Click to edit Master title style Estonian cost optimal calculation and implementation in the code 14.03.2013 CA-EPBD III Madrid Jarek Kurnitski Professor,

Slides:



Advertisements
Similar presentations
eQuest Quick Energy Simulation Tool
Advertisements

ENERGY STAR Multifamily High Rise Program
Heating, Ventilating, and Air-Conditioning
Tas seminar/demonstration on Part L 2006 of the Building Regulations Presented by Alan Jones EDSL February
© Fraunhofer IBP Auf Wissen bauen Energy vs exergy use in buildings Fraunhofer Institute for Building Physics (IBP) Department Energy Systems Christina.
Summary of Heat Loss Calculations Assessing overall heating requirements for building (E) Component U-ValueAreaHeat Loss Rate (W o C -1 ) Walls U walls.
The VKR Group’s eight DEMO houses #1 Sustainable House of the Future – Active House 2020 Gitte Gylling Sørensen Industrial PhD at the VKR Group’s eight.
Click to edit Master title style Cost optimal facade design solutions of office buildings Tallinn Martin Thalfeldt PhD student in TUT
Standardization in the Green Buildings field Overall energy performance of buildings Dick (H.A.L.) van Dijk, Senior Scientist at Netherlands Organisation.
Swiss Federal Office of Energy SFOE IEA HPP Annex 32 Institute of Energy in Building1 IEA HPP Annex 32 Economical heating and cooling systems for low energy.
Heating energy calculation methods Anti Hamburg Lecture TTK-UAS.
Energy in Focus Energy Savings with Water Based Systems By Maija Virta Specialist of Indoor Environment Technology.
CLIMA 2010 May 10, 2010 | Energy Performance of Buildings | PAGE 1 Dr. Hicham LAHMIDI Optimization method using genetic algorithms for designing high performance.
RETScreen® Energy Efficiency Projects
Presentation SOLANOVA, January 2003 Department of Building Energetics and Service Systems Department of Energetics and Energy Systems Budapest University.
Engert, Scheriau, Wimmer SS 2010 Energy and sustainable development, Prof. Schleicher.
Performance-based demands ID seminar October Steffen Petersen PhD-student BYG.DTU and Birch & Krogboe.
1 Smart control of multiple energy commodities on district scale Frans Koene Sustainable places, Nice, 1-3 Oct 2014.
REHVA nZEB technical definition – 2013 revision
Energy use in buildings Dr. Atila Novoselac Associate Professor Department of Civil, Architectural and Environmental Engineering, ECJ
CHANGES IN THERMAL ENERGY CONSUMPTION IN APARTMENT BUILDINGS OF ESTONIA Teet-Andrus Kõiv,
17 May 2011 | Rome | PAGE 1 > Dominique Caccavelli, Energies renouvelables, CSTB Implementation of the EPBD in Europe ELIH-MED.
Towards Net Zero Energy Buildings: Dynamic Simulation of office Building in Three Climate Zones of Europe Nusrat Jung 1,2, Jari Shemeikka 1, Risto Lahdelma.
Massachusetts High-Performance Green Schools – Case Study Whitman-Hanson Regional High School Library & Media Center. This projects features include utilizing.
Calculation of Energy Performance of Buildings - Lithuanian Case. Dr
Energy year 2013 District Heat Wilhelms District heat in Finland year 2013  Heat sales (incl. taxes) 2,31 mrd €  Sold heat energy31,7 TWh.
Passive House Seminar for Professionals from the Building Sector
ARC 810: Building Climatology Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 810: Building Climatology Department of.
Energy use in buildings Dr. Atila Novoselac Associate Professor Department of Civil, Architectural and Environmental Engineering, ECJ
Status quo of buildings: Data status and first indicator results Julian Stengel Karlsruhe Institute of Technology (KIT) Brussels 1.
Energy efficiency in buildings Monga Mehlwana Tuesday, 05 October 2010.
