014) 3 What existed for the LHC The LHC project had a QAP that fixed some Quality parameters such as: Document Types and Naming Conventions Equipment Naming Convention Parts Ids Configuration management Design Process and Control Purchasing and Contracting Process and Control Manufacturing and Inspection of Equipment Handling of Nonconforming Eq. And several documents templates

HL-LHC Standards and Best Practices Workshop (11-13 June 2014) 4 What existed for the LHC Documentation was handled with EDMS, records with MTF … In EDMS there were several structures that adapted to the type of information. Only the Hardware Baseline followed the LHC QA naming convention. There was a dedicated team to ensure the quality of the documents uploaded on it

HL-LHC Standards and Best Practices Workshop (11-13 June 2014) 5 Document categories The document categories were based on the project life cycle processes

HL-LHC Standards and Best Practices Workshop (11-13 June 2014) 6 What to do in the meanwhile Set of simple rules compatible with the LHC QAP for the project on: Identification: what kind of document shall be managed Labelling: how the document shall be named Lifecycle: how shall be ensured the adequacy of the document before distribution Availability: how shall be ensured that the document arrives to the right person and can access it as long as required Traceability: how it is record the changes and location of the document

HL-LHC Standards and Best Practices Workshop (11-13 June 2014) 7 Example Visibility Document class Visibility Baseline documents All documents HL-LHC Project m./non released CERN access/released Non Baseline documents Technical documentsHL-LHC Project members Commercial, financial, resource oriented and with sensitive information Restricted access Scientific publicationsWorldwide OutreachWorldwide

HL-LHC Standards and Best Practices Workshop (11-13 June 2014) 8 Documents and templates

HL-LHC Standards and Best Practices Workshop (11-13 June 2014) 9 Systems life-cycle Decision gates (reviews)

HL-LHC Standards and Best Practices Workshop (11-13 June 2014) 10 Baseline documentation (1/2) EDMS: Project management Acquisition Technical

HL-LHC Standards and Best Practices Workshop (11-13 June 2014) 11 Baseline documentation (2/2) Safety File (see also presentation from J. Gascon & Th. Otto) EDMS: Project management Safety Technical Links to already existing documentation will be made, whenever required

HL-LHC Standards and Best Practices Workshop (11-13 June 2014) 12 Baseline documentation EDMS: Project management Acquisition Technical A template for each type of document A guide to fill in he document Examples for each type of template

HL-LHC Standards and Best Practices Workshop (11-13 June 2014) 13 Conceptual specifications

HL-LHC Standards and Best Practices Workshop (11-13 June 2014) 14 Functional Engineering Specification

HL-LHC Standards and Best Practices Workshop (11-13 June 2014) 15 Architecture

HL-LHC Standards and Best Practices Workshop (11-13 June 2014) 16 Processes

HL-LHC Standards and Best Practices Workshop (11-13 June 2014) 17 Building blocks

HL-LHC Standards and Best Practices Workshop (11-13 June 2014) 18 Eng. Specifications -> Procurement Requirements definition (conceptual specifications) Functional specifications Engineering specifications Contractual requirements Procurement (IT/DO template) In-house design, manufacture, assembly, tests Quality & Configuration management requirements Technicalrequirements

HL-LHC Standards and Best Practices Workshop (11-13 June 2014) 19 Safety Hazard identification

HL-LHC Standards and Best Practices Workshop (11-13 June 2014) 20 Launch Safety Agreement

HL-LHC Standards and Best Practices Workshop (11-13 June 2014) 21 Tools

HL-LHC Standards and Best Practices Workshop (11-13 June 2014) 22 EDMS structure (1/2) Repository of the HL-LHC baseline documentation (under the LHC hardware baseline, for which specific nodes will be created in case of new equipment)

HL-LHC Standards and Best Practices Workshop (11-13 June 2014) 23 EDMS structure (2/2) Each Work Package will have a pre-created EDMS structure based on its systems architecture and on the required contents of the baseline documentation Experiment Interface (WP8) TAXS ATLAS CMS LHCb Radiation shielding (ATLAS and CMS) TAXN ATLAS CMS LHCb  WBS  Schedule  APT  Procurement  Specifications  Design  Fabrication, Assembly and Verification  Installation-Commissioning  Operation & Maintenance  Dismantling  Safety File  (links to documents in upper nodes whenever required) Example

HL-LHC Standards and Best Practices Workshop (11-13 June 2014) 24 Other documentation Non-baseline, documentation (e.g., follow-up meetings, scientific publications) can be stored in the WP workspace Structure will be defined with each WP

HL-LHC Standards and Best Practices Workshop (11-13 June 2014) 25 Records

HL-LHC Standards and Best Practices Workshop (11-13 June 2014) 26 Too many?

HL-LHC Standards and Best Practices Workshop (11-13 June 2014) 27 Thank you for your attention ! Questions?