Presentation is loading. Please wait.

Presentation is loading. Please wait.

What Should We Do?.

Similar presentations


Presentation on theme: "What Should We Do?."— Presentation transcript:

1 What Should We Do?

2 Some Formal Points The duration of the project will be 4 years
The request for EU funding needs to be reduced The number of JRAs needs to be reduced Suggested is to merge at least LED, EUROdrive and High Gradient Will give more flexibility in distribution of resources From ILC, a number of additional requests to extend the FP7 bids came in late Will be integrated where they fit But request already has been too large Firm commitments are to be made before end of September

3 EUROdrive Topics 1) Drive beam phase feedback system
2) Drive beam alignment and tuning procedures 3) Breakdown measurements in CTF3 High Gradient 4) CLIC machine protection system Also GADGET 5) Main beam simulation studies Very low level of resources 6) Longitudinal bunch profile measurements

4 LED Topics 1) Demonstrate main linac quadrupole stability
2) Explore sub nanometer stability for final doublet quadrupoles 3) Characterise the noise of different machine components in CTF3 add ATF2, but needs not be part of FP7 4) Develop ultra-fast transverse feedback system What needs to be done beyond FONT? 5) Main beam luminosity studies. Very small amount of resources

5 LED Topics II 6) Determination of requirements for IP instrumentation, stabilisation and feedback It is not clear how this can be tied to CTF3. Possible if small request of resources. 7) Test of girder and quadrupole alignment equipment with beam 8) Accelerating structure alignment on the girders and to the beam 9) Development of fast beamstrahlung and beam energy monitors that can resolve the beam pulse 10) Crab cavity development and tests in CTF3

6 LED Topics III 11) Laser wire
12) Design of alternative ILC interaction regions Could be integrated but hard to justify resource requests 13) Beam dumps Were not in the scope of the LED JRA, mainly looks like engineering

7 Combined Topic List 1) Drive beam phase feedback
Mainly address the phase monitor 2) Longitudinal profile monitor to be coordinated with GADGET 3) Beam tuning studies mainly focus on the drive beam maybe can add a little for ATF2 Need to fit program development in 4) Machine protection mainly focus on loss monitors can integrate some simulations

8 Combined Topic List II 5) Demonstration of 1nm stability in main linac
6) Sub-nanometer stability for final doublet 7) Precision alignment equipment 8) Accelerating structure mechanical alignment 9) Crab cavities 10) Laser wire 11) Supporting simulation studies I consider this vital Can include design Will probably get limited funding

9 New Topic List III 11) Things from the seperate lists that are well enough supported Fast feedback Luminosity monitoring Beam dump 12) High gradient and precision topics

10 Next Steps Programme must be established before beginning of September
Firm commitments need to be made before end of September Need more formal approach Everyone is to provide a description of their contribution Requested resources must be specified Matching funds must be specified (>2*request) Indication of level of certainty We will send out a template Will need to reduce requests soon Make sure that yours are registered in time

11 Other Points Organisation into JRAs and tasks will need to be done
But should be relatively transparent for the work The formal contacts in your laboratory need to be prepared The reporting will later be based on a scientific and an administrative path We should meet in person Presentations at CARE meeting (September 10) Maybe use time of CLIC meeting (October 16-18) for technical preparation of the bids

12 Required Information Fill in the template as soon as possible
If you have questions contact us First selection will be made on matching funds Make sure you can bring a firm commitment as soon as possible The programme needs to be well defined Objectives will be required Work description will also be required In activities involving several partners this may take a bit more time Still be quick with the commitment confirmation


Download ppt "What Should We Do?."

Similar presentations


Ads by Google