WisDOT Geodetic Surveys Unit Best Practices: Strategies for Reducing Plat Changes Wisconsin Department of Transportation Statewide Real Estate Conference.

Slides:



Advertisements
Similar presentations
Right of Way Acquisition Process Jesse W. Smith Right of Way Manager.
Advertisements

ODOT’s Public Involvement Process PI and the Project Development Process Minimum PI Requirements.
Guidebook for Risk Analysis Tools and Management Practices to Control Transportation Project Costs Keith R. Molenaar, PhD Stuart D. Anderson, PhD, PE Transportation.
1. Set expectations and measure performance ◦ What employees are expected to do for their organization in return for pay and benefits ◦ Allows employees.
Staff Council Presentation You and Your PSD “Position Source Document” Human Resources Eduardo Salaz Associate Vice President and Chief Human Resources.
Appraisal, Acquisition & Relocation System (AARS) REAL ESTATE SECTION LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT.
FDOT R/W Guidelines Use of License Agreements
1 C E T A S Range of Alternatives Presentation Date Project Name Project location (city, county) ODOT Key Number:
Procurement.
2010 Long-Term Surveillance and Maintenance Conference Lessons Learned for Institutional Controls at the Weldon Spring Site.
Warm – Up Housing Question Monday, October 7, 2013 While creating your budget, what was most important to you have enough money for?
AUDITS Process and Corrective Actions OIG RolesGAO ROLES – OIG –OIG Lead Auditor –OCFO – owner of MATS and Agency Audit Process –OEI AA – Designated OEI.
1 DRAFT CCC Team Leader Packet September 23, 2002.
Greenfield District Utility/RR Engineer, INDOT
Understanding Right of Way Process Dawn Haecker - Training & Technical Support Supervisor INDOT Trent Newport - VP, CrossRoad Engineers.
Work Plan Development Steve Robinson Highway Utility Engineer, INDOT June 11, 2015.
W E L C O M E to the SB 1022 Real Estate Due Diligence Training SB 1022 Real Estate Due Diligence Training.
Platting Update Orange County BCC January 27, 2015.
1 Introduction to QA/QC Process. 2 CHECKLISTS SheetsItems to CheckGeneral Reference YesYes NoNo N/AN/A General General Plan Content DM=Design Manual General.
Registration and Assessment There are 3 periodic assessments throughout the PhD: Assessment 1: the Research Plan (by 8 weeks) All students must complete.
NORMA GOMEZ, MBA, MSN, RN, CNN Unique Challenges for the Nephrology Professional in Managing Change.
2014 Work Planning Local Program Leadership Team.
Tribal Benefits from State Implementation Plan (SIP) Process Involvement Rosanne Sanchez New Mexico Environment Department Air Quality Bureau.
Module 19 STEP 9 Completion of the Feasibility Study Module 19 STEP 9 Completion of the Feasibility Study Civil Works Orientation Course - FY 11.
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT August 21, 2014.
© 2012 IBM Corporation Rational Insight | Back to Basis Series Documents and Record Control Liu Xue Ning.
Billie Smith GSFC Procurement Operations Division December 8, 2004 Prenegotiation Position and Price Negotiation Memorandums.
From Planning to Pouring: The Evolution of Safe Routes to School Julie Walcoff, Ohio DOT, Columbus, OH Alex Smith, Columbus Public Health, Columbus, OH.
 Coordinating construction related training  Following and gathering info for construction related performance measures  Follow Contract Modifications.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
Utility & Rail Coordination in Project Development Jennifer McCleve Utilities & Rail Branch Manager.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
