Process Engineer’s Role in Project Management Dr Abdullah Malik.

Slides:



Advertisements
Similar presentations
MAINTENANCE PLANNING AND SCHEDULING
Advertisements

PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
Best Practices for an Owner Estimating Organization
EQUIPMENT VALIDATION.
12-May-151 Khan Younis Waste Water Treatment Plant Management Arrangements Khan Younis Waste Water Treatment Plant Management Arrangements.
Project Phases of an EPIC Contract Pre Project Basic EngDetailed Eng Procurement Long Lead Items MC Prep Installation PC Execute PC and Commissioning Preparation.
INDUSTRIAL & SYSTEMS ENGINEERING
Company LOGO C o n s t r u c t i o n R e p o r t P r o f e s s i o n a l C o n s t r u c t i o n M a n a g e m e n t 2006 Prepared by:
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
PROCEDURES FOR SELECTING THE CONTRACTOR
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Spring 2008, King Saud University Engineering Administration Dr. Khalid Al-Gahtani 1 What is a Project? “A Project is a one-shot, time-limited, goal- directed,
Accounting Specialist Basic Functions : To provide essential data by computing and distributing collections to their respective allocations. Knowing the.
Construction Specifications
CHAPTER 5 Infrastructure Components PART I. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser 2 Learning Objectives: To discuss: The need for SQA procedures.
Introduction to Software Quality Assurance (SQA)
Process Safety Management
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
© 2010 Chevron A Day in the Life of a Project Manager Presented by Nancy Grossman, Project Manager Presented to Chabot College Engineering Class September.
Project Management : Techniques and Tools (60-499) Fall 2014 / Winter 2015.
Industrial Engineering Roles In Industry
Free Powerpoint Templates Page 1 Free Powerpoint Templates How do we do it? Class 7.
Using the Logical Framework to Develop Activity and Resource Schedules.
SENG521 (Fall SENG 521 Software Reliability & Testing Software Product & process Improvement using ISO (Part 3d) Department.
Introduction- Project Management By Ctrl+C & Ctrl+V 1.
Developing and Issuing the RFP. Why should qualifications be your procurement focus? n Having the necessary range of capabilities is more important than.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Public-Private Education Facilities and Infrastructure Act 2002 (PPEA) Joe Damico.
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
Introduction to Hazardous Evaluation Techniques Guidelines for Hazardous Evaluation Procedures (1992 by AIChE). Second Edition with Worked Examples. Center.
CHAPTER#08 MANAGEMENT OF TECHNICAL PROPOSALS AND SPECIFICATIONS Lecture No. 08 Course: Engineering Management 19 april 2013 MED DEPARTMENT, U.E.T TAXILA.
Project management Dr. Khaled Bubshait 1 Dr. Khaled A. Bubshait Project Management.
BSBPMG505A Manage Project Quality Manage Project Quality Project Quality Processes Diploma of Project Management Qualification Code BSB51507 Unit.
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
PROJECT LIFECYCLE.
A FSP is a Program designed to identify and control hazards in order to establish and maintain food safety. (Based on HACCP principles) 1 version 2 Dec.2009.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 1 Diploma of Project Management.
Systems Development Life Cycle
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
Construction of a Transfer Station
Negotiation of Proposals Dr. Evangelos Ouzounis Directorate C DG Information Society European Commission.
WMATA Project Implementation Manual (PIM) Stage 3, Construction Chapter 200, Authority Representative, Responsibilities and Functions Presenters: David.
1 Project Management C13PM Session 2 Project Initiation & Definition Russell Taylor Business Department Staff Workroom
Preparation Plan. Objectives Describe the role and importance of a preparation plan. Describe the key contents of a preparation plan. Identify and discuss.
12.1 Plan Procurement: Introduction
Purchasing Cards. What is a Purchasing Card? It is a type of commercial credit card, used by organizations for payment of goods and services. This tool.
CDM Construction Design and Management
Folie 1 Sarajevo, October 2009 Stefan Friedrichs Managing Partner Public One // Governance Consulting Project Management in the Public Sector Monitoring.
Fieldbus Foundation General Assembly 2008 Project Planning and Execution Mike Downey Jacobs Engineering.
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
0 Design Change Construction & Completion Management (Outline and related procedures) Hanul NPP Engineering Center.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
Systems Analysis Lecture 5 Requirements Investigation and Analysis 1 BTEC HNC Systems Support Castle College 2007/8.
Capability Presentation April 2014 DEVELOPING PROJECT OPPORTUNITIES PROCEDURE FLOW CHART OPPORTUNITIES CRITERIA OFFICE LOCATION.
CHANGE ORDER/CLAIMS MANAGEMENT MODULE 9. Change Order Management.
Construction Tender Process Tender steps between Client, Contractor and Subcontractor Dr A Kimmance.
Project Management PTM721S
Director’s Progress Review Closeout Meeting
Façade Management Consulting
Maintenance Scheduling
Systems Analysis and Design in a Changing World, 4th Edition
Change Management V.N.Bhaskar Rao Engineering & Construction Director Amec Foster Wheeler India Operations.
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
PROJECT MANAGEMENT (ARCH 484) DEPARTMENT OF ARCHITECTURE & BUILDING SCIENCE.
Project Management.
MAINTENANCE PLANNING AND SCHEDULING
Monitoring and Information Systems
Director’s Progress Review Closeout Meeting
Project Management Process Groups
Controlling Project Cost and Schedule
Presentation transcript:

Process Engineer’s Role in Project Management Dr Abdullah Malik

Management of Engineering Project 1.Preparation 2.Developing The Team 3.Project Duty Specification 4.The Process Specification 5.General Design Criteria 6.Level of Detail 7.Execution of Engineering and Installation 8.Project Management 9.Project Initiation

