1 Existing Power Systems of HPSEBL
Installed Capacity MW Villages Electrified Nos. Hamlets Electrified Nos. Consumers Connected lakh Connected Load kW EHV Sub-Stations 37 Nos. HV (33 kV) Sub Stations Nos. Distribution Sub-Stations Nos. EHV Lines ckt Km HT Lines ckt Km LT Lines ckt kM 1

2 Existing EHV Systems Power System EHV Sub-Stations 37 Nos.
Total Transformation Capacity MVA EHV Lines 220 kV Lines ckt. Km 132 kV Lines ckt .Km 66 kV Lines ckt. Km 2

3 ~ Giri-Paonta-Kala Amb Area Baddi-Barotiwala-Nalagarh Area Samoli
400kV Nalagarh to Kunihar Line [630 MVA] Samoli 66/22 kV S/Stn. (Andhra) 220kV Nalagarh (PGCIL-HPSEB) [200MVA] 400/220kV Nalagarh (Powergrid) 2x315 MVA Uparla Nangal 220/66kV (1x80/100)MVA, 400kV Kunihar 220/132/ 33kV Kunihar 66 kV S/C line on D/C Towers [35Km.] Baddi S/Stn. # Aug. of 220/66kV, 2x80/100MVA Xfmrs to 2x160/200MVA # Addition of 220/33kV, 1x25/31.5MVA Akanwali 66/33/11kV, S/Stn. 2x20MVA 66/22 kV Hulli S/Stn. (Kotkhai) LILO of Hatkoti - Nalagarh Line at Moginand [1.6Km.,100MVA] LILO of one Ckt. Hatkoti- Moginand-Nalagarh line at Baddi [2.75Km., 200MVA] Gondpur 220/132kV, S/Stn. 1x80/100 MVA (New) 66 kV S/C line on D/C Towers Wolf conductor [4Km.,20MVA] Devani 220/132/66kV 2x10 MVA, un-manned S/Stn. (New) Moginand 220/ 132kV, S/Stn. 2x100 MVA Kala Amb 132/33/11kV S/Stn. S/C line on D/C towers Kala Amb to Moginand/Devani [5KM.] Girinagar 220/132/33 kV S/Stn. # Aug. of 132/33kV, 1x16/20MVA Xfmr to 1x25/31.5MVA # Aug. of 220/132kV, 2x63MVA Xfmrs to 2x80/100MVA LILO of one Ckt. of 220kV D/C Hatkoti-Moginand line at Giri [2Km.,74MVA] Paonta 132/33/11 kV, S/Stn. # Aug. of 132/33kV Xfmrs from 2x16MVA to 2x25/31.5MVA # Replacement of 132/11kV, 16MVA transformer bank with x25/31.5MVA Hatkoti 66/22 kV S/Stn. ~

4 Una-Rakkar-Tahilwala-Sansarpur Terrace Area
Kangra 132/33/11kV S/Stn. # Aug. of 132/33kV, 1x9MVA transformer to 25/31.5MVA Amb S/Stn. # Replacement of 132/33kV, 1x16MVA Xfmr with 1x25/31.5MVA Anu (Hamirpur-I) 132/33/11 kV S/Stn. # Replacement of 132/33kV, 1x25MVA Xfmr with 1x25/31.5MVA Xfmr at 132/33kV, 2x25MVA Jassore 220/132/33kV S/Stn. 1x150MVA, 1x25/31.5 MVA 220kV D/C line Kangoo-Mattansidh-Jassore with twin Zebra Conductor (220kV Ring Main System)[155Km.] Una 132/66/33/11 kV S/Stn. # Aug. of 132/33kV Xfmrs from 2x16MVA to 2x25/31.5MVA Mattansidh (Hamirpur-II) 220/132 kV S/Stn., 2x80/100 MVA Kandrori 132/33/11 kV S/Stn. # Addition of 132/33kV, 1x16MVA Xfmr at 132/33kV, 2x16MVA Gagret S/Stn. # Aug. of 132/33 kV, 1x16MVA Xfmr to1x25/31.5MVA and 132/11kV, 1x16MVA Xfmr to 1x25/31.5MVA line on D/C tower[28Km., 63MVA] 132kV S/C Una-Tahliwala 132kV, S/C Kandrori-Sansarpur Terrace line on D/C towers [50Km.,31.5MVA] Jahoo 132/33kV, 31.5 MVA S/Stn. (New) Tahliwala 132/33kV, 31.5MVA S/Stn. (New) LILO of 132kV Mattansidh -Kangoo line at Jahoo [6.5Km., 31.5MVA] Sansarpur Terrace 132/66kV, 31.5MVA S/Stn. at Kangoo 220/132/33 kV S/Stn., 1x80/100 MVA 2x25/31.5 MVA

5 HV & LV DISTRIBUTION NETWORK
Sr. No. Description Operation Wing Total South North Central 1 HT Lines (Kms.) 10560 9922 7987 28469 2 L.T. Lines (Kms.) 20460 15975 16795 53230 3 33/11kV S/S (Nos.) 29 54 63 146 4 22kV C/P S/S (Nos.) 37 39 5 11 kV DTRs (Nos.) 6613 8564 7180 22357 6 Connected Load (MVA) 2698 1537 1201 5436 7 No. of Consumers 621569 690894 658625 5 5

6 Rajiv Gandhi Grameen Vidyutikaran Yojna
Under RGGVY flagship program undertaken by HPSEBL schemes worth Rs.341 Cr. are in progress in all the 77 blocks of the 12 districts of HP. The scheme provides for: Electrification of all the remaining 109 un-electrified villages in the Pradesh (2001 census). Erection of about 2000 Km of high voltage i.e. 33kV, 22kV & 11kV lines, 5900 Kms of L.T. lines and erection of 2092 Distribution Transformers to strengthen the distribution network in rural areas. Access of electricity households including BPL families 6

7 Rajiv Gandhi Grameen Vidyutikaran Yojna
Progress: Up to against the sanctioned amount of Rs. 319 Cr. about Rs. 270 Cr. have been released by REC and expenditure to the tune of Rs. 219 Cr. has been incurred. The work in 67 out of 77 blocks is almost complete and in terms of districts the work shall be completed in all respects in 9 districts i.e. Chanba, Solan, Una, Sirmaur, Hamirpur, Bilaspur, Mandi & Kangra by June 2011 and in the remaining districts namely Kullu, Kinnaur, and Lahul-Spiti by July 7