PLANNING DEPARTMENT CITY OF PEARLAND PLANNING DAY MARCH 13, 2008.
ADOT Multimodal Planning Division Planning Assistance for Rural Areas (PARA) Program Overview December 4, 2013.
Understanding Right of Way Process Dawn Haecker, Training & Technical Support Supervisor, INDOT Trent Newport, VP, CrossRoad Engineers.
RECORD OF CONTACTS KELLY DIVINE DISTRICT 3 RIGHT OF WAY SUPERVISOR.
CHAPTER#08 MANAGEMENT OF TECHNICAL PROPOSALS AND SPECIFICATIONS Lecture No. 08 Course: Engineering Management 19 april 2013 MED DEPARTMENT, U.E.T TAXILA.
RIGHT OF WAY BEST PRACTICES FOR LOCAL PUBLIC AGENCIES.
Working Effectively: Best Practices for Real Estate Project Management WisDOT Real Estate Training Conference Presenter: Jessie Prien May 14, 2013.
Assembling the Team Wisconsin Department of Transportation Real Estate Training Conference May 14,
FAO/WHO CODEX TRAINING PACKAGE SECTION TWO UNDERSTANDING THE ORGANIZATION OF CODEX Module 2.5 How do Codex Committees function?
IDM Chapter 104 Utility Coordination Gail Lee Utility and Railroad Engineer, INDOT June 10, 2015.
Mass Highway Department (MHD) Design Process Anticipate possible use of MHD funds Anticipate possible use of MHD funds New Design Guide for Project Development.
IRWA Educational Mini Conference IRWA Educational Mini Conference Chapter 26 Presenter: Richard Diaz, Jr. P.E. September 16-17, 2010  Reading Right-of-Way.
Advocacy: Influencing Facility Development in Public Parks and Recreation Departments Tennis advocacy should occur year round through informal communications.
Construction Review LaVon M Marshall Greenfield District Utility/RR Engineer, INDOT June 11, 2015.
Project Development Process. ODOT’ PDP A project management and transportation decision-making tool. Developing the detail to the level necessary to make.
City of Cincinnati Law Department Real Estate Services.
Public Involvement. Why? Who Cares? –What we do matters to the public –Effective PI enables proactive input and enhances the decision- making process.
Dawn Van Oudenhoven – WisDOT NE Region Jacob Hoagland – Asset Equipment Appraisals September 30, 2015 Chula Vista Resort, Wisconsin Dells.
Request for Service (RFS) Process and Metrics Update June 24, 2008.
Project Chartering & Approval Process
Residential Plats Orange County Board of County Commissioners August 19, 2014.
PROJECT MANAGEMENT TRACKING SCHEDULES Audrey Demeter, PE,PM Casey Unrath, EIT.
Coordination of Right of Way on Design-Build Contracts By- Richard Bennett State Right of Way Director Virginia DOT.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
Geopak for MoDOT Right of Way & Location Survey Plans.
North Carolina General Statute May 2009 Gary Thompson, PLS work
Dave Adamson Design Network launched 2 years ago Had many good ideas Discipline tracks Activity ownership Milestone meetings Promised “Not Static”
Coordinating with Project Managers Cassie Reiter, P.E., ENV SP Utility Coordinator/Project Manager CMT Engineers and Consultants June 2016.
MSA PROFESSIONAL SERVICES, INC. | More ideas. Better solutions. INTRODUCTION Professional Land Surveyor.
PLWG Review 6.9 and the Interconnection process
Preparing a Right of Way Clearance Certification Request
Reliability Standards Development Plan
Research Phase, Indiana 811, Initial Notice, Verification
NERC Reliability Standards Development Plan
Understanding the Right-of-Way Process
NERC Reliability Standards Development Plan
ePerformance: A Process Crosswalk May 2010
(Project) SIGN OFF PROCESS MONTH DAY, YEAR
Presentation transcript:

WisDOT Geodetic Surveys Unit Best Practices: Strategies for Reducing Plat Changes Wisconsin Department of Transportation Statewide Real Estate Conference Rodney Key, R.L.S. Robert Duffeck, R.L.S. Paul Vraney, P.E. May 15, 2013

Summary of Plat Errors Summary of Plat Errors Best Practices Background Best Practices Background Best Practices Subjects & Recommendations Best Practices Subjects & Recommendations Best Practices – SE Region Best Practices – SE Region Plat Development Process – NE Region Plat Development Process – NE Region “Lessons Learned” “Lessons Learned” Questions and Answers Questions and Answers Discussion Points 2

WisDOT Geodetic Surveys Unit 3

Types of Errors Which Cause Amended Plats Utility Issues Strategies for Reducing Plat Changes 1. Compensability 2. Add/Remove Utility Parcel 3. Add Pedestal or Pole Design/Acquisition Issues 1. Add/Remove Parcels 2. Change Acquisitions – Fee, TLE, PLE, AR, HE 3. Scope Changes 4. Fast Track Projects Other Issues 1. Errors in Schedule 2. Errors in Legal Description 3. Section Corner Coordinate Errors 4. Ownership Changes 5. Boundary Errors 4

Committee Began Meeting August 18, 2000 Committee Completed Recommendation April 4, 2001 Members: Representing: Russell Zick D-1 R/W Plat Unit Robert Roszkowski D-2 Design Service Unit Bruce Enke D-3 Project Dev. Unit Roland Hawk D-4 Project Dev. Unit Janice Crooks D-5 Real Estate Unit Mike Ostrowski D-6 Project Dev. Chief Paul Weigandt D-7 Real Estate Unit Hugh McDonald D-8 R/W Plat Unit Rodney Key CO Surveying/Mapping Ken Brockman CO Surveying/Mapping Best Practices Committee To Reduce Late Design Changes 5

WisDOT Geodetic Surveys Unit 6 18 Best Practices for Reducing Plat Changes

WisDOT Geodetic Surveys Unit 7 Best Practices for Reducing Plat Changes

WisDOT Geodetic Surveys Unit 8 Best Practices for Reducing Plat Changes

9 OWNERSHIP INFORMATION SHEET

10 Best Practices for Reducing Plat Changes

Goal: Reduce number of plat revisions for parcels from 50% to 15% Problem: Input to project development process is not always timely. Solutions: 1.Get more timely input and establish realistic individual acquisition project schedules at or before 60% review meeting. project schedules at or before 60% review meeting. 2. The following 30% plan content will be ready at 30% review meeting. meeting. Title SheetTitle Sheet Typical Section SheetTypical Section Sheet Horizontal AlignmentsHorizontal Alignments Vertical AlignmentsVertical Alignments Cross Section SheetsCross Section Sheets Best Practices to Reduce Design & Plat Changes (SE Region) 11

Goal: Reduce number of plat revisions for parcels from 50% to 15%. 3.For the 60% project review, refer to FDM 15-1 Attachment 4.1Checklist. Six key items will be reviewed. Typical Sections SheetTypical Sections Sheet Intersection geometrics, esp. signalizedIntersection geometrics, esp. signalized Construction Staging PlanConstruction Staging Plan Final AlignmentFinal Alignment Drainage PlanDrainage Plan Cross section sheetsCross section sheets 4.A Real Estate ad hoc member and the PM will determine at the 30% review meeting if a Property Owner Meeting (POM) is necessary. A project with large acquisitions should have a POM meeting. Preliminary r/w staking of parcels will occur within 30 days of POM. This should be after 60% review. 5.If a property owner does not attend POM, a representative from Real Estate will contact them by letter. Best Practices to Reduce Design & Plat Changes (SE Region) 12

Real Estate Guide to Transportation Project Plats Plat Appraisal Date 1.Date is a reference for appraisers to note version of plat used to appraise a particular parcel. 2.Date is located outside plat sheet border. 3.Date will be revised whenever changes in interest are made to plat sheet prior to Relocation Order approval date. 4.Region should copy appropriate, unrecorded plat sheet(s) to appraiser (and reviewer) as soon as possible. Regions should wait as long as possible to send appropriate completed and signed TPP sheet to BTS-RE plat coordinator to ensure all R/W needs are known and accurately depicted on plat. Survey and Mapping will send image to Register of Deeds. Sending TPP sheet to Register of Deeds Amendments to Plat and Legal Descriptions Effort will be made to file a TPP sheet only once, but there will be occasions when it becomes necessary to file an amendment plat. FDM explains methods for modifying the plat. 13

Key Elements for Success: Key Elements for Success: PDS and Real Estate Project Managers and Plat Coordinator working togetherPDS and Real Estate Project Managers and Plat Coordinator working together Identifying schedule and risks early in project development processIdentifying schedule and risks early in project development process Setting up reoccurring coordination meetings or on- need basisSetting up reoccurring coordination meetings or on- need basis Being flexible toward accommodating team member’s needsBeing flexible toward accommodating team member’s needs Region sections available for consultation and inputRegion sections available for consultation and input All plat review team members actively engaged in processAll plat review team members actively engaged in process Plat Development Process - NE Region 14

Typical Overall Project Timeframes: Typical Overall Project Timeframes: Small Project with Real Estate - 52 monthsSmall Project with Real Estate - 52 months Medium Project with Real Estate - 65 monthsMedium Project with Real Estate - 65 months Large Project with Real Estate - 78 monthsLarge Project with Real Estate - 78 months o Timeframes include PMP Load Meeting to Final PS&E Submittal o Includes 3 months (small project) to 9 months (large project) timeframe for title searches early in project - may be condensed o Includes 12 months (small project) to 20 months (large project) timeframe for completing from 30% to 60% design Plat Development Process - NE Region 15

Typical Plat Development Timeframes: Typical Plat Development Timeframes: Pre-Final PlatPre-Final Plat o Small Plat - 5 months o Medium Plat - 8 months o Large Plat - 10 months o Includes time for plat review meeting Final PlatFinal Plat o Small/Medium Plat - 4 months o Large Plat - 8 months o Timeframe includes preliminary property owner contacts Small right of way plat - Less than 25 parcels Medium right of way plat - 25 to 50 parcels Large right of way plat - Greater than 50 parcels Plat Development Process - NE Region 16

Typical Real Estate Acquisition Timeframes: Typical Real Estate Acquisition Timeframes: Small - 12 monthsSmall - 12 months Medium - 18 monthsMedium - 18 months Large - 24 monthsLarge - 24 months Small - no relocations, no complex Medium - 1 to 5 residential relocations, 1 to 10 complex Large - greater than 5 residential or 1 business relocation, greater than 10 complex Plat Development Process - NE Region 17

Key Elements for Success by PDS Project Manager: Key Elements for Success by PDS Project Manager: Develop accurate slope intercepts. Use widest SI footprint for staged constructionDevelop accurate slope intercepts. Use widest SI footprint for staged construction Sit down with plat developer to describe right of way needsSit down with plat developer to describe right of way needs Consider utility relocation needs when laying out right of wayConsider utility relocation needs when laying out right of way Address all access needs and restrictions, including alterations to existing accessAddress all access needs and restrictions, including alterations to existing access Seek consultation from other sections (i.e., Maintenance, Planning) for access needsSeek consultation from other sections (i.e., Maintenance, Planning) for access needs Attain property owner comment prior to setting final platAttain property owner comment prior to setting final plat Plat Development Process - NE Region 18

On projects with a tight schedule, identify and acquire parcels where utilities need to be relocatedOn projects with a tight schedule, identify and acquire parcels where utilities need to be relocated Know when to limit negotiationsKnow when to limit negotiations JO is not necessarily a bad thingJO is not necessarily a bad thing Acquire excess R/W where schedule is tightAcquire excess R/W where schedule is tight PDS coordination with plat developersPDS coordination with plat developers Too much time/too little timeToo much time/too little time Continue R/W staking prior to negotiationsContinue R/W staking prior to negotiations Dialogue with property ownersDialogue with property owners Know the process and the playersKnow the process and the players “Lessons Learned” 19

WisDOT Geodetic Surveys Unit 20 For Further Guidance: See Chapter 12/Facilities Development Manual See Real Estate Program Manual

WisDOT Geodetic Surveys Unit 21 Questions ? ? ? ? ? ? ? ? ? ? ? ?

WisDOT Geodetic Surveys Unit 22 Thank You! Rodney Key, R.L.S. Robert Duffeck, R.L.S. Paul Vraney, P.E.