Harry Choi – Director, ASP Services

Slides:



Advertisements
Similar presentations
Upgrade services, hosting & business continuity Simpler is better: Delivering IT as a Service John Allen: Business Development Manager Anix Managed Services.
Advertisements

1 Building a Dynamic Datacenter with Oracle over NFS and NetApp Blackboard Managed Hosting (sm) Peter Waterman Senior Manager of Technology and Innovation.
Network Systems Sales LLC
What’s New: Windows Server 2012 R2 Tim Vander Kooi Systems Architect
MUNIS Platform Migration Project WELCOME. Agenda Introductions Tyler Cloud Overview Munis New Features Questions.
Skyward Disaster Recovery Options
Protect Your Business and Simplify IT with Symantec and VMware Presenter, Title, Company Date.
Harris LiveVault® Online Backup System. Harris LiveVault 2  What is Harris LiveVault?  Why Harris LiveVault?  How Harris LiveVault works  Harris LiveVault.
VERITAS Confidential Disaster Recovery – Beyond Backup Jason Phippen – Director Product and Solutions Marketing, EMEA.
Backup and Disaster Recovery (BDR) A LOGICAL Alternative to costly Hosted BDR ELLEGENT SYSTEMS, Inc.
© 2009 EMC Corporation. All rights reserved. Introduction to Business Continuity Module 3.1.
High Availability 24 hours a day, 7 days a week, 365 days a year… Vik Nagjee Product Manager, Core Technologies InterSystems Corporation.
1 Disk Based Disaster Recovery & Data Replication Solutions Gavin Cole Storage Consultant SEE.
Mainframe Replication and Disaster Recovery Services.
June 23rd, 2009Inflectra Proprietary InformationPage: 1 SpiraTest/Plan/Team Deployment Considerations How to deploy for high-availability and strategies.
1 © Copyright 2010 EMC Corporation. All rights reserved. EMC RecoverPoint/Cluster Enabler for Microsoft Failover Cluster.
1© Copyright 2011 EMC Corporation. All rights reserved. EMC RECOVERPOINT/ CLUSTER ENABLER FOR MICROSOFT FAILOVER CLUSTER.
MCTS Guide to Microsoft Windows Server 2008 Network Infrastructure Configuration Chapter 11 Managing and Monitoring a Windows Server 2008 Network.
1 Disaster Recovery Planning & Cross-Border Backup of Data among AMEDA Members Vipin Mahabirsingh Managing Director, CDS Mauritius For Workgroup on Cross-Border.
© Hitachi Data Systems Corporation All rights reserved. 1 1 Det går pænt stærkt! Tony Franck Senior Solution Manager.
Elad Hayun Agenda What's New in Hyper-V 2012 Storage Improvements Networking Improvements VM Mobility Improvements.
November 2009 Network Disaster Recovery October 2014.
NDPSB Secondary Data Center Rack Design and Layout.
Treasury in the Cloud Bob Stark – Vice President, Strategy September 17, 2014.
1 Introduction to Cloud Computing Jian Tang 01/19/2012.
LAN / WAN Business Proposal. What is a LAN or WAN? A LAN is a Local Area Network it usually connects all computers in one building or several building.
Chapter 10 : Designing a SQL Server 2005 Solution for High Availability MCITP Administrator: Microsoft SQL Server 2005 Database Server Infrastructure Design.
Maintaining a Microsoft SQL Server 2008 Database SQLServer-Training.com.
Bob Thome, Senior Director of Product Management, Oracle SIMPLIFYING YOUR HIGH AVAILABILITY DATABASE.
IT Business Continuity Briefing March 3,  Incident Overview  Improving the power posture of the Primary Data Center  STAGEnet Redundancy  Telephone.
Business Continuity and Disaster Recovery Chapter 8 Part 2 Pages 914 to 945.
© Novell, Inc. All rights reserved. 1 PlateSpin Protect Virtualize your Disaster Recovery.
Module 12: Designing High Availability in Windows Server ® 2008.
Presented by: Ahmar Abbas, Director, Blackboard ASP Services Managing Mission Critical Applications Blackboard ASP SM Perspective April 13, 2005.
Chapter 8 Implementing Disaster Recovery and High Availability Hands-On Virtual Computing.
IT Infrastructure Chap 1: Definition
David N. Wozei Systems Administrator, IT Auditor.
Keys to Successful Beta Testing Presented by Ron Dinwiddie, Product Director, Blackboard Commerce Suite™ Jessica Finnefrock, Product Director, Blackboard.
NOAA WEBShop A low-cost standby system for an OAR-wide budgeting application Eugene F. Burger (NOAA/PMEL/JISAO) NOAA WebShop July Philadelphia.
©2006 Merge eMed. All Rights Reserved. Energize Your Workflow 2006 User Group Meeting May 7-9, 2006 Disaster Recovery Michael Leonard.
Chapter © 2006 The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/ Irwin Chapter 7 IT INFRASTRUCTURES Business-Driven Technologies 7.
Hosted by Why You Need a Storage Management Organization Ray Paquet Vice President & Research Director Gartner.
The ProactiveWatch Monitoring Service. Are These Problems For You? Your business gets disrupted when your IT environment has issues Your employee and.
Module 13 Implementing Business Continuity. Module Overview Protecting and Recovering Content Working with Backup and Restore for Disaster Recovery Implementing.
Microsoft Azure SoftUni Team Technical Trainers Software University
Disaster Recovery and Business Continuity Planning.
McLean HIGHER COMPUTER NETWORKING Lesson 15 (a) Disaster Avoidance Description of disaster avoidance: use of anti-virus software use of fault tolerance.
1 IBM TIVOLI Business Continuance Seminar Training Document.
Service Level Agreements Service Level Statements NO YES The process of negotiating and defining the levels of user service (service levels) required.
Windows Azure Virtual Machines Anton Boyko. A Continuous Offering From Private to Public Cloud.
High Availability Technologies for Tier2 Services June 16 th 2006 Tim Bell CERN IT/FIO/TSI.
Disaster Recovery: Can Your Business Survive Data Loss? DR Strategies for Today and Tomorrow.
Capacity Planning in a Virtual Environment Chris Chesley, Sr. Systems Engineer
The VERSO Product Returns Portal Incorporates Office 365 Outlook and Excel Add-Ins to Create Seamless Workflow for All Participating Users OFFICE 365 APP.
Office 365 is cloud- based productivity, hosted by Microsoft. Business-class Gain large, 50GB mailboxes that can send messages up to 25MB in size,
© 2012 Eucalyptus Systems, Inc. Cloud Computing Introduction Eucalyptus Education Services 2.
PHD Virtual Technologies “Reader’s Choice” Preferred product.
Microsoft Connect /23/ :39 PM
Blackboard Security System
Office 365 is cloud-based productivity, hosted by Microsoft.
High Availability 24 hours a day, 7 days a week, 365 days a year…
Atlas Lee, CBCP Director Of Business Continuity
Agenda Backup Storage Choices Backup Rule
MUNIS Platform Migration Project
CCNET Managed Services
How to prepare for the End of License of Windows Server 2012/R2
What Do We Do? Managed IT services
Storage Trends: DoITT Enterprise Storage
SpiraTest/Plan/Team Deployment Considerations
Atlas Lee, CBCP Director Of Business Continuity
Presentation transcript:

