CADLink CAD Interface system that connects your design information to. PLEX Online. ECN Manager Ties your ERP Solution CAD information with your Engineering change process.
QBuild began in 1995 with a simple AutoCAD ERP link. Today CADLink integrates ERP’s to leading CAD & PDM systems, including: SolidWorks SolidWorks EPDM EPDM WindChill WindChill AutoCAD AutoCAD NX NX Inventor Inventor Pro-E Pro-E Many more.. Many more..
L INKING P LEX AND CAD D ATA
o Zero software cost o Error Prone o Time Consuming o Small engineering departments o Manufacturing of simple, repetitive products
o Cheap and Cheerful o Slightly Faster than Brute Force o Often requires massaging data in both CAD and PLEX o Small engineering departments o Manufacturing of simple, repetitive products
Features o Direct link to: PLEX Online o Push PLEX description onto the drawing o Push revision information to CAD and PLEX Online o Update items, bills of material, and operations directly from your CAD system o Tie critical dimensions to PLEX ERP BOM quantities
Reduce non value-added engineering activities Double and triple data entries are eliminated Reduce scrap Improve purchasing accuracy Eliminate “wrong build” situations Improve on time shipments Reduce engineering costs Improve accuracy from engineering to production
8 Eng x 1 hour per day = 2000 hours BOM Data Entry 1 scrapped part per year 12 late shipments per year Shop Floor ConfusionTotal savings of 65,000 a year
Bill Of Material information is pulled from Models or Drawings and displayed for the Engineer in this grid. Discrepancy between CAD and PLEX Data are highlighted
Multi Level Bill Of Material
Shows the discrepancy between CAD and PLEX Data. Allows engineering to select the correct one
Class Code table is taken directly from PLEX Online
Group Code table is taken directly from PLEX Online
PLEX Raw Material data is accessible directly from CADLink
PLEX Routing data created directly from within CADLink
Engineering can select the specific operation for each assembly component
Bill of Material Changes Summary shows only the BOM changes that will be made to PLEX
CAD Properties for the entire assembly conveniently summarized in a single tab
CADLink can be configured to suit your requirements
BOM Data Entry 8 Eng X 1 hour per day = 2000 hours Cost Justification Shop Floor Confusion 1 scrapped part per year 12 late shipments per year Total Savings of $65,000 per year
Contact for Sales and Consulting: Geovanna Pazmino Applications Engineer QBuild C O R P O R A T I O N 145 Renfrew Drive, Unit 140 | Markham, ON L3R 9R6 | CANADA Phone EXT 224 Fax