Energy Saving Jean-Paul Burnet & Konstantinos Papastergiou CERN Technology Department | Electrical Power Converters.

Slides:



Advertisements
Similar presentations
Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
Advertisements

Multi-Turn Extraction / L.Ducimetière / Kicker options for MTE Prepared by L.Ducimetière, L.Sermeus Outline: Reminder : Present MTE dedicated.
ENERGY EFFICIENT DATA CENTRES – AN OVERVIEW Professor Peter James.
Energy Saving Opportunities for Transformers Hans De Keulenaer Outokumpu Tara Mines Energy Efficient Motors & Transformers Workshop May 7, 2002.
Energy use in buildings Dr. Atila Novoselac Associate Professor Department of Civil, Architectural and Environmental Engineering, ECJ
CHANGES IN THERMAL ENERGY CONSUMPTION IN APARTMENT BUILDINGS OF ESTONIA Teet-Andrus Kõiv,
Andreas Oberhofer Research Associate, Global Energy Network Institute (GENI) Energy Storage Technologies & Their Role in Renewable.
Magnet Energy Recovery Konstantinos Papastergiou CERN Technology Department | Electrical Power Converters Workshop on Special Compact and Low Consumption.
Main article: Leakage inductance
Technical Presentation on the new Power Saving Unit (PSU) Introduced By View Power.
Chilled water Meyrin consolidation Study 1 st Part Many thanks for their contribution to: Pasquale Alemanno, Fortunato Candito, Alexander Putzu.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
BENEFITTING FROM GREEN IT – FINDINGS FROM THE SUSTEIT PROJECT Professor Peter James
17.March Connection to the CERN Power System of the TT2 mercury target project by Karsten KAHLE (TS-EL)
Power converters implications for Booster Energy Upgrade Jean-Paul Burnet, Serge Pittet LIU day, TEEPC.
TS/CV/DC CFD Team Computational Fluid Dynamics at CERN Michele Battistin CERN, Geneva - Switzerland.
East Area Secondary Beam Control User Guide Revised version after LS1 L.Gatignon / EN-MEF 5 January 2015.
Erica Lindström Report on Sessions B1 and B2. Boosting accelerator electrical efficiency at the ESFR Presented by Mr. Jean François Bouteille The new.
Re-Commissioning of the Water Cooling System at Université de Sherbrooke Department of Buildings June 2008.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
Status and possibilities for the irradiation facility in the PS East Hall Michael Moll, Maurice Glaser 10 March 2010 – IRRAD Working Group - some notes.
Compact & Low Consumption Magnet Design Workshop for Future Linear and Circular Colliders Geneva, November 26-28, 2014 Saving opportunities in accelerator.
Management and Organisation of Electricity Use Electrical System Optimisation Belgrade November 2003.
IMPROVING COOLING SYSTEM EFFICIENCY WITH PRE-COOLING AJ Schutte 15 August 2012.
INTRODUCTION. Function of Chillers Remove Cool Control Support.
East Area Day, 1 February 2012 Lau Gatignon / EN-MEF.
CERN plans towards energy efficiency Serge CLAUDET Nov 2014.
The East Area Rende Steerenberg, ps/op PS-Days 2001 Evian.
Reorganization of East Area Beam Lines 2 nd Status Report at IEFC Workshop L.Gatignon, 11/02/2010 EN.
Utility Engineers, PC.  Generation  Transmission  Distribution.
10.March.2