Design of HVAC systems for bld 3862 – LHCb control room and for bld 2885 – LHCb new workshop.
Resource Efficient Development Geos Neighborhood Developer: Norbert Klebl Feb 19, 2010.
Energy conservation strategies Buildings energy consumption depends on building envelop, efficiency of HVAC and lighting systems, amount of required fresh.
Group 4B: Bergold, Kajander, Leppä, Niemeläinen, Pesonen.
Site Location: Site Location: Gap Site at Bath Street and Pitt Street Plot: Plot: 50m x 50m Building Area: Building Area: 4000m 2 maximum Building Height:
Energy Consumption Calculations Group 4a. Contents 1.Introduction 2.Methods 3.Tools 4.Country specific variations a.Finland b.Other Nordic countries c.Italy.
Energy year 2014 District Heat.
Click to edit Master title style Pilot renovation project in Estonia Targo Kalamees, Kalle Kuusk, TUT H2020 MORE-CONNECT 1st Meeting (Kick-off) 2015 January.
Taina Wilhelms Energy year 2011 District Heat.
Neelabh Pareek Charles Sie Leif Richmond Mike Rihl 2.
Contract: EIE/07/069/SI Duration: October 2007 – March 2010 Calculation of the integrated energy performance of buildings EN 15316: Heating systems.
By Katrin Klingenberg & Mike Kernagis (Home Power #138)
Additional information can run Underneath if necessary Sofia, November 2012 Moving towards nearly Zero-Energy Buildings in Bulgaria Oliver Rapf Buildings.
PRELIMINARY DRAFT EXCERPT RECOMMENDATIONS ON MEASUREMENT AND VERIFICATION METHODS IN THE FRAMEWORK OF DIRECTIVE 2006/32/EC ON ENERGY END-USE EFFICIENCY.
Analysis of the current state of art Arturo Lorenzoni, Fabio Disconzi University of Padova, Italy WORKSHOP 4.1 Low and very Low energy consuming buildings.
Heat Plan Denmark Low Carbon Urban Heating Anders Dyrelund, market manager Rambøll Denmark.
Case application: Insulation and glazing, The Netherlands Harry Vreuls, NL Agency Workshop: Harmonization in Energy Savings Calculation: How To Fit International.
Dušan Petráš ENERGY AUDITING AND CERTIFICATION OF BUILDINGS IN SLOVAK REPUBLIC Slovak University of Technology in Bratislava, Faculty of Civil Engineering,
Energy Management and Planning MSJ0210 Energy generation Eduard Latõšov.
Federation of European Heating, Ventilation and Air-conditioning Associations Renewables in nZEB office and school buildings REHVA nZEB Task Force Jarek.
OPTIMUM DESIGN OF A HOUSE AND ITS HVAC SYSTEMS USING SIMULATION
Architecture Supported by:
Heat transfer Steady state conditions not for dynamic systems in buildings through walls, roofs, floors, windows, doors building structures and U-values.
Technology Development
What kind of heat loss requirements nZEB and deep renovation sets for building envelope? Kalamees, T.; Lupišek, A.; Sojkova, K.; Mørck, O.C.; Borodinecs,
Building Environmental Systems
Specifics of multi-apartment building deep complex retrofitting
Space heating emission systems EN : Emission and control
Johann ZIRNGIBL CSTB / France
Under floor Heating Graduation Project submitted By: Adli Mosleh
Experience from Best Practice – With a Focus on Renovation
Self-Sustaining and Energy Efficient Buildings in Residential Areas
Martti Veuro.
Orla Coyle– NZEB and High Performance Retrofit- Programme Manager 15th May 2018 The Institution of Structural Engineers Nearly Zero Energy Buildings.
Assessment of the Energy Savings Potential of Daylight Utilization and its Impact on a Building Energy Performance Hermano Bernardo Vienna, 2010.
Energy performance of buildings
Thermal Impact of Different Interior Finishing Materials on Energy Consumption YOGESH JATAV
NZEB Dwellings and Major Renovations
Jerzy KWIATKOWSKI, Jerzy SOWA, Andrzej WISZNIEWSKI
Presentation transcript:

