Design & Layout of Foodservice Facilities

Slides:



Advertisements
Similar presentations
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Advertisements

Systems Analysis and Design
Systems Analysis and Design With UML 2
Accounting Information Systems
ACCOUNTING INFORMATION SYSTEMS
Reid & Sanders, Operations Management © Wiley 2002 Aggregate Planning 13 C H A P T E R.
© Copyright 2011 John Wiley & Sons, Inc.
MEM 612 Project Management Chapter 3 Planning the Project.
Chapter 18: Controlling – Processes and Systems
Accounting Principles, 6e Weygandt, Kieso, & Kimmel
ACCOUNTING INFORMATION SYSTEMS
PowerPoint Presentation for Dennis & Haley Wixom, Systems Analysis and Design Copyright 2000 © John Wiley & Sons, Inc. All rights reserved. Slide 1 Systems.
Evaluating and Terminating the Project
Managerial Accounting by James Jiambalvo
Managerial Accounting by James Jiambalvo Chapter 1: Introduction to Managerial Accounting Slides Prepared by: Scott Peterson Northern State University.
Management, 6e Schermerhorn Prepared by Cheryl Wyrick California State Polytechnic University Pomona John Wiley & Sons, Inc.
Project Management © Wiley 2007.
Management, 6e Schermerhorn Prepared by Cheryl Wyrick California State Polytechnic University Pomona John Wiley & Sons, Inc.
Information Technology Project Management
Chapter 13 Prepared by Richard J. Campbell Copyright 2011, Wiley and Sons Auditing Human Resources Processes: Personnel and Payroll in Service Industries.
Systems Analysis and Design with UML Version 2
Slide 1 Systems Analysis and Design With UML 2.0 An Object-Oriented Approach, Second Edition Chapter 1: Introduction to Systems Analysis and Design Alan.
Chapter 121 The Examine Process Chapter 12 Achieving Quality Through Continual Improvement Claude W. Burrill / Johannes Ledolter Published by John Wiley.
Chapter 3, Part 1 Product Design
ACCOUNTING INFORMATION SYSTEMS
MODERN AUDITING 7th Edition Developed by: Gregory K. Lowry, MBA, CPA Saint Paul’s College John Wiley & Sons, Inc. William C. Boynton California Polytechnic.
Job-Order Costing for Manufacturing & Service Companies
John Wiley & Sons, Inc. © 2005 Chapter 15 Managerial Accounting Prepared by Barbara Muller Arizona State University West Principles of Accounting Kimmel.
© Copyright 2011 John Wiley & Sons, Inc.
Chapter 101 The Design Process Chapter 10 Achieving Quality Through Continual Improvement Claude W. Burrill / Johannes Ledolter Published by John Wiley.
Design & Layout of Foodservice Facilities Reading Architectural Drawings Using the Architects’ Scale.
Slide 11-2 CHAPTER 11 Standard Costs and Variance Analysis Standard Costs and Variance Analysis.
Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.5-1.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Chapter 111 Information Technology For Management 6 th Edition Turban, Leidner, McLean, Wetherbe Lecture Slides by L. Beaubien, Providence College John.
Copyright © 2000 John Wiley & Sons, Inc. All rights reserved
Chapter 16 Information and Operations Management 1e Management 1e - 2 Management 1e Learning Objectives  Explain how managers use controls.
Chapter 18-1 C H A P T E R 18 REVENUE RECOGNITION Intermediate Accounting 13th Edition Kieso, Weygandt, and Warfield.
Slide 1 Systems Analysis and Design with UML Version 2.0, Second Edition Alan Dennis, Barbara Wixom, and David Tegarden Chapter 8: Behavioral Modeling.
© 2007 John Wiley & Sons Chapter 15 - Organizational Issues PPT 15-1 Organizational Issues Chapter Fifteen Copyright © 2007 John Wiley & Sons, Inc. All.
Reid & Sanders, Operations Management © Wiley 2002 Facility Layout 10 C H A P T E R.
Slide 1 Systems Analysis and Design with UML Version 2.0, Second Edition Alan Dennis, Barbara Wixom, and David Tegarden Chapter 9: Moving on to Design.
What are they? How can I do them too? Construction + Materials IV: Construction Documents.
Introduction to Drafting and Design
Copyright © 2000 John Wiley & Sons, Inc. All rights reserved. Reproduction or translation of this work beyond that permitted in Section 117 of the 1976.
Slide 8-1 Chapter 8 Terms Programming Languages Introduction to Information Systems Judith C. Simon.
Reid & Sanders, Operations Management © Wiley 2002 Operations Strategy & Competitiveness 2 C H A P T E R.
Chapter 171 Information Technology For Management 6 th Edition Turban, Leidner, McLean, Wetherbe Lecture Slides by L. Beaubien, Providence College John.
DT 1320 BIM UNIT 1 INTRO TO ARCHITECTURAL DESIGN AND BIM.
A- 1. A- 2 Appendix B Standards of Ethical Conduct for Management Accountants The Institute of Management Accountants has published and promoted the following.
K-1. K-2 Appendix K Standards of Ethical Conduct for Management Accountants The Institute of Management Accountants has published and promoted the following.
Slide 10-1 Chapter 10 Systems Development Procedures Introduction to Information Systems Judith C. Simon.
PowerPoint Presentation for Dennis & Haley Wixom, Systems Analysis and Design Copyright 2000 © John Wiley & Sons, Inc. All rights reserved. Slide 1 Systems.
Information Technology Project Management – Fourth Edition By Jack T. Marchewka Northern Illinois University Power Point Slides by Gerald DeHondt Grand.
I-1. I-2 I ACCOUNTING FOR SOLE PROPRIETORSHIPS Accounting, Fifth Edition.
Chapter Chapter 10-2 Chapter 10 Plant Assets, Natural Resources, and Intangible Assets Accounting Principles, Ninth Edition.
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
Construction Documents Drawings Specifications Bid documents Construction Sketches and other data.
Core Concepts of ACCOUNTING INFORMATION SYSTEMS Moscove, Simkin & Bagranoff John Wiley & Sons, Inc. Developed by: S. Bhattacharya, Ph.D. Florida Atlantic.
Reid & Sanders, Operations Management © Wiley 2002 Material Requirements Planning 15 C H A P T E R.
Prepared by Debby Bloom-Hill CMA, CFM
Prepared by Debby Bloom-Hill CMA, CFM
Core Concepts of Management Schermerhorn
Evaluating and Terminating the Project
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
The Quality System Chapter 13
Roberta Roth, Alan Dennis, and Barbara Haley Wixom
Systems Analysis and Design 5th Edition Chapter 8. Architecture Design
ACCOUNTING INFORMATION SYSTEMS
Information Technology Project Management
Presentation transcript:

Design & Layout of Foodservice Facilities Chapter 2

Chapter 2 Overview Introduces the roles and responsibilities of each member of the foodservice design project team Describes the sequence of steps involved in the design of a foodservice facility Introduces the work typically performed by a foodservice consultant in the design process Discusses how the costs of a new or renovated foodservice facility are estimated

The Project Team The Owner’s Representative The Architect The Engineers The Foodservice Facilities Design Consultant The Interior Designer The General Contractor The Foodservice Equipment Contractor

The Owner’s Representative – Typical Roles and Responsibilities Selecting team members (architect, foodservice consultant, etc.) Determining operational goals for the project Setting the budget and obtaining funds for the project Evaluating the design for the project Accepting or rejecting recommendations of equipment, furniture, etc.

The Architect: Typical Project Roles and Responsibilities Coordinating the work of the design team (engineers, consultants, interior designer) Preparing and submitting design drawings and specifications for the project Managing the bidding and contract negotiation process Coordinates and inspects the construction process

Potential Architectural Team Members Principal in Charge: markets the firm and negotiates the contract with the Owner; the individual ultimately in charge Project Manager: responsible for the design process on a day-to-day basis; coordinates the work of the other team members Design Architect: works closely in the planning and schematic design phases to set the overall direction of the design Site Architect: has a temporary office at the job site and coordinates and supervises the construction progress

Criteria for Selecting an Architect Successful experience with similar projects, including foodservice facilities Relevant experience of the proposed team (engineers, consultants, etc.) “Chemistry” – the expectation of a positive and productive working relationship Ask for references, and contact them!

The Engineers: Roles and Responsibilities Electrical engineers design the systems that supply electricity as needed in the facility Mechanical engineers design the plumbing, heating, ventilation, and air-conditioning systems within the facility Structural engineers design systems to support the structure of the building and to protect its integrity Civil engineers design site improvements necessary for a facility

The Foodservice Consultant: Typical Roles and Responsibilities Assists the Owner in identifying operational goals and objectives Works closely with the Architect to determine space requirements Designs the foodservice areas and lays out equipment within them Recommends equipment to the Owner Prepares drawings and specifications for the foodservice-related parts of the project Coordinates construction of the foodservice areas, including an inspection of the completed facility

Common Foodservice Consulting Services Market and Financial Feasibility Studies as described in Chapter 1 Master Planning and Programming to determine what approaches, systems, and design concepts will best meet the Owner’s objectives Facility Evaluation to pinpoint strengths and weaknesses of existing foodservices and recommend improvements Foodservice Facilities Design (as described in the previous slide) Operations Analysis to identify inefficiencies and recommend improvements

The Interior Designer: Typical Roles and Responsibilities Gives the foodservice operation its distinctive visual character and theme through the design of interior spaces, the selection of colors, and the specification of furniture and finishes. Focuses on the public or customer parts of the facility, rather than on the kitchen or storage areas

The General Contractor: Typical Roles and Responsibilities Overall responsibility for the construction of the facility in accordance with the plans and specifications prepared by the design team Selects sub-contractors to perform specific parts of the construction work, coordinates their progress, and monitors their performance Works with the Architect and Owner to resolve problems encountered in the construction process