1. Preparation In order to appoint an EC it is necessary to complete the following –Compile Project Duty Specification –Develop contractors scope of work –Develop contractual terms and contract itself –Assemble the document inviting contractor bid –Decide on the selection procedure for the contractor appointment Forms the basis of selected EC’s scope of work

2. The Team Involved Company Middle management Senior personnel from engineering, purchasing and legal department

3. Project Duty Specification The process specification General design criteria Any preliminary flow sheets Utilities specification Basis for economic evaluation Material of construction Equipment standards Instrument standards

4. The Process Specification Developed entirely by senior process engineer Gives precise terms of the plant required The number of units Its throughput The product yields and quality The required test standards Any salient process requirements

5. General Design Criteria Main input from project engineers with technical check by process engineer – supplies general data associated with plant site; The main topics covered are: –Scope –Climatic data –General design considerations –Units of measurements –Engineering Line Diagram/PID/PFD –Utilities specification –Basis of economic evaluations –Material of construction –Equipment standards to be used for sizing and design –Instrument standards required

6. Level of Detail Request for contractor's quotes Less detail is supplied depending on contractor's standards and criteria More detail required to ensure good competitive quotation Complete project duty specification would also contain details and criteria for other disciplines, which have very little process input which includes civil, structural, electrical and piping

7. Execution of Engineering and Installation With limitless funds and time and no specific quality anyone with little technical knowledge can build a process plant However in the real world constraints the art and management skills are required for a successful product i.e. project management and control techniques.

8. Project Management Begins with forming a team of engineers necessary to design, procure and erect the facility Led by a project manager and supplemented by project schedulers and cost estimators All are senior members of respective disciplines Have the authority to direct the work for quality, timeliness and cost

The project team organisation Project Manager Procurement Co-ordinators Area Project Engineers Project control team – cost engineers, estimators and schedulers An engineering Manager

Typical project team organisation Project Manager Lead Piping Engineer Lead Process Engineer Engineering Manager Lead E&I Engineer Lead Civil Engineer Lead Mechanical Engineer Design Coordinator

The project team organisation Reporting directly to engineering manager are lead engineers of the following disciplines –Process engineering –Instrument engineering –Electrical engineering –Mechanical engineering –Vessel, civil, piping and structural engineering

9. Project Initiation The Kick off meeting Formally releases the contractor to begin work and describes client’s requirements Following above a less formal meeting of contractor’s project team – process engineer draw from experience to high-light any pitfalls to other disciplines e.g. coke formation in furnace piping design to mechanical engineers Project management aspect of the project are discussed i.e.. Completion dates with major milestones with indication of when cost estimates are to be updated and when critical project decisions would be made

Lead Engineer’s Responsibility Maintain quality Keep with in the project schedule Cost – in terms of person hours expended Prepare execution plan for approval by project manager Develop person hour budget and schedule to meet the master plan implementation Have the authority to direct work within their discipline to meet the project objectives

Design Coordinator's Role Maintain precise management control and interface during the development of PID and Equipment data sheets Have similar authority as any lead engineer Act as single source between engineering and the respective design functions ie flow of design drawings, material take-off data etc into the project This project organization brings order into the execution of the project.

The Project Procedure Manual Introduction Project Organisation and directory The master schedule Person hour budgets The cost code of accounts Project control procedures Correspondence and communication Conferences and meetings Filing index Individual engineering, procurement and design interface procedures Drawing index Field organisation and directory Hand-over procedure and close-out reports The basic requirement of PM is compiled at this early stage. An ideal time For key people to contribute to this.

Preliminary schedules and budgets Project manager must establish execution plan and measure the cost and preliminary schedules to implement he plan. This is followed by master plan budget and schedule by input supplied by various lead engineers and coordinators First six months mainly for front end activities – bulk of process engineering is completed followed by advising role and this concludes with input to preparing operating manuals and compiling data for process guarantees

Preliminary schedules and budgets Based on the scope of work process engineer prepares an execution plan Once approved by project manager lead process engineer prepare a bar chart for front end with person hour spread This then followed by other disciplines with their plan Project manager then develops the initial overall plan, master schedule and budget for the project

Typical Process Engineering Schedule

PID Conference and Approval In order to provide to other disciplines to commence effective work, a major milestone in achieving this objective is to conference the PID and have it approved by the client Although development of equipment data sheets already allowed the mechanical engineering and the procurement functions to start work but it is the release of approved PID puts the project into top gear.

PID Conference Basic Guidelines Preparing for the conference Location and Attendees Conducting the conference The flow sheet conference is a necessary activity but is nevertheless a high consumer of time.

Subsequent Process Activities Participation in equipment activities – ensuring safety, capacity and economy Participation in plot layout development – help in locating various plant items, also participation in plot layout conference for client’s approval. Subsequent development of PID – maintaining control of technical content. Once per week checking for addition and actions Developing the operating and plant commissioning manual Process guarantees and Guarantee Test Run – final process engineers activity during the project execution

Typical Operating Manual Pre-startup conditioning of the plant Plant start up Normal operation and trouble shooting Emergency action and shut-down Normal shut-down Catalyst regeneration

Typical Commissioning Instructions Pre-energising activities Energising the plant Conditioning equipment, calibrating instruments and setting relief valves Final check-out and closing up all vessels Preparation of start-up Start-up Lining out Performance test runs and guarantee test run Much of this done by the future operators of the plant

Concluding Remarks A process engineer plays a key role in both development and execution of the project. It is a very demanding/responsible role where he needs to satisfy the client’s requirements in terms of design, plant performance through to achieving guaranteed plant production.