SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting -- 15-Jan-2015.

Slides:



Advertisements
Similar presentations
BigBite Wire-Chamber Status Report Brandon Craver University of Virginia Hall A Collaboration Meeting June 23, 2005.
Advertisements

GEM Detectors for AnDY Nilanga Liyanage University of Virginia 1 Outline GEM chamber concept Large area GEM chamber projects Proposed GEM configuration.
Measurements of F 2 and R=σ L /σ T on Deuterium and Nuclei in the Nucleon Resonance Region Ya Li November 3, 2009 Jlab E02-109/E (Jan05)
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
MICE: The International Muon Ionization Cooling Experiment Diagnostic Systems Tracker Cherenkov Detector Time of Flight Counters Calorimeter Terry Hart.
Tagging spectrometer and photon beamline Review January 23-24, Response to Questions Bremsstrahlung Tagging Spectrometer and Photon Beam Review.
PHENIX Run-14 Status January 28, 2014 Klaus Dehmelt 1Klaus Dehmelt - Jan 28, 2014 RHIC Time meeting.
Zhihong Ye Hampton University Feb. 16 th 2010, APS Meeting, Washington DC Data Analysis Strategy to Obtain High Precision Missing Mass Spectra For E
SBS Program Management John J. LeRose SBS Collaboration Meeting October 18,
US CMS DOE/NSF Review: May 8-10, Endcap Alignment Dick Loveless DOE/NSF Review 9 May 2001.
PAIR SPECTROMETER DEVELOPMENT IN HALL D PAWEL AMBROZEWICZ NC A&T OUTLINE : PS Goals PS Goals PrimEx Experience PrimEx Experience Design Details Design.
PAC38 August 22, Publications in last year G0The G0 Experiment: Apparatus for Parity-Violating…NIIM A646, 59 E01-107Nuclear transparency and effective.
Status of Hall C 6 GeV Analysis Software Robust Fortran/CERNLIB code, “ENGINE”, for analysis of HMS/SOS coincidence and single arm experiments that has.
Jon S Kapustinsky 11/17/2010 Jon S Kapustinsky FVTX Commissioning Plan 1.71 Jon S Kapustinsky 1.
Elton S. Smith Tagger and Photon Beam Dry Runs Nov 14, Tagger and Photon Beamline Review and goals for today.
Status of Hall C 6 GeV Analysis Software Robust Fortran/CERNLIB code, “ENGINE”, for analysis of HMS/SOS coincidence and single arm experiments that has.
BigBite Wire Chamber Test Xin Qian Duke University Feb 20th For TRANSVERSITY Collaboration Wire chamber Gas Cerenkov Shower system Scintillator Magnetic.
AM Software Review. Hall C after 12 GeV Upgrade Beam Energy: 2 – 11 GeV/c Super High Momentum Spectrometer (SHMS) –Horizontal Bender, 3 Quads, Dipole.
Electron Spectrometer Work Package Simon Jolly 19 th May 2014.
DVCS-2 Assembly & Installation Charles Hyde DVCS Collaboration Meeting 18 December 2009 Clermont-Ferrand.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
Hall-C 12 GeV Project Status Howard Fenker 1/30/09 Hall-C January 2009 Workshop Overall schedule Detector Schedule What have people been working on? Reviews.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
1234 Dec Jan Feb 2007 Delivery of 500 MPPCs MPPC numbering Mass check MPPC soldering WLSF megastrip source scan ACFA Shipping Feb-14.
The Meson Test Beam Facility Erik Ramberg LRP Meeting – Oct. 30,2003 Delivering MI beam to MTBF User area layout Operational characteristics Detectors.
March running preparation Alexandre Camsonne Hall A meeting February 28 th 2014.
Thomas Jefferson National Accelerator Facility Page 1 Hall-C Hall-C 12 GeV Project Overview of SHMS detector system, Requirements, and Schedule Howard.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
MICE Phase 1 Koji Yoshimura KEK June
All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule.
Update on the GRINCH Detector SBS meeting, 21 Oct 2015 T. Averett, W&M JLab, NC A&T, JMU, Glasgow Timing-based gas Cherenkov detector PMT array-510 tubes.
1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
MOLLER Collaboration Meeting May 2014 Hall A Update Thia Keppel 1.
Transverse Momentum Dependence of Semi-Inclusive Pion and Kaon Production E : Spokespersons Peter Bosted, Rolf Ent, Hamlet Mkrtchyan 25.5 days.
The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.
PRad Recent Achievements 1)PRad Implementation (“Position”) document developed and submitted to Jlab. 2)Jlab’s Director Office scheduling review passed.
CLAS12 Drift Chamber Prototyping
The Q Weak Experiment Event tracking, luminosity monitors, and backgrounds John Leacock Virginia Tech on behalf of the Q Weak collaboration Hall C Users.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Status Report for E391a (Continuation of the previous PAC on April) G.Y.Lim IPNS, KEK Group Meeting at the JINR 26 th – 29 th July 2003 Dzhelepov Laboratory.
The 12 GeV equipment Hall D – Hall D – GLUEx detector for photoproduction experiments Hall B – Large acceptance detector CLAS12 for high luminosity measurements.
Commissioning Schedule and Shifts – First Call E906 Collaboration Meeting 23 February 2010.
Hall A Installation Review John J. LeRose 2/25/2009.
Experiment Readiness Review P. Rossi – Hall C Coll. Meeting Jan 21, 2016.
A N DY Status Commissioning with colliding beams (p  +p  at  s=500 GeV) L.C.Bland, for AnDY 22 February 2011 Time Meeting, BNL.
Run Coordinator Report February 5 to 8 Stepan Stepanyan JLAB 1.
Uva GEM R&D Update –Part I Kondo Gnanvo, Nilanga Liyanage, Vladimir Nelyubin, Kiadtisak Saenboonruang, Taylor Scholz and Adarsh Ramakrishnan In Collaboration.
Status of Hall C 6 GeV Analysis Software Robust Fortran/CERNLIB code, “ENGINE”, for analysis of HMS/SOS coincidence and single arm experiments that has.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
Status of the NOνA Experiment Satish Desai - University of Minnesota For the NOνA Collaboration APS Meeting - April 2013 Denver, Colorado.
A N DY Status Commissioning with colliding beams L.C.Bland, for AnDY 27 March 2012 Time Meeting, BNL.
CMS Status & Commissioning Menu: 1 Recent Progress Commissioning Prior to and After First Beam Commissioning with first LHC Events Outlook Wolfgang Funk.
Stephen Wood NPS Collaboration Meeting November 19, 2014 Hall C Status And Lab Perspective on NPS.
G-2 Calorimeter test beam “ T-519 has been assigned beam time is from Thursday July 17 to Monday morning July 27 at ESTB” LCLS is operating lower beam.
Minerva Test Beam 2 Status Geoff Savage for the Test Beam 2 Team March 23, /23/2015AEM - Minerva Test Beam 2 Status1.
Hall A Update Thia Keppel User Group Board of Directors January 2015.
CMS ROC Report Patricia McBride May 26, 2005.
SHMS Aerogel Detector Construction is complete
12-GeV Upgrade of Hall-C: Project Scope and Status
BigBite Spectrometer Status from Marathon to A1n/GMN
10/month is the present production rate 2 FTE + sporadic contributions
CMS RPC Endcap RE1 Status Report
CLAS12 First Experiment Workshop Report
Hall C KPP Demonstration March 10, 2017.
Preparation of the CLAS12 First Experiment Status and Time-Line
Status Report on E-166 Undulator-Based Production of Polarized Positrons K.T. McDonald Princeton University EPAC Meeting SLAC, November 15, 2003.
AM Software Review.
S. Stepanyan (JLAB) HPS collaboration meeting May 3 – 5, 2017 JLAB
Presentation transcript:

SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015

Status of Detectors for SHMS Noble-Gas Cerenkov – Mount Optics in Box at Jlab ESB during UVa Spring Break. – Mirrors are at CERN being aluminized Drift Chambers – Tested. See talk later today. – Move to JLab ESB in Feb. for Electronics & Cosmics Hodoscopes – At NCA&T and JMU and JLab. Frames at W&M – All cosmic tested and Ready to install. Heavy-Gas Cerenkov – At JLab ESB. Tested. Ready to install. Aerogel Cerenkov – See talks later today Pre-shower and Shower Counters – Installed and Tested! – See talk later today. Active-Sieve GEM – Tested. Mounting hardware ready. Installation in Summer 2016.

System Status High Voltage Signal Cables DAQ Gas Computing Sieves & Collimators Beamline Vacuum System Scattering Chamber

SHMS Schedule DRAFT NOT OFFICIAL 12GEV DATELINE 1/12/15

Detector Installation Planning DETECTORBENCH TEST INSTALLCOSMICCONNECT Shower ✔✔✔ Feb 2015 Preshower ✔✔✔ Feb 2015 S2X & Q2Y ✔ Spring & Summer 2015 Aerogel Č ✓ Heavy Gas Č ✔ S1X & S1Y ✔ (Wait for Dipole Installation and Final Assembly – Tests Finish by 9-May-2016) Drift Chambers ✔ May 2016Summer 2015 May 2016 Noble Gas Č April 2015June 2016

Commissioning-With-Beam Week’s Activities – CONCEPTUAL PLAN ONLY– Establish beam into the Hall Set Magnets to Nominal Currents / Fields Rough timing of hodoscopes, etc. Establish basic coincidence trigger Reconstruct low-resolution tracks in Drift Ch. Obtain calibration data for PID systems Observe low-res. elastic peak Exercise DAQ rate

Commissioning-Week Shifts ~August 2016 … One week … 21 Shifts Will Need a Plan Will Need a Run Coordinator Need Staff: Hardware AND Software Experts – JLab Staff (Techs, Engineers, Scientists) – Users

The End …but the Beginning is in sight!