Alternatives to a General Contractor Construction Manager (a firm) is involved as part of the design team, advising on construction costs of design alternatives; also coordinates the actual construction. Design-Build is a construction firm that employs its own architects, engineers, and consultants, and so handles all aspects of the project from inception through design to opening day

The Foodservice Equipment Contractor A dealer who markets foodservice equipment May be a sub-contractor hired by the General Contractor or may be a ‘prime’ contractor hired by the Owner Furnishes and installs the equipment as designed and specified by the Foodservice Design Consultant

The Design Sequence

Programming Space analysis, to determine the amount of area required for each of the functional areas of the foodservice operation Determination of adjacency – what functional areas need to be located next to each other? Preparation of a “Foodservice Program Statement,” a narrative description of the requirement of each functional area, used by the design team

Adjacency Matrix (Portion) D.S. R.S. P.P. Receiving   Dry Storage 1 Refrigerated Storage 1  Pre-preparation 2  3 Final Preparation 2 The larger the number, the more important it is for the two functional areas to be located adjacent to each other

Example of a Bubble Diagram Solid arrows are flow of food, dashed arrows are flow of waste

Foodservice Program Statement Elements – Partial Example Room/Area # 103 Room/Area Name Dishroom Relationship to other Areas Near dining room and kitchen … Description of Use To wash all utensils, serving pans, china, glassware … Square Footage 420 (39 square meters) Finishes Walls … Floors … Ceilings … Lighting…

Schematic Design (Phase I) Shows the shape of the building, the entrances and flow patterns, and the location of the dining rooms, kitchen, and other major components of the foodservice facility Typically prepared, presented to the Owner, and revised several times A preliminary estimate of the cost of construction is typically prepared near the end of the schematic design phase

Schematic Design Example

Design Development (Phase II) The team ‘fleshes out’ the design of the project through increasingly detailed drawings Alternative systems are evaluated through value engineering Foodservice equipment selections are made in consultation with the Owner Detailed floor plans, utility drawings, elevations and sections are prepared Preliminary specifications are prepared Cost estimates for the project are revised and refined

Example of a Design Development Floor Plan (Partial)

Example of a Utility Spot Drawing (Electrical - Partial)

Example of a Utility Spot Drawing (Mechanical - Partial)

Example of an Elevation Drawing (Pot Sink with Collector)

Construction Documents (Phase III) Drawings showing construction of the new or renovated facility, including all site work, structural systems, rooms and other spaces, utility systems, equipment, finishes, and details Specifications describing the materials and products, the standards of workmanship, the methods of fabrication and construction, the applicable code requirements, and the methods of installation, cleaning, and testing General conditions of the contract defining terms, assigning responsibility, establishing payment schedules, describing how changes are to be handled, and listing the specific project conditions

Types of Specifications Descriptive specifications identify all the important characteristics of the material or product Proprietary specifications identify the product by reference to a manufacturer and model number, and require the contractor to provide that item and no other Performance specifications. Establish performance criteria that are relatively independent of the specific description of the item

Bidding & Contract Negotiation (Phase IV) Putting the project “on the street” Interested contractors prepare proposals following the requirements of the documents Questions regarding the requirements are addressed by the design team Bids are due by a deadline (4-8 weeks for foodservice equipment) Bids are evaluated for conformance to the contract requirements The successful bidder (often the lowest qualified price) is identified and a contract is negotiated

Bidding & Contract Negotiation (Phase IV) Foodservice equipment contractors often propose substitutions and alternates to what was specified in the bid documents Substitutions are proposals to provide materials, products, equipment, or systems from a manufacturer other than the one named in the specifications Alternates are proposals to provide materials, products, equipment, or systems different from what was described in the specifications, generally at a significantly lower price Substitutions and Alternates are evaluated by the Foodservice Design Consultant, who makes a recommendation to the Owner regarding their acceptance

Construction Coordination (Phase V) Review of the “shop drawings” and equipment submittals prepared by the Foodservice Equipment Contractor Coordination with the Architect and contractors where questions arise in the construction process about the foodservice installation, often through job site meetings Review of proposed changes to the work Examination of the construction progress and installation of the foodservice equipment Preparation of a “punch list” identifying where the work fails to meet the requirements of the contract documents

Implementation & Training Benefit employees by: Explaining the intent of the design Learning the most efficient and effective ways of using the new facility Demonstrating the proper use and maintenance of new equipment

Copyright © 2003 John Wiley & Sons, Inc. All rights reserved Copyright © 2003 John Wiley & Sons, Inc. All rights reserved. Reproduction or translation of this work beyond that named in Section 117 of the 1976 United States Copyright Act without the express written consent of the copyright owner is unlawful. Request for further information should be addressed to the Permissions Department, John Wiley & Sons, Inc. The purchaser may make back-up copies for his/her own use only and not for distribution or resale. The Publisher assumes no responsibility for errors, omissions, or damages, caused by the use of these programs or from the use of the information contained herein.