Mechanical design, analysis and integration of pre-alignment systems for CLIC M.Anastasopoulos / BE-ABP-SU.

Slides:



Advertisements
Similar presentations
Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.
Advertisements

H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team QD0 and BDS pre-alignment.
October 21, 2005 Internal LCLS Undulator Alignment and Motion Review Georg Gassner, SLAC / MET 1 HLS Monitoring System Georg.
H. MAINAUD DURAND CLIC ACTIVE PRE-ALIGNMENT SYSTEM: PROPOSAL FOR CDR AND PROGRAM FOR TDR.
H. MAINAUD DURAND, A. HERTY, A. MARIN, M. ACAR PERMANENT MONITORING OF THE LHC LOW BETA TRIPLETS: LATEST RESULTS AND PERSPECTIVES.
October 20-21, 2005 Internal LCLS Undulator Alignment and Motion Review Catherine LeCocq, SLAC 1 Undulator Alignment Concept &
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
Workshop TS May 2008 GENERAL CLIC ALIGNMENT Progresses and strategy. Hélène MAINAUD DURAND, TS/SU/MTI.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics.
A Laser Based Alignment System for the CLIC project
CLIC. Hélène MAINAUD DURAND| SU pendant LS1 day| | INDICO | page 2 Activities CLIC LAMBDA project (Laser Alignment Multi-Based Design.
Influence of the Gravity, Vacuum and RF on CLIC Module T0 Behavior R. Raatikainen.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team with 3D views and data from Hubert Gerwig, Richard Rosing and Juha Kemppinen Pre-alignment.
PACMAN Workshop OUTLINE Introduction ESR 3.1 Challenges - Stability budget and Precision Mechanical Design - Precision Assembly of MBQ and BPM - System.
Commerce, a.s., Bratislava
H. SCHMICKLER Alignment challenges for a future linear collider.
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
1 ACTIONS: Ashley French TASK STATUSCOMMENTS 1. Contact Berthet-SergeFuture 12/11/10 2. Contact Serge Mothot & Said Atieh (CERN Workshop) Future 12/11/10.
H. MAINAUD DURAND, BE-ABP/SU, 23/04/2010 STATUS OF THE CLIC PRE-ALIGNMENT STUDIES.
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team CLIC ACTIVE PRE-ALIGNMENT STUDIES: STATUS FOR CDR AND PROSPECTS FOR TDR PHASE.
INTEGRATION OF RF STRUCTURES IN THE TWO-BEAM MODULE DESIGN G. Riddone, CERN, Geneva, Switzerland A. Samoshkin, D. Gudkov, JINR, Dubna, Russia Abstract.
Friedrich Lackner (TS-SU) CLIC08 Workshop. CLIC Main Beam Quadrupole Magnet The Alignment Concept Expected Properties of a the Support Structure Foreseen.
CTC, Two-beam module program (WP CTC-004) CLIC Modules (boundary conditions, technical system design and integration) CDR modules Prototypes.
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team MDI alignment plans IWLC2010 International Workshop on Linear Colliders 2010.
1/12 Sylvain GRIFFET, 17/10/2011 BE/ABP-SU/ Simulations of laser tracker AT401 measurements on TM0 CLIC girders EDMS Document No
Status of: CLIC Two-Beam Module Magnets R&D and Procurement 1 Michele Modena, CERN TE-MSC IWLC10, WG8, 21October 2010.
NLC MAC Meeting 6-8 Nov Linac Girder Studies and Plans C. Boffo Slide 1 Linac Girder Studies and Plans C. Boffo – E. Borissov – H. Carter Fermilab,
06-November-2013 Thermo-Mechanical Tests BE-RF-PM Review of the CLIC Two-Beam Module Program Thermo-Mechanical Tests L. Kortelainen, I. Kossyvakis, R.
STATUS of the final PACMAN bench integration PACMAN meeting 11/06/2015 Hélène Mainaud Durand.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
DBQ support – motorization and performance upgrade Mateusz Sosin EN/MEF-SU.
Discussion points TBM meeting 23/09/2015. Updates Global 3D assembly updated, no severe problems/clashes T1 RF network dimensions updated WPS arms machined.
1962 First CMM DEA (Italy) Ahmed CHERIF CERN Metrology lab. CLIC TECHNICAL COMMITTEE – EDMS : EDMS :
RUDE Vivien With the help of Hélène MAINAUD-DURAND And Mateusz SOSIN BE/ABP/SU CLIC MODULE September 19, 2011 Présentation REPORT OF THE CURRENT TESTS.
CLIC survey and alignment 1 CLIC CES meeting STARTSLIDE CLIC SURVEY AND ALIGNMENT Hélène MAINAUD DURAND.
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
Short range alignment strategy in CLEX and first results CLIC Workshop January 2015 on behalf of : Hélène Mainaud-Durand, Mateusz Sosin Mathieu.
The CLIC alignment studies 1 CLIC workshop October 2007 THE CLIC ALIGNMENT STUDIES Hélène MAINAUD DURAND.
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 May 30th,
cern.ch 1 A. Samoshkin 28-Feb-2011 Progress on CDR module design.
CLIC Beam Physics Working Group CLIC pre-alignment simulations Thomas Touzé BE/ABP-SU Update on the simulations of the CLIC pre-alignment.
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 July 17,
CLIC module Experimental program for module array Module review, June 22 nd 2015Elena Daskalaki, BE-RF-MK.
Fiducialisation and initial alignment of components for CLIC Mateusz Sosin on behalf of the CLIC active pre-alignment team CLIC Workshop 2015.
SUM ESR ESR ESR ESR ESR ESR ESR ESR (TBC)
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
Alignment system and impact on CLIC two-beam module design H. Mainaud-Durand, G. Riddone CTC meeting –
Pre-alignment of quadrupoles 1 CLIC stabilization day, STARTSLIDE PRE-ALIGNMENT OF THE MAIN BEAM QUADRUPOLES Hélène MAINAUD DURAND.
TBL experimental program Status and Results  Introduction  Status  Experimental program for 2010 and beyond  Outlook ACE, Steffen Döbert.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team QD0 and BDS pre-alignment.
CLIC08 Workshop, CERN October 2008 PRE-ALIGNMENT STUDY STATUS AND MODEL FOR THE BEAM DYNAMICS SIMULATIONS TS/SU/MTI Thomas TOUZE Hélène MAINAUD DURAND.
CLIC survey and alignment studies 1 CTC meeting, 13 th January 2009 STARTSLIDE CLIC Survey and alignment studies Jean-Pierre QUESNEL, Hélène MAINAUD DURAND.
BRAINSTORMING ON LASER BASED SOLUTIONS FOR CLIC PRE-ALIGNMENT INTRODUCTION Hélène MAINAUD DURAND, BE/ABP/SU, 09/02/2010 Status of the study CLIC pre-alignment.
H. MAINAUD DURAND Studies on active pre-alignment for the CLIC project.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignment team Status on CLIC pre-alignment studies.
ILC : Type IV Cryomodule Design Meeting Main cryogenic issues, L. Tavian, AT-ACR C ryostat issues, V.Parma, AT-CRI CERN, January 2006.
Two-beam module layout
on behalf of the CLIC active pre-alignment team
TEST MODULE WG Cradles for CLIC module supporting system
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Module roadmap to end of 2017
WP1 Metrology & Alignment
List of changes and improvements for the next generation CLIC module
Background With new accelerators delivering beams always smaller and more energetic, requirements for very precise beam alignment become more and more.
Installation plan for LAB modules
Towards a common mechanical interface
Alignment challenges for a future linear collider
Michail Anastasopoulos Lead Detector – Design Engineer
Presentation transcript:

Mechanical design, analysis and integration of pre-alignment systems for CLIC M.Anastasopoulos / BE-ABP-SU

Contents I. Introduction II. Mechanical Design - Typical workflow III. Completed and running projects IV. Future tasks

CLIC Pre-alignment Components should be pre-aligned within a few microns over 200m Overlapping stretched wires will provide a stable and determined alignment reference cWPS sensors will perform measurements with respect to these wires Actuators will re-adjust the components to their theoretical positions CLIC Pre-alignment Components should be pre-aligned within a few microns over 200m Overlapping stretched wires will provide a stable and determined alignment reference cWPS sensors will perform measurements with respect to these wires Actuators will re-adjust the components to their theoretical positions I. Introduction 200 m The metrological reference network of overlapping wires Challenges in the Test-Modules for the mechanical engineer Simultaneous existence of various systems: vacuum, RF, stabilization, pre-alignment Limited space for installation Access and maintenance issues Proper collaboration between systems designed by different people Challenges in the Test-Modules for the mechanical engineer Simultaneous existence of various systems: vacuum, RF, stabilization, pre-alignment Limited space for installation Access and maintenance issues Proper collaboration between systems designed by different people

Concept 3D design Fabrication Installation Previously used system that needs to be modified Integration Re-design II. Mechanical Design - Typical workflow

III. Completed and running projects  Support extemities of WPS and HLS sensors for CLIC Test-Module Simulation under working load for design optimization 3D design of proposed solution

Design, analysis & integration of additional components Basic supporting system cWPS sensor with fixation Servo Inclinometer with fixation Stretching devices - weight end Stretching devices - fixed end Optical WPS with fixation Deformation under working load (static)

Fabrication drawings and installation plans Supporting block installation plan Top plate fabrication drawing Complete system assembly plan Stretching devices assembly plan

Final solution for installation of WPS sensors, inclinometers, wire stretching devices Final solution for installation of WPS sensors, inclinometers, wire stretching devices

Support extremities integrated at Test-Module level Various modifications made to the initial design Additional systems are foreseen to be installed in the future (HLS) Support extremities integrated at Test-Module level Various modifications made to the initial design Additional systems are foreseen to be installed in the future (HLS)

Actual installation at 169/S-039

 Adaptation of Hydrostatic Leveling System (HLS) and water network for CLIC Test-Module HLS schematic Used to determine height differences Based on communicating vessels principle Air linkage between the stations for achieving the same pressure Typical HLS Pot and a previous installation

Support assembly plan HLS Pot assemblyPS4 Valve HLS Network installation plan

Proposed solution for HLS Network at Test-Module

HLS network integrated at Test-Module level Fabrication of real components is in progress HLS network integrated at Test-Module level Fabrication of real components is in progress

 Integration of NIKHEF RasChain system Alternative alignment solution Based on optical WPS sensors (laser) Needs thermal insulation Alternative alignment solution Based on optical WPS sensors (laser) Needs thermal insulation NIKHEF optical alignment system (current design under modifications) Integration of current version of the system (Laser sensors & thermal insulation)

 Integration of an alignment system in a 5 DoF Mockup A compact solution was adopted for sensor plates and stretching devices Will provide an evaluation platform for a 5 DoF system, based on cam movers Actual installation at 927-TAP

 Metrological Reference Network (MRN) Interconnecting bench 200 m Metrological Reference Network Overlapping stretched wireInterconnecting metrological plate Limited space (~ 50 cm. width allowance inbetween the module’s girders) Access for sensors and stretching devices maintenance Minimum deformation of supporting plate Currently proposed solution / still under evaluation

IV. Future tasks CLIC Test Modules Installation of HLS system in current setup Follow-up of NIKHEF installation Modelling of cables and electronics CLEX facility Adaptation of currently installed systems Design for installation of new systems MRN bench Finalization of proposed design Simulations of mechanical behaviour Various independent designs WPS fixation testbench Mechanical solution for sensors maintenance Presentation of total alignment strategy

Thanks for your attention!