Disaster Recovery Planning: Sharing Experiences from Blackboard ASP Services Harry Choi – Director, ASP Services Jonas Hirshfield – Director, ASP Infrastructure Operations © Blackboard, Inc. All rights reserved.

About Forward-Looking Statements Any statements in this presentation about future expectations, plans and prospects for Blackboard and other statements containing the words “believes,” “anticipates,” “plans,” “expects,” “will,” and similar expressions, constitute forward-looking statements within the meaning of The Private Securities Litigation Reform Act of 1995. Actual results may differ materially from those indicated by such forward-looking statements as a result of product development changes and other important factors discussed in our filings with the SEC. We may make statements regarding our product development and service offering initiatives, including the content of future product upgrades, updates or functionality in development.  While such statements represent our current intentions, they may be modified, delayed or abandoned without prior notice and there is no assurance that such offering, upgrades, updates or functionality will become available unless and until they have been made generally available to our customers.

Agenda: Blackboard ASP Services Introduction MTTR Planning vs. Disaster Recovery Planning for Disaster Recovery: Defining the Definition Setting up the Requirements Planning & Testing

Blackboard ASP Services Introduction Over 450+ Customers from All Market Sectors 4 Datacenters – 2 in Northern Virginia; 1 in Vancouver; 1 in Amsterdam Over 4 Million Users in our Systems – Over 3 Million Active Users 1500+ Servers, 250 TB Storage Capacity & Growing 7 Terabytes of Data Transferred Daily 100 Million + HTTP Requests Served Per Day at Peak Times Blackboard Academic SuiteTM, Blackboard Commerce SuiteTM, Email Hosting 99.7% or Better Uptime Guarantee

Blackboard ASP Clients 450+ Clients from All Market Sectors

Fully Managed Service: Backed by Team of Experts

What is “Disaster Recovery”? “Ability to recover from the loss of a complete site, whether due to a natural disaster or malicious intent.” “A plan of action to recover from an unlikely event of a severe or catastrophic business disruption.” It’s NOT a planning for Mean-Time-To-Recovery (MTTR) from daily operational risks.