Click to edit Master title style Estonian cost optimal calculation and implementation in the code CA-EPBD III Madrid Jarek Kurnitski Professor, Tallinn University of Technology Vice-president REHVA

Presentation outline Estonian cost optimal calculations: conducted as a financial calculation in 2011 Implementation into building code: cost optimal energy performance minimum reqs. for new buildings and major renovations apply from Jan 9, 2013

Federation of European Heating, Ventilation and Air-conditioning Associations Situation with energy frames In most of countries, on site renewable energy production is subtracted from delivered energy (must for Cost Optimal) Differences in energy frames: –primary energy not yet used in all countries (must for Cost Optimal) –Some countries (Germany, France) use reference building method, fixed values in other countries –Both simulation (Estonia, Finland) and monthly methods (Germany, Denmark) used Inclusion of energy flows depends on country: –Germany/residential – heating energy only (space heating, DHW and heating of ventilation air) –Germany/non-residential – cooling and lighting also included (appliances not) –Denmark – appliances and in residential also lighting not included –Sweden – appliances and user’s lighting not included (facility lighting incl.) –Estonia, Finland, Norway – appliances and lighting included (all inclusive)

Federation of European Heating, Ventilation and Air-conditioning Associations Energy frames, exported energy Exported electricity can be taken into account on annual basis (full utilization), monthly bases (limited to the amount of the delivered electricity each month and the rest of exported is not accounted) or is not taken into account Full utilization (annual bases) (must for Cost Optimal?): –Denmark, Estonia, net plus energy program in Germany Monthly bases: –Germany, Sweden? (not decided) Not accounted –Finland, Norway, Italy Most of energy frames not yet ready to support exported energy

Estonian Cost Optimal: Seven step systematic procedure (Kurnitski et al. Energy and Buildings 43 (2011) 1.selection of the reference building/buildings 2.definition of construction concepts based on building envelope optimization for fixed specific heat loss levels (from business as usual construction to highly insulated building envelope in 4 steps) 3.specification of building technical systems 4.energy calculations for specified construction concepts 5.post processing of energy results to calculate delivered, exported and primary energy 6.economic calculations for construction cost and net present value of operating cost 7.sensitivity analyses (discount rate, escalation of energy prices and other parameters) All this steps are independent, iterative approach not needed for residential buildings, because of the specific heat loss method used Worked well for residential, non-residential buildings less predictable

Reference buildings – proposed by the society of Estonian architects, 3 out of 6 buildings shown Jarek Kurnitski

Pre-optimized building envelope The specific heat loss coefficient includes transmission and infiltration losses through the building envelope and is calculated per heated net floor area:

Energy simulations Results of the detached house as a function of insulation level (construction concepts) and heat source From left to right from passive house building envelope to BAU

Energy cost data used (2011 data) Electricity €/kWh + VAT (20%) Natural gas €/kWh + VAT (20%) (consumption over 750 m 3 /year) Pellet0.033 €/kWh + VAT (20%) Heating oil €/kWh + VAT (20%) District heating €/kWh + VAT (20%) (Tallinn, natural gas boiler) Escalation 2% (in base case) Discount rate 3% (in base case) In sensitivity analyses:  Escalation 3% and discount rate 3%  Escalation 1% and discount rate 3%

Incremental cost calculation Construction cost calculation for energy performance related works and components included:  thermal insulation  windows  air handling units (without ductwork)  heat supply solutions (boilers, heat pumps etc.) Labour costs, material costs, overheads, the share of project management and design costs, connection fees, and VAT were included in the energy performance related construction cost Global energy performance related cost was calculated as a sum of the energy performance related construction cost and discounted energy costs for 30/20 years (res./non-res.), including all electrical and heating energy use As the total construction cost was not calculated, the global incremental cost was used (relative to the business as usual construction):

Global incremental cost calculation: “Gas boiler” cases The global cost included, first divided by net heated floor area of 171 m 2 The values of the reference building (DH 0.96) subtracted

Example of cost optimal: Estonian detached house 3% discount rate and 2% escalation (Kurnitski et al. Energy and Buildings 43 (2011)) AWHP – air to water heat pump, GSHP – ground source heat pump, DH – district heating W/o PV, 4 insulation levels from left to right: 0,42, 0,58, 0,76 ja 0,96 specific heat loss H/A H/A 0,42 ja 0,58 are calculated with solar collectors nZEB +239 €/m 2 construction cost (PE = 40 ), W/o PV +93 €/m 2 (PE = 80) nZEB Cost optimal Min.req.

