NuMI Magnets or What to look for in a gift magnet’s mouth David Harding 3 November 2008.

Slides:



Advertisements
Similar presentations
LCW Upgrades - Final Booster RF Cavity LCW Isolation Valve Replacement. – 8 valves and unions previously replaced – An additional 10 valves and unions.
Advertisements

Neutrinos from Stored Muons STORM Target Station Conceptual Design 15-April-2013 Kris Anderson Fermilab/Accelerator Division/Mechanical Support Department.
Interim Design Amy Eckerle Andrew Whittington Philip Witherspoon Team 16.
11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
Proton Source Workshop Booster Downtime Wednesday, December 8, 2010 T. Sullivan.
G2P Target installation and Beyond. Schedule Pivot before.
February 17-18, 2010 R&D ERL Ady Hershcovitch R&D ERL Beam Dump Ady Hershcovitch February 17-18, 2010 Beam Dump.
RADIATOR PURPOSE Transfers heat from engine coolant to the air passing through as the vehicle is in motion. Transfers heat from engine coolant to the.
Special Report NuMI Target Updates Special Report NuMI Target Updates Ongoing Work - Four Parallel Activities I.Target Hall We expect to move NT-05 to.
MICO 8 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - Problems and Issues.
1 Hall A Update Thia Keppel APEX Collaboration Meeting April 2015.
1December 14, 2006Identifying Preferred Suppliers A Training Tool on Supplier Selection By Kira Connell Bus M 361.
Magnets for Mu2e Resonant Extraction: Design and Scope Changes V.Nagaslaev 05/09/2013.
Main Water Leak Detection Panel (SY3618) Features: 1.Operates on 230 V A.C. 2. Provides supervision of Interface modules. 3. LCD display to indicate Module.
7/11/01Steven Hays E/E Support Page 1 NuMI Beam line Power Supplies  The supplies in the line is detailed  Main Ring Style…………………..…1  PEI/Transrex.
INTRODUCTION to the DESIGN and FABRICATION of IRON- DOMINATED ACCELERATOR MAGNETS Cherrill Spencer, Magnet Engineer HOMEWORK PROBLEM for Lecture # 2 of.
Thermal Systems Design
Robin Wines. Verbal agreement with BNL to acquire 48D48 magnet Contact at BNL indicates 4 of these magnets in storage BNL agrees to disassemble magnet.
NuMI NBI2006 September 9, 2006 NuMI Repairs for Hot Components Jim Hylen / FNAL Page 1 NuMI Repairs for Hot Components (1 sievert = 100 rem) Problem On.
’ tall Empty space below this metal sheet 66’ 14’ 4’ 10’ Ceiling tiles = 24 Concrete blocks 14’ long There are two “styles” of Ceiling tile,
Proton Source Water Systems Proton Source Workshop December 8, 2010 Maurice Ball.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
ATF2 quads status 22Nov05- Cherrill Spencer 1 Status Report on the Design and Fabrication of 29 quads for ATF2 By Cherrill Spencer, SLAC, for ILC-BDS weekly.
Electric Circuits. What is Electric Current? Current in a river –The movement of water molecules Higher current = more water passing a given point each.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
The Heavy Ion Fusion Virtual National Laboratory Pulsed Normal Quadrupoles for a Heavy Ion Fusion Driver Final Focus Section D. Shuman, S. S. Yu, LBNL.
Accelerator and NuMI Upgrades Shutdown Update Cons Gattuso July 02, 2012 July 2, 2012 Cons Gattuso1.
SC Project Review of NCSX, April 8-10, 2008 NCSX Coil Services P.L. Goranson Work Package 161.
ATF2 Magnets ATF2 Magnets 22 May 2007Cherrill Spencer, SLAC. Progress on New ATF2 Magnets 1 Progress Report on ATF2 New Magnets 22 nd May 2007 Cherrill.
General Considerations for the Upgrade of the LHC Insertion Magnets
Magnet Design & Construction for EMMA
MBA Magnets MultiBend Achromat Magnets 9/27/2013 Review By Mark Jaski.
Large Diagnostic Neutral Beam Injectors of Budker Institute of Nuclear Physics Budker Institute of Nuclear Physics, , Novosibirsk, Russia V.Davydenko.
F NuMI Beamline Accelerator Advisory Committee Presentation May 10, 2006 Mike Martens Fermilab Beams Division.
Utility Engineers, PC.  Generation  Transmission  Distribution.
INTO A LEarNeR© 7 KIT TO BE USED FOR THE PURPOSE OF LEARNING LENR AND RESULTING IN A USEFUL WATER HEATER POWERED BY A BATTERY 5/7/2012Copyright by Dale.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Proposed Conventional Sextupole for Installation at A0 Introduction (Dean Still) Reasons for installation- Reduce I in S6 feeddown sextupole circuit at.
Some Value Engineering Proposals For LBNE Beamline.
XFEL X-Ray Free-Electron Laser Bernward Krause MEA WP-12: Warm Magnets WPL: B. Krause.
5.5 A VOCABULARY. MATTER  Anything that has mass and takes up space  3 states of matter: solid, liquid, gas.
Hall A Installation Review John J. LeRose 2/25/2009.
Electricity Current and charge. Electricity The flow of an electrical current Electrons flowing from a negatively charged area to a positively charged.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
All Experimenters’ Meeting September 23, Accelerator Operation Summary Calendar Week # 38 NuMI Weekly Integrated Intensity 4.57 E18 protons BNB.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
PAC Meeting, December 12, Prebys 1 The Problem.
All Experimenters’ Meeting November 25, 2013 Photo by Martin Murphy.
Assembly 12/14/06 #1 Assembly and Commissioning Paul Huffman.
All Experimenters’ Meeting November 4, Accelerator Operation Summary Calendar Week # 44 NuMI Weekly Integrated Intensity 5.97 E18 protons BNB.
Physical Network Topology. When working with a network What is Physical Topology????? The physical topology of a network refers to the configuration of.
ESS DTL: Prototyping M.Comunian - F. Grespan – P. Mereu Lund– 10/04/2013F.Grespan.
DDBA magnets Chris Bailey Low emittance rings Sept Frascati.
Chapter 10 Maintenance and Energy Conservation. I. Your Maintenance Program MAINTENANCE is the upkeep of property. It involves cleaning, repairing and.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
P1, P2 and AP-1 Aperture Improvements February 5, 2015 J. Morgan 1.
Mike Andrews January 31, Weeks Activities Target Pile Fan Upgrades Install piping for new cooling coil units Install controls for new coil.
Proton PMG May 7 th 2015 Cons Gattuso AD Shutdown Manager.
Lesson 3: Conductors and Insulators
HMS Status Steven Lassiter Jan 20, 2017.
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
Thunderbird Water Pump Upgrade
Status of ATF2 FD Magnets and Info on their FFTB supports & mover
CHEN, Fusan KANG, Wen November 5, 2017
A. Freyberg Aug 2016 ECT’16 =>
CEPC Collider Magnets CHEN, Fusan November 13, 2018.
Polarized He3 Target Upgrade (Stage I) for A1n/d2n
Presentation transcript:

NuMI Magnets or What to look for in a gift magnet’s mouth David Harding 3 November 2008

3 Nov 2008David Harding DUSEL Beamline Working Group2 Re-using Magnets Pros & Cons Cheaper, defined Quicker Focuses beam design Minimizes rad waste Known properties No surprises But not free But not instantaneous Limits beam design Rad exposure False assumptions Surprises

3 Nov 2008David Harding DUSEL Beamline Working Group3 Metal prices have been volatile

3 Nov 2008David Harding DUSEL Beamline Working Group Dipoles Not used in final beamline design, but several rehabbed for early design and BNB Venerable magnets had been sitting in decommissioned beamlines

3 Nov 2008David Harding DUSEL Beamline Working Group Surprises Poor coil-to-ground insulation Much work –Extra time –Extra cost

3 Nov 2008David Harding DUSEL Beamline Working Group6 Inside an old dipole

3 Nov 2008David Harding DUSEL Beamline Working Group7 An old

3 Nov 2008David Harding DUSEL Beamline Working Group8 B2 Dipoles Specs changed, clarified in process –Tolerances on beam tube length and flange position Worked out fine in the end –Could have been substantial cost increase

3 Nov 2008David Harding DUSEL Beamline Working Group9 EPB Dipoles Extensively used in NuMI and SY120 Venerable magnets had been sitting in decommissioned beamlines

3 Nov 2008David Harding DUSEL Beamline Working Group10 EPB Dipole comments As with B2 dipoles, beam tube length, flange position, squareness issues Multiple bus, manifold possibilities Magnetic shielding effort successful Notoriously fragile insulators –Have been problematic –Upgrade designed, tested, to be installed

3 Nov 2008David Harding DUSEL Beamline Working Group11 EPB Dipole photos

3 Nov 2008David Harding DUSEL Beamline Working Group12 3Q120 Quadrupoles Extensively used in NuMI and BNB Venerable magnets had been sitting in decommissioned beamlines

3 Nov 2008David Harding DUSEL Beamline Working Group13 3Q120 Surprises Many variants Many ground faults and water leaks Mostly not repairable Water needs Power supply needs

3 Nov 2008David Harding DUSEL Beamline Working Group14 3Q120 photos

3 Nov 2008David Harding DUSEL Beamline Working Group15 3Q120 Variants Two core sizes –Better high field performance? No! Solid conductor or hollow  –118 turns/pole or 28 turns/pole Cooling fins (solid conductor) –8 fins or 12 fins (and variants on manifolding) –Copper or aluminum Cooling paths (hollow conductor) –8 paths or 16 paths Beam tube –Round or star

3 Nov 2008David Harding DUSEL Beamline Working Group16 3Q120 Failures Some magnets rejected before attempting rework –Ground faults About ¼ of magnets selected for rework failed –Mostly water leaks Generally not repairable Competing with other projects for good ones

3 Nov 2008David Harding DUSEL Beamline Working Group17 3Q120 Cooling Confusion regarding –Current needs for working gradients –Power for DC operation –Water needs for adequate cooling –Actual water flow Ramp the magnets or add cooling? –Added external cooling jackets for hottest magnets –Will eventually replace with hollow conductor All worked out in the end with some anquish

3 Nov 2008David Harding DUSEL Beamline Working Group18 Trim Dipoles Commitment to MI style trims Requirements changed with beam design Had to add external cooling

3 Nov 2008David Harding DUSEL Beamline Working Group19 Magnet with spacers, coolers

3 Nov 2008David Harding DUSEL Beamline Working Group20 Closeout magnet reports

3 Nov 2008David Harding DUSEL Beamline Working Group21 Lessons Learned Re-used magnets can be good Look that gift horse in the mouth Ask the experts rather than relying on 20+ year old notes System integration is critical –Optics, magnets, power, water, operations Changing course in mid-stream adds cost Close communication is essential