MTTR Choices: Recovery-Oriented Scalable Infrastructure On-Demand, Redundant Scaling Technologies Use of attached clustered storage allows quick use of client growth 2N Redundancy at Core Infrastructure Level Burstable, Redundant Internet Connectivity Load Balancing Dual Core CPU, Caching, Hyper-threading Clustering Technology Recovery Oriented Choices: Autonomic Capabilities – Datacenter / Network / Systems Warm Standby (rack, stacked and powered up) SnapMirror Technologies Oracle DataGuard & RMAN Technologies Cold Standby “Platinum” Service Contracts from Service Providers and Vendors N+1 Redundancy capabilities at client level It’s All About Tolerance for MTTR vs. Costs

Bb ASP Network Highly available network design No single point of failure at Infrastructure layer Quarterly Infrastructure Testing Maintenance with minimal downtime Enterprise class hardware devices Clustered Network Appliance Storage Foundry Routers and Switches Juniper Firewall/VPN Tipping Point IPS NetScaler Load Balancers Infloblox hardened DNS Appliances Optional Security Services VPNs for secure data transfer SSL for encrypted access

Levels of Data Backups 1st level backup: using snapshot technology, file systems & database backed up on Network Attached Storage systems 2nd level backup: using NetApp NearStore devices, 1st level backups are stored online, off-site for 30 days 3rd level backup: weekly backups are stored in tape, off-site for 30 days

Monitoring Tools for Proactive Management Key Performance Metrics polled every 5 minutes cpu = 5-minute load average disk = % free on local mount points nfs = % free on NFS mount points msgs = scanning syslog for key words memory = real, virtual and swap procs = scanning ‘ps’ output Obak = Oracle backup status ofiles = Oracle data/index file sizes files = other file/directory sizes svcs = Windows Services checking Application Check for Response Time

Disaster Recovery Requirements Set the institution’s definition of “disaster” Driven by Business Impact Priority of Mission Critical Applications Define Requirements Set Threshold for Recovery

Questions to Consider: What is the threshold on recovery time (RTO) and recovered data (RPO)? What is the objective during disaster recovery period: Minimum Basics function – i.e. online materials availability and course continuation? Full Production Availability, including LDAP, Customizations/Building Blocks availability? What is the plan for post-DR? How does Blackboard ASP Service address the Management & Monitoring factor? By operating 24 x 7 with dedicated, experienced personnel.

ASP Business Continuity Service Offering: Recovery Time Objective (RTO) RTO is the time-measured objective to have the Blackboard Business Continuity Service operation up and running from the point in time that Blackboard is made aware of the client’s primary Blackboard applications system failure. Recovery Point Objective (RPO) RPO is the objective to minimize the loss of the client’s database and file storage content by constantly backing up the client’s information no less than the time guaranteed under each service level. Customizations & Configuration Dependent on Client’s requirement and RTO & RPO objectives How does Blackboard ASP Service address the Management & Monitoring factor? By operating 24 x 7 with dedicated, experienced personnel.

Business Continuity Service Levels Recovery Time Objective (RTO) Recovery Point Objective (RPO) Customization & Configuration Locally hosted client: Weekly backup service 24 hours Last backup less than 8 days Fully backed up (if possible) Monthly backup service 72 hours Last backup less than 32 days Rebuild Incident-based service 120 hours Latest backup received N/A Blackboard ASP hosted client: Level 3 Service 6 hours 3 hours Level 2 Service Last backup less than 12 hours Level 1 Service Last backup less than 24 hours

Business Continuity Service Offering: Testing & Collaboration During Setup Customized Service Building Blocks, LDAP, & other considerations Simulation Tests Once a Year Database Server(s) is dedicated & App Servers are Reserved In DR situation, Service up for 30 days Client Audit of Datacenter & Operation Welcome How does Blackboard ASP Service address the Management & Monitoring factor? By operating 24 x 7 with dedicated, experienced personnel.

Disaster Recovery Option Optical Fiber Ring Private Zone Public Zone Private Zone Public Zone Blackboard ASP VA1 Facility Blackboard ASP VA2 Facility

Disaster Recovery – Client Options Client Application Content Use of Network Appliance’s Snapmirror technology to mirror client application data in real time across facilities. Dedicated standby hardware Client Oracle Content Traditional Oracle Exports. Long RTO & RPO Oracle RMAN Technology Long to Medium RTO & RPO Warm dedicated Standby Server Oracle DataGuard – Best RTO & RPO Hot dedicated standby server

The Human Factor: Rigorous & Regular Training Redundancy in Skill Sets Plan for loss of critical staff in a DR event. Change Management Control Tools – Central Authentication System, Automated Scripts, Documentation, etc. Readiness Tests – e.g. Fall Preparation Readiness Testing Perform routine testing to ensure technology is working as expected Documentation Disaster recovery procedures should be well documented. Plan for the unexpected. Loss of critical staff No Physical Access to the facility Loss of traditional internet access to the facility Install POTS line with serial connections to infrastructure

Questions? Comments?