Results without solar collectors With or w/o solar collectors? Calculate both with and without solar collectors! Cost optimality depended on energy source: with reasonably cheap gas, it was optimal to increase the insulation thickness by one step instead of solar collectors

Breakdown of the global cost components Extra global cost < extra investment cost Extra global cost is less than extra investment cost, because of reduced energy use Improvement from DH 0.76 to DH 0.42 means extra investment cost of € corresponding to 6757 € NPV in GSHP case

Apartment building

Apartment building 3% discount rate and 2% escalation

Office building

Office building 3% discount rate and 2% escalation

Distance from cost optimal to nZEB Investments needed for nZEB in the reference detached house: € investment in GSHP case led to 75 kWh/(m 2 a) primary energy + 5 kW solar PV installation with about € investment (2011 data) Results in about nZEB=40 kWh/(m 2 a) primary energy Distance to nZEB the reference detached house : € extra construction cost 239 €/m 2 extra construction cost – (2011 data) (W/o PV +93 €/m 2 ) In the reference apartment and office buildings: €/m 2 extra construction cost (2011 data)

Cost optimal solutions – main principles Building envelope: -External wall U=0.14…0.17 (small/large building) -Window U=0.8 -Roof and external floor U=0.09…0.14 Technical systems: -Specific fan power of ventilation SFP=1.7…2.0 -Heat recovery  80% (possible also with exhaust air heat pump/ventilation radiators) -Lighting <12 W/m 2 -Hydronic heating (electrical not possible) -Free cooling loop in the cooling system Architectural preconditions: -Reasonable compactness -Solar shading -Controlled window to wall ratio (“glass building” needs double skin)

Implementation into the regulation Energy frame based on primary energy Exported energy in the energy frame Lighting&Appliances included, i.e. calculated ≈ measured Dynamic simulation required for non-residential Implementation was possible by just adjusting primary energy requirements, given for 9 building types Primary energy reqs. improved by about 20-40% depending on building type and energy source (some adjustments in the standard use of buildings and PE factor of electricity) Safety margin of 10 to 15% was generally applied to cost optimal primary energy Cost optimal regulation in force since Jan 9, 2013 both for new buildings and major renovation

Estonian system boundaries

Federation of European Heating, Ventilation and Air-conditioning Associations REHVA system boundaries

Estonian regulation VV No 68: 2012 implemented nZEB and cost optimal Primary energy requirements for 9 building types (apply from Jan 9, 2013) nZEB and low energy requirements officially given together with cost optimal minimum reqs (not yet mandatory) Conversion factors: –Electricity 2.0 –Fossil fuels 1.0 –District heat 0.9 –Renewable fuels 0.75

Estonian regulation VV No 68: 2012 – Minimum requirements for energy performance MKM No 63: 2012 – Energy calculation methodology Compliance assessment:  For all buildings equipped with cooling, energy performance calculation shall be based on dynamic building simulation  Requirements are specified for simulation tools, which refer to relevant European, ISO, ASHRAE or CIBSE standards, IEA BESTEST or other equivalent generally accepted method.  For residential buildings without cooling, monthly energy calculation methods may be also used.  An exception is for detached houses, which have an alternative compliance assessment method based on tabulated specific heat loss values Summer thermal comfort:  If no cooling installed, a dynamic temperature simulation in critical rooms required in order to comply with summer temperature requirements (25°C °Ch in non-residential and 27°C °Ch in residential buildings during three summer months simulated with TRY)  An exception is for detached house, there the compliance may be alternatively shown with tabulated values for solar protection, window sizes and window airing

How to compare min. requirements? Detached house (1/2013 data) Recalculation from primary energy to delivered energy needed, which can be compared in all countries 150 m 2 detached house considered Degree-day correction (base 17°C) to Copenhagen, energy use for hot water heating 25 kWh/(m 2 a) The figure shows maximum allowed delivered energy without household electricity (i.e. delivered energy to heating, hot water and ventilation systems) in each country for fossil fuel or electrical heating

Apartment and office buildings with district heating (1/2013 data) Maximum allowed delivered energy for heating, hot water and ventilation systems in apartment buildings and for office buildings (lighting included) with district heating