Quarterly Report on NTDC Development Projects

Slides:



Advertisements
Similar presentations
Central California Clean Energy Transmission Project PCC Meeting Vancouver, BC October 24, 2007.
Advertisements

Study Committee Representatives Annual Report December, 2012
New Energy Horizons Opportunities and Challenges Fault Current Contributions from Wind Plants Dean Miller PacifiCorp July 25,
FUTURE NTDC PROJECTS UPTO
Monthly Progress Report on NTDC Development Projects for May, 2013
Company LOGO Cleco Planning Process. Models Cleco uses SPP’s annual series of models to determine the NERC reliability violations. Cleco uses SPP or VST.
The Power Grid ELEC 403 The Citadel Mark McKinney.
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED PLANNING POWER Monthly Progress Report on NTDCL Development Projects for September, 2013.
NTDC Projects for which Financing is Required
SR #. NAME OF NEW SUBSTATIONS T/F CAP. (MVA) ASSOCIATED TRANSMISSION LINES ESTIMATED COST (Rs.in Million) Eqt. US$ in Million REQUIRED YEAR OF COMMISSIO-
1 Entergy Louisiana, Inc. (North) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED PLANNING POWER MONTHLY PROGRESS REPORT on NTDC DEVELOPMENT PROJECTS for January, 2013.
PAKISTAN POWER SECTOR BACK-GROUND, PRESENT SITUATION & FUTURE PLANS.
Brief on HVDC 2015 Brief on HVDC 2015
High Voltage Engineering
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
1 1 Substation Asset Strategy Kevin Dasso, Senior Director Engineering and Operations IEEE/PES Annual Substations Committee Meeting April 7, 2008.
SR #. NAME OF NEW SUBSTATIONS T/F CAP. (MVA) ASSOCIATED TRANSMISSION LINES ESTIMATE D COST* (Rs.in Million) Eqt. US$ in Million REQUIRED YEAR OF COMMISSIO-
NTDC FUTURE PROJECTS WHERE FINANCING HAS BEEN LINED UP
THE VERIFICATION OF SHUNTING METHOD FOR LIMITATION OF EARTH FAULT CURRENT IN MV COMPENSATED NETWORKS Petr TOMAN Jaroslava ORSÁGOVÁ David TOPOLÁNEK Vladimír.
1 PROJECTS IN THE PIPELINE IN SOUTHERN REGION. 2 PROJECTS IN PROGRESS IN SOUTHERN REGION 400 KV MADURAI-TRIVANDRUM LINE WITH 400 KV SS AT TRIVANDRUM 400.
PROJECTS IN THE PIPELINE IN SOUTHERN REGION. PROJECTS IN THE PIPELINE IN SR GENERATION EVACUATION PROJECTS GENERATION EVACUATION PROJECTS GENERATION EVACUATION.
FUTURE NTDC PROJECTS UPTO
Africa Geospatial Forum Geospatial Empowering Utilities.
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED QUARTERLY REPORT ON FUTURE NTDC PROJECTS UPTO For The Quarter Ending Dec.2012 PLANNING POWER.
1 Green River Utah Area Transmission and Distribution System – January 16, 2009.
RTP Update RPG Meeting July 21, RTP update  Reliability analysis for the contingencies where load shed is not allowed is complete.
111 TAG Meeting June 8, 2015 Teleconference / Webinar FINAL.
INDIAN POWER SECTOR. ADMINISTRATION AND MANAGEMENT As per Constitution of India, Electricity comes under concurrent list i.e. the development and management.
Transmission System in India
1 GEPCO 2 nd WORKSHOP ON POWER SECTOR REFORMS November 11 & 12, 2010.
Report on the NCTPC 2006 Collaborative Transmission Plan Mark Byrd, Manager – Transmission Planning Progress Energy Carolinas, Inc January 25, 2007.
NATIONAL TRANSMISSION AND DESPATCH COMPANY (NTDC) NTDC DEVELOPMENT PROGRAM PLANNING POWER (NTDC) PEPCO January 2012.
Pallatana-Bongaigaon Transmission System. 2 Generation Project Summary  Pallatana (726.6 MW): being implemented by OTPC –Unit - 1 : Dec-2011 –Unit -
Preliminary Studies of the Electric Power Distribution for CLIC
ELG4125 Transmission and Distribution Systems
APPLIED ELECTRICITY SS3
Presenter: Peter Busch
Arizona ACC Biennial Transmission Assessment Navajo Transmission Project Update May 22, 2008 Presentation by Ben Hoisington Project Administrator, DPA.
Paint Your Districts Prepared by: Information Management Unit FAO, Pakistan Contact for more information: 1.To edit the districts with.
N.A. ZUBERI MANAGING DIRECTOR PRIVATE POWER & INFRASTRUCTURE BOARD October 22, 2011 “CONVERSION OF EXISTING THERMAL POWER PLANTS TO COAL” INTERNATIONAL.
Khoo Yihan | Chua Cong Yang | Park Seong Jin.  Electricity is generated in power stations at 11000V to 33000V and then stepped up to V by transformers.
Iraqi kordistan Region Iraqi kordistan Region Click Click Back Iraq Map.
October 16, 2009 RPG Meeting ERCOT 2009 Five-Year Transmission Plan Update Jeff Billo.
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED QUARTERLY REPORT ON FUTURE NTDC PROJECTS UPTO For The Quarter Ending March, 2013 PLANNING POWER.
INVESTMENT OPPORTUNITIES IN POWER SECTOR OF PAKISTAN
LCRA TSC/ CPS Energy Transmission System Addition Regional Planning Group Project Jeff Billo Sr. Manager, Transmission Planning TAC ERCOT Public March.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
National Integrated Power Project Update Presentation to the Presidential Power Sector Workshop on May Niger Delta Power Holding Company Limited.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
SEMINAR ON ENERGY: ELECTRICITY TRANSMISSION A presentation to the KENYA – SPAIN MULTILATERAL PARTNERSHIP MEETING By Dr. (Eng.) John M. Mativo Chief Manager.
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED PLANNING POWER DEPARTMENT MONTHLY REPORT ON NTDC DEVELOPMENT PROJECTS PLANNING POWER May, 2012.
NTDC ONGOING DEVELOPMENT PROJECT SR. NO. NAME OF SUBSTATIONS TRANSFORMER CAPACITY (MVA) ASSOCIATED TRANSMISSION LINES EXPECTED COMMISSIONING 1 Ext. at.
2006 Preliminary Reliability Study Results Bryan Guy September 7, 2006.
PKP Energetyka S.A. - References. Tracks Overhead traction linesPower Automation Civil engineering facilities Buildings and platforms DesignRemaining.
China-Pakistan Economic Corridor (CPEC)
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
2016 RTP Update November, 2016 RPG Meeting.
Rocky Mountain Power Five Year Study Findings & Kick Off Meeting
Study Committee Representatives Annual Meeting October 18, 2010 Winnipeg SC B4 “HVDC and Power Electronics” Activity Report Presented by: John McNichol.
Existing Power Systems of HPSEBL
Energy Sector Pakistan
EE6501 POWER SYSTEM ANALYSIS
PROJECTS IN THE PIPELINE IN SOUTHERN REGION
Design of Electric Power Systems and Utilities
Power Generation Sector OF Pakistan
BRIEFING ON THE INTERCONNECTION LINES OF THE
Power System Analysis (EELE 4351)
ILO Industrial Opportunities Days, 6-7 June 2019
Main needs of electricity system of the Czech Republic
Presentation transcript:

Quarterly Report on NTDC Development Projects NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED Quarterly Report on NTDC Development Projects June,2014 PLANNING POWER NTDC

NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED Sr. No. Name of the Projects Scope of work Estimated Cost PC-I Status Expected Completion MRs. MUS$ 1- Power Dispersal from 1200 MW Thar Coal Based Power Plant 500 kV Thar – Matiari D/C T/L (250 km) 22,306 237 Approved by ECNEC on 16.08.2012 2015-16 Two line bays with Shunt Reactors at 500 kV Matiari Switching Station. 2- 220 D.I.Khan 220kV sub station with 220/132kV 2x250 MVA T/Fs along with allied equipment. 3,779 44 Approved by ECNEC on 09.12.2010 220 kV D/C T/L for In/Out of 220 kV Chashma Nuclear-Ludewala S/C T/L at D.I Khan (100km) PLANNING POWER

NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED Sr. No. Name of the Project Scope of Work Estimated Cost PC-I Status Expected Completion (MRs) (MUS$) 3- Extension/Augmentation of 500/220kV Rewat substation Addition one 250 MVA 220/132 kV T/F. Augmentation of two 160 MVA 220/132kV T/Fs to 2x250MVA T/Fs 844 8 PC-I under approval 2015-16 4- Dispersal of Power From 147 MW Patrind Hydro Power Project 132 KV Patrind - Mansehra D/C T/L (45 km) 966 10 I/O of 132 kV Patrind - Mansehra S/C at Balakot (10 km) I/O of 132 kV D/C Patrind - Mansehra G/S at Muzaffarabad-II (15 km) PLANNING POWER

NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED Sr. No. Name of the Projects Scope of Work Estimated Cost PC-I Status Expected Completion (MRs) (MUS$) 5- 220 kV Transmission system reinforcement in Islamabad and Burhan area Replacement of existing 220 kV Tarbela – Burhan D/C T/L with new line on twin bundle Rail Conductor (35.1 km) 3568 36 PC-I under approval 2015-16 Replacement of existing 220 kV Tarbela – Burhan – ISPR D/C T/L with new line on twin bundle Rail Conductor (62.5 km) In/Out of one circuit of 220kV Mansehra- ISPR D/C Transmission line at Islamabad University Substation (40 km) 6- 500 kV Faisalabad West (Phase-II) 500kV D/C T/L for In/Out of 500 kV Multan-Gatti S/C at 500 kV Faisalabad West (30 km) 4338 43 PC-I under approval 2016-17 220kV D/C T/L from 500 kV Faisalabad West to 220 kV Lalian New (80km) PLANNING POWER

NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED Sr. No. Name of the Projects Scope of Work Estimated Cost PC-I Status Expected Completion (MRs) (MUS$) 7- 500 kV system reinforcement for evacuation of Power from 6600MW Imported Coal Based Plants at Gadani (HVAC Component) Five 500 kV D/C T/Ls from Power Plants to Gadani collector station (20 km each) 79287 795 PC-I under preparation 2017-18 500 kV HVAC T/L for In/Out of Lahore – Ghakhar at Lahore North (50 km) 500 kV Faislabad West - Ludewala – Peshawar D/C T/L (425 km) 500 kV Gadani – NKI – Moro D/C T/L (330 km) 500 kV D/C T/L for I/O of Hub – Jamshoro at Gadani (6 km) Two 500 kV D/C T/L for In/o of Sahiwal – Lahore south at Convertor station ( 25 km each) 500 kV Lahore North – Lahore South (70 km) 500 kV substation at Lahore North, 500 kV switching stations Ludewala and extensions at different grid stations. PLANNING POWER

NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED Sr. No. Name of the Project Scope of Work Estimated Cost PC-I status Expected Completion (MRs) (MUS$) 8- 500 kV Islamabad West 500 kV sub station with 2x750 MVA 500/220 kV and 3x250 MVA 220/132 kV T/Fs and allied equipment. 7935 79 PC-I under approval 2017-18 In/Out of 500 kV Tarbela – Rewat S/C at Islamabad West (12km) In/Out of 500 kV G/Barotha–Rewat S/C at Islamabad West (15 km) In/Out of 220 kV Tarbela–ISPR S/C at Islamabad West (15km) In/Out of 220 kV Mansehra/Islamabad University–ISPR D/C at Islamabad West (15km) 9- 220 kV M-3 Industrial Estate Faisalabad 220kV sub station with 2x250 MVA 220/132 kV T/Fs and allied equipment. 5512 52 PC-I under preparation 220 kV M3 Industrial Estate–Faisalabad New (70 km) In/Out of 220 kV Faisalabad West-Lalian at 220 kV M3 Industrial (30 km) PLANNING POWER

NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED Sr. No. Name of the Projects Scope of work Estimated Cost PC-I status Expected Completion (MRs) (MUS$) 10- 220 kV Mirpur Khas 220kV sub station with 2x250 MVA 220/132 kV T/Fs and allied equipment. 4580 43 Studies in progress 2016-17 I/O of 220kV Hala Road-T.M Khan Road D/C T/L at Mirpur Khas (70 km) 11- 220 kV Chakwal 220kV sub station with 2x250 MVA 220/132 kV T/Fs and allied equipment. 4150 39 -do- In/out of 220 kV Mangla-Rewat S/C at Chakwal (60 km) 12- 220 kV Mastung 220kV sub station with 2x250MVA 220/132 kV T/Fs and allied equipment. 6153 58 220kV D/C T/L from Mastung to Sibbi (120 km) 13- 220kV GIS Shadman 3180 30 2220 kV D/C cable from Shadman to Bund Road (30km) PLANNING POWER

NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED Sr. No. Name of the Project Scope of Work Estimated Cost PC-I status Expected Completion (MRs) (MUS$) 14- Dispersal of Power From Dasu Hydro Power Project 500 kV D/C T/L from Dasu to Palas (35 km) 127200 1205 PC-I under preparation 2017-18 500 kV D/C T/L from Palas to Mansehra (105 km) 500 kV D/C T/L from Mansehra to Islamabad West (100 km) 500 kV D/C T/L from Mansehra to Faisalabad West with 40% series compensation (375 km) 500 kV Switching Station at Mansehra Extension at Islamabad and Faisalabad West PLANNING POWER

NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED Sr. No. Name of the Project Scope of Work Estimated Cost PC-I status Expected Completion (MRs) (MUS$) 16- Evacuation of Power from 1320 MW Bin Qasim Project 500 kV Double circuit T/Line from Bin Qasim PP to Matiari switching station(180 km) 14163 143 PC-I submitted to MoW&P 2017-18 Extension at 500 kV Matiari switching station (two line bays and shunt reactor) 17- Evacuation of Power from 1320 MW Imported Coal based PP at Sahiwal 500 kV Double circuit T/line for In/Out of Sahiwal-Lahore Single circuit at Sahiwal PP (0.5 km) 1567 16 PC-I under preparation Addition of 1x600 MVA 500/220 kV transformer at 500 kV Sahiwal (Yousafwala) 15- 500 kV Alliot Switching and Evacuation of associated HPPs 500 kV D/C T/L from Suki Kinari to Alliot (100 km) 18,558 176 2019-20 500 kV D/C T/L from Alliot to Islamabad West (96 km) 500 kV Switching Station at Alliot Total Cost 308066 3014 PLANNING POWER