Summary of Collaboration “EOI’s” for the CLIC technical developments 2012-2016 HS for CTC.

Slides:



Advertisements
Similar presentations
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Advertisements

Collaboration K. Artoos, CTC 8th February 2011 Active Structures Laboratory Department of Mechanical Engineering and Robotics Université Libre de Bruxelles.
CLIC stabilisation contribution A.Jeremie, B.Caron, A.Badel, R.LeBreton, J.Lottin, G.Balik, J.P.Baud, L.Brunetti, G.Deleglise, S.Vilalte.
CLIC Kickers: Status and activities for 2013 in view of the budget discussions for 2013 CTC #65 M.J. Barnes CLIC Technical Committee, November M.J.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
F. Toral CLIC Workshop CIEMAT contribution to CLIC Experimental Verification F. Toral on behalf of Accelerator Technology Group, CIEMAT.
INTEGRATION OF RF STRUCTURES IN THE TWO-BEAM MODULE DESIGN G. Riddone, CERN, Geneva, Switzerland A. Samoshkin, D. Gudkov, JINR, Dubna, Russia Abstract.
Summary of AWG4: Beam Dynamics A. Latina (CERN), N. Solyak (FNAL) LCWS13 – Nov 11-15, 2013 – The University of Tokyo, Japan.
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
1 LAPP in ATF2 Extraced from ANR bid A.Jeremie. 2 LAPP in ATF2 Current activities related to accelerators: The LAPP-Annecy team is currently developing.
1 Albrecht Wagner DESY and the ILC DESY today DESY strategy and funding DESY and the ILC Funding from the European Union KEK/DESY Collaboration.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
D. Angal-KalininEUROTeV Annual Meeting, DESY WP2 : Beam Delivery System D. Angal-Kalinin ASTeC, STFC, Daresbury Laboratory 4 th EUROTeV Annual.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
TBL as a 12 GHz power source, overview and first results from commissioning IWLC 2010 workshopSteffen Döbert, BE-RF  Current status of TBL  Status of.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN.
9 th AWAKE Technical Board 11 March Actions from Last Technical Board WP laser and MPP: decide until March 2015 which compressor design will be.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
Introduction to the X-band resource estimation exercise W. Wuensch Collaboration meeting 3 November 2011.
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
CTF3 Probe Beam G. A. Blair Royal Holloway Univ. London CTF3 Meeting, CERN 30 th November 2005 Introduction – UK Context Draft Proposal Future prospects.
Meeting of the European Global Design Effort Report from INFN non EU-funded R&D Carlo Pagani University of Milano and INFN DESY, 10 May 2006.
CLIC Workshop th -17 th October 2008 Thomas Zickler AT/MCS/MNC 1 CLIC Main Linac Quadrupoles Preliminary design of a quadrupole for the stabilization.
BDS: 1 October 13, 2007 BDS KOM EDR planning discussion Andrei Seryi October 13, 2007.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
Contribution from Pakistan to CLIC & CTF-3 Project. NASIR ABBAS
WP2 status Gijs de Rijk This project has received funding from the European Community's Seventh Framework Programme (FP7/ )
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
TBTS Test Program & Schedule G. Riddone
CLIC Controls – for the CDR Mick Draper Accelerator Control group, CERN.
CLIC requirements on Warm Magnets (for CLIC Modules mainly) 1 M. Modena, CERN TE-MSC 13 April 2011 CERN-UK Collaboration Kick-off Meeting.
1 CTF3 collaboration meeting Jan 2008 G.Geschonke Status of CTF3 G.Geschonke CERN.
SUM ESR ESR ESR ESR ESR ESR ESR ESR (TBC)
Accelerator Activities at Spain Madrid CIEMA T CMAM Valencia IFIC Bilbao ESS Barcelona ALBA UPC Sevilla CNA 1 PAC-ILC May 2010.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
Alignment system and impact on CLIC two-beam module design H. Mainaud-Durand, G. Riddone CTC meeting –
FP7: EuCARD after a year of preparation… A.Jeremie.
TBL experimental program Status and Results  Introduction  Status  Experimental program for 2010 and beyond  Outlook ACE, Steffen Döbert.
1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN.
EuCARD NCLinac 9.3 Linac and FF Stabilisation A.Jeremie.
25 October 2004O. Napoly, EU-GDE meeting in Oxford 1 French Funding Agencies CNRS/IN2P3 : National research Institute on Nuclear Physics and Particle Physics.
CLIC survey and alignment studies 1 CTC meeting, 13 th January 2009 STARTSLIDE CLIC Survey and alignment studies Jean-Pierre QUESNEL, Hélène MAINAUD DURAND.
BRAINSTORMING ON LASER BASED SOLUTIONS FOR CLIC PRE-ALIGNMENT INTRODUCTION Hélène MAINAUD DURAND, BE/ABP/SU, 09/02/2010 Status of the study CLIC pre-alignment.
H. Danared | Collaboration Board | Page 1 Status of In-Kind Contributions Håkan Danared Legnaro, 1 December 2014.
H. Danared | Collaboration Board, March 2014 | Page 1 Status of In-Kind Contributions to Accelerator Håkan Danared Kastrup, 14 April 2014.
R. Corsini CLIC work-package planning meeting 2-3 November 2011 Introduction to the session.
CTC Work Packages ver 2.1 HS for CTC. CTC-001SC wigglers Cooling design, hor. or ver. Racetrack coil Nb3Sn or NbTi cable Prototypes construction Experimental.
Module layout and types Two-beam module review, September 2009 Module layout and types G. Riddone for the CMWG,
Status of the CLIC module R&D G. Riddone on behalf of the CLIC module WG (special contributions from A. Samoshkin, D. Gudkov, A. Solodko, N. Gazis)
TBL experimental program, evolution to RF power testing in TBL ACE 2011, February 2-3Steffen Döbert, BE-RF  Current status of TBL  Experimental program.
AMICI WP1 – Management, coordination and dissemination
Work packages : Overview of experimental verification, CTF3 and CLIC Zero R. Corsini for the CLIC/CTF3 Collaboration Basically all WP scientific and.
CLIC work program and milestones
CLIC module working group
CLEX* Status and Plans CTF3 complex CLEX
CLIC-Spain collaboration report
WP1 Metrology & Alignment
M.Jonker CTC MPO-WG status
Work-packages for , planning and status
CTF3 Collaboration Technical Meeting January 2008
What Should We Do?.
CLIC-ILC BDS & MDI work.
CLIC Beam Instrumentation
Two-beam Test-stand Design and Construction Status
Presentation transcript:

Summary of Collaboration “EOI’s” for the CLIC technical developments HS for CTC

CTC-WIG: Damping Rings Superconducting wiggler To be ready for beam in ANKA in the year 2012 this program will need a temporary loan of a PM wiggler for ANKA (CERN charge to find one)

News Well established collaboration with KIT (Karlsruhe, DE) and implicitly through KIT with Novosibirsk. Legally binding contract drafted by KIT (k-contract). Needs CERN FC approval in March 2012

CTC-SUR Survey and Alignment

Survey and alignment:  2 possibilities of collaboration were discussed: with Ciemat (F. Toral) : o A Spanish technological centre TEKNIKER, is very interested to participate in the development of the alignment systems for two beam modules. o Funding could be by means of a National Program of the Spanish Ministry of science and Innovation, to be confirmed. o One possible project: manufacture of cam movers for the two beam modules. With JINR (M. Lyablin): o New concepts in the High precision large distance metrology are under investigation o Further technical discussion planned in December  Technical collaboration with DESY: DESY planned week 46  Collaboration with NIKHEF: Franck Linde could not attend this meeting, but will be at CERN week 47 to discuss Nikhef’s longer term CLIC involvement.

CTC-QUA Quadrupole stability

CTC3 Quadrupole Stabilisation K. Artoos, Geneva 3 November, 2011 Université Libre de Bruxelles (ULB), Belgium CEA/ IRFU, Saclay, France LAPP, SYMME, Annecy, France Interaction with CD-MDI Interaction with CD-SIM/ LUMI

CTC3 Quadrupole Stabilisation K. Artoos, Geneva 3 November, MoU Possible P (FTE)M (kCHF)P(FTE)M (kCHF) ASL/ ULB5 CEA/IRFU1.5~260 LAPP8.4~195 SYMME3~13 (In alphabetical order) ~ : Euro

CTC-TBM: two-beam module development CLIC Linkperson: G. Riddone

CTC-TBM two-beam module development Other comments: total modules considered for construction: (see task 1); All deliverables for modules (Alignment, Stabilization, BI, vacuum, RF structures etc) paid by TBA module budget.

DUBNA-JINR Engineering design and integration, QA: mechanical engineers at CERN Next: extend the collaboration with the production of module components (dedicated meeting with top management on Greece – several universities engineering design, databases, labview programming, alignment/supporting system studies, radiation tests Next: organize a dedicated meeting to understand better the contribution CIEMAT PETS for the two-beam modules in CLEX Next: extend the collaboration to RF components and definition of quantities until 2016 RRCAT Next: PETS and RF components production – definition of the “addendum”

ACAS Module assembly and alignment Next: dedicated meeting to finalize task and ressources HIP/NorduCLIC FEA, cost study and industrialisation, test results analysis Next: team will grow and new people will come to CERN NCP Engineering design of module components and fabrication of vacuum components Next: extend the collaboration to the production of the RF structures for the module (prototype parts already made at NCP) – Organization of a meeting to discuss details and results from prototype measurements

WP: CTC-WMP Warm Magnet Prototypes

News None, but well established collaboration within the CERN-UK collaboration package.

CTC-BDI: Beam Instrumentation

- North-Western University of Illinois: no more funding for CLIC but can provide Students - LBNL: Providing devices for imaging system for photons in the keV range: Table received - Devices to be tested as X-ray beam size monitors for Damping ring on existing light source and/or CESRTA - RHUL/Oxford: Existing k-contract for several developments : Cavity BPM / OTR / LWS and testing on ATF2 - University of Dundee / ASTeC-Daresbury: Existing k-contract on Bunch length measurements using E-O techniques - LAPP/Annecy: Drive Beam BPM electronic, also part of the CLIC control workpackages – Table received - U. Barcelona: Interest to continue working on the CLIC Beam Position Monitor electronic. 1FTE - IFIC: Involve in the design of CTF3 / Drive Beam Beam Position Monitor also part of the CLIC0 instrumentation workpackages: Table received Discussion on CLIC Beam instrumentation – 3/11/2011

WP: CTC-PCLD Beams disposal (post collision line and dumps)

News Meeting with top management from Minsk (SOSNY institute) was planned during 3./ Meeting.  delayed by 2-3 weeks due to small accident of lab- director. Expect MoU for simulation work on beam dumps and potential prototype fabrications signed this year and project associates working at CERN from january 2012.

WP: CTC-CO Controls

Controls WP Task 1: ft second timing: no support from external collaborators so this task has been dropped. Task 2: Module read-out: – Agreed to formalize collaboration between LAPP (S. Vilalte) and BE-CO (M. Vanden Eynden & J. Serrano). Will collaborate on specifying and prototyping the Acquition Control Module (ACM) for all equipment classes (BI, Vacuum, RF, Power Converters, CV). Propose the platform (microTCA, PCIe,..), read-out electronic cards, the communications between the ACM and the front-end processing equipment (e.g. GBT in collaboration with PH),and the controls s/w needed. – LAPP will provide 2.5 FTE or electronics engineers FTE front-end s/w kEuros/year. – BE-CO can provide 1 FTE (fellow from 1Q2012) + up to 1 FTE (across many people). – Start-up meeting between CERN and LAPP (10/11/2011) where technical issues/choices will be documented. Plan how work will be split between LAPP and CERN. – Define successive phases (iterative approach with functional prototype systems) to be installed on CTF3 and other Cern accelerators Task3: Design of control system: Will not start before Depends on Task 2.

WP: CTC- RF systems

News Proposal by INFN to work on combiner ring RF deflectors (task2)

WP: CTC-EPC powering

News Expression of Interest by RRCAT (India) to build a prototype of the modulator for the high power 1 GHz klystron (Dr. P. Shrivastava )  will be followed up “we have several new collaborations close to be finalized” = quote S.Pittet (subjects not treated during this event).

Summary Not mentioned CTC workpackages have not been treated during this event, but collaborations exist. Large interest in collaborations with a high match of proposed activities to the real needs of the project. General tendency: Solid proposals or commitments for the next 2 years; Reluctance to go beyond. Sparse proposals for financial contributions; dominant EOI’s are for manpower; this will need good organisation for follow-up and communication.