Equipment Installation, piping & wiring Variable Water Flow System.

Slides:



Advertisements
Similar presentations
Packaged HVAC Equipment
Advertisements

Basic safety rules and procedures for controlling hazardous energy
East Carolina University Compressed Gas Safety Training Program
Daikin Altherma™ Troubling Shooting
Trane Variable Water Flow System
Installation. Indoor Unit Installation Typical Installation.
General Rules Compressed gases and cylinders must be properly stored, transported and used to prevent injury and accidents. Compressed gases and cylinders.
VRLA Battery Maintenance and Safety UTC Region 3 Meeting October 4, 2012.
Air-Conditioning Control Systems
HAZARD COMMUNICATIONS / E N V I R O N H & S T R A I N I N G P R O G R A M HAZARD COMMUNICATION PROGRAM OSHA Standard 29 CFR The OSHA hazard communication.
Copyright © 2014 Delmar, Cengage Learning Safety Instructor Name: (Your Name) 1 CHAPTER.
Condensation Piping and Installation Drain Pans
ASHRAE Presentation: VRF Overview Mitsubishi Electric Presenter: Phone number ©2011 Mitsubishi Electric& Electronics USA, Inc.
1 Welding Module 10. 2Objectives After this module you should be able to – identify the most common welding hazards – take the necessary steps to avoid.
Installation. Indoor Unit Installation Typical Installation.
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE PV APPLICATIONS CODES AND STANDARDS EMERGENCY RESPONSE.
Aqualean Product Presentation 1 By Laurent Domenget Product Manager, Rooftop & Packaged Air Units.
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
1 HVACR316 - Piping Related Codes Trade Math 1 Related Codes Trade Math 1.
AIR CONDITIONING (COOLING)
Generation Geo. EXPECTED SAVINGS Savings vary by region and energy costs Savings happen large or small homes Natural gas prices today are artificially.
‘YGFC’ FAN COIL UNITS NEW PRODUCTS
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
2013 NATEF Task Area A-7 Heating, Ventilation, and A/C A. A/C System Diagnosis & Repair B. Refrigeration System Component D & R C. Heating, Ventilation.
HVACR – Refrigeration Safety.
Air-Source Heat Pumps I North Seattle Community College HVAC Program Instructor – Mark T. Weber, M.Ed. Airsource Heat Pump 1.
Proper Handling of Automotive Airbag Modules. REMEMBER ALWAYS USE THE REQUIRED PPE Airbag modules are explosive. Improper handling can lead to serious.
Flammable and Combustible Liquids
Hydraulic Kit (pump and tank) Pictures from prototype.
2.5.5 Student Book © 2004 Propane Education & Research CouncilPage Coordinating Loading and Unloading of ASME Tanks Using Contractor- Operated.
3.7.3 Student Book © 2004 Propane Education & Research CouncilPage Identifying Safe Handling Practices for Flammable and Combustible Liquids Injecting.
Air Source Heat Pump Specifications Proposed Revisions Regional Technical Forum Subcommittee July 2, 2013.
Flammable and Combustible Liquids. Introduction !The two primary hazards associated with flammable and combustible liquids are explosion and fire !Safe.
Product Presentation 2007 SKY AIR Launch of new Non-Inverter + Duct (R22) series.
1 HVACR316 - Piping Related Codes Trade Math I Related Codes Trade Math I.
Unit 4: General Safety Practices
Proper Use of Extension Cords
1 BREC Air-cooled water chillers BREF Air-cooled water chillers with free-cooling system 1602A A A A A 3202A A A -
Lab Safety MYCAERT INC.. What is Safety? Safety is preventing injury and loss. Injury and loss may be inflicted on people or their property.
Accident Prevention Manual for Business & Industry: Engineering & Technology 13th edition National Safety Council Compiled by Dr. S.D. Allen Iske, Associate.
2011 PLANT OPERATIONS MODULE 8 Maintain Bulk Plant Systems and Equipment.
Water is the Natural Choice Hydronic Comfort Systems Increase and Maintain Building Efficiency For the Life of Your Building
Water is the Natural Choice Water: The Natural Choice For Efficiency – Building System efficiency not just a unit rating – Equipment Ratings EER and COP.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
Page 1 MCQUAY DIGITAL SCROLL SYSTEM Installation.
FLAMMABLE AND COMBUSTIBLE LIQUIDS 1 Bureau of Workers’ Comp PA Training for Health & Safety (PATHS) OSHA 29CFR PPT
Tank Heating by Various Methods for Metal Finishing and Other Process Heating Applications OVERVIEW 1.
1  2008 Kaeser Compressors, Inc., USA (V2.2) “Specifications are subject to change without notice” Presenting... Kaeser Omega Blowers.
Flammable Liquids Directorate of Training and Education
AIR CONDITIONING (COOLING)
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
S A Griffiths CM42 June 2015 Electrical & Control.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
Industrial Resources, Inc.
Automotive Heating And Air Conditioning
10 12 and 14 TR Advanced Glycol Chiller
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
10TR Nominal Glycol Chiller
‘YGFC’ FAN COIL UNITS NEW PRODUCTS
Munters DOAS, Chilled Beams and VRV
East Carolina University Compressed Gas Safety Training Program
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE
ICE 101 APPLICATION GUIDE INTALLATION AND OPERATIONAL CONSIDERATIONS.
Cashew Dryer User Manual
VITALITY Large Splits Johnson Controls PowerPoint Guidelines | July 21, 2009.
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE
Parker domnick hunter. Safety of Electrical and
Presentation transcript:

Equipment Installation, piping & wiring Variable Water Flow System

Objectives: 1. To be able to know the safety pre-caution for VWF installation. 2. To be able to know the pre-installation requirements. 3. To be able to know the VWF unit mechanical & electrical installation.

Safety Before installing/servicing this unit, technicians MUST put on all Personal Protective Equipment (PPE) recommended for the work being undertaken. ALWAYS refer to appropriate MSDS sheets and OSHA guidelines for proper PPE. When working with or around hazardous chemicals, ALWAYS refer to the appropriate MSDS sheets and OSHA guidelines for information on allowable personal exposure levels, proper respiratory protection and handling recommendations.

Unit Inspection As soon as the unit arrives at the job site Verify that the nameplate data matches the data on the sales order and bill of lading (including electrical data). Verify that the power supply complies with the unit nameplate specifications. Verify that the power supply complies with the electric heater specifications on the unit nameplate (applies only to units with electric heaters).

Visually inspect the exterior of the unit, including the roof, for signs of shipping damage. Check for material shortages. Refer to the Component Layout and Ship with Location illustration. If the job site inspection of the unit reveals damage or material shortages, file a claim with the carrier immediately. Specify the type and extent of the damage on the "bill of lading" before signing. Visually inspect the internal components for shipping damage as soon as possible after delivery and before it is stored. Do not walk on the sheet metal base pans.

7 Model Number Description C G D K H E A Z R N R R A C ,6, Digit 1,2,3 — Unit Type CGD= Digital Air-Cooled Water Chiller Refrigeration Circuit Digit 4 R = Heat Pump K = Cooling Only Digit 5-7 — Nominal Capacity (Tons) 100 = = = = = 14 Digit 8 — Voltage Selection 2 = 220V/60 Hz/3 ph 5 = 380V/50 Hz/3 ph Digit 9— Airflow Configuration H = Horizontal Digit 10— Refrigerant E = R-22 Digit 11 — Manufacturing Code (defaulted by factory) A = Double Compressors B = Triple Compressors Digit 12 — Central Controller Z = With Central Controller (as standard) Digit 13 — Chilled Water Pump R = Water Pump Digit 14 — Auxiliary Electric Heater in Water Circuit N = None Digit 15 — Ambient Temperature R = Standard Ambient Temperature Set (Standard) Digit 16 — Water Pipe Direction (Face to the Airflow) R = Right Side (Standard) B = Back Side (Optional) Digit 17 — Design Sequence (Not for client) A = First Version B = Second Version Digit 18 — Region V = China A = APR B = MAIR C = LAR

8 Unit Rigging and Placement Move the unit using a forklift or crane of suitable capacity. Rig the unit using canvas belt. Fasten the belt over the units base. Failure to properly lift unit could result in death or serious injury.

9 Service and maintenance clearance The unit should be installed where there is adequate ventilation.

10

11

Typical system installation 1. The indoor unit selected must be Trane networking indoor unit so that normal system operation can be guaranteed. 2. Electric two-way valve must be installed at the outlet of each indoor unit, the electric two-way valve selected must obtain in Trane quality verification. 3. Standard length of the controller connecting cable is 7 m. 4. Communication cable type is AWG 18–22 twisted (shielded) pair wire. If greater than 150 m is required, please specify in factory order. 5. Electric heater is invalid for Cooling Only units. Total nominal capacity of ID units is required to be less than 200% OD nominal capacity.

13

14

15 PVC Pipe Installation Benefits PVC pipe and fitting price is 4 times cheaper than steel pipe’s. PVC Pipe weight is 6 times less than steel pipe’s. Use smaller pipe size because friction loss of PVC pipe is much less than steel pipe’s. Easy transportation, Easier and quicker installation, longevity

16 PVC Pipe Installation Benefits Size PVC Class 13.5 (Kg/m) Steel Sch#40 (Kg/m) Size Diff. (time) ½” ¾” ” /4” /2” /2” ” /2” ” ” ”

17 PVC Pipe Installation

Water flow of the outdoor unit

Recommended cable specification for outdoor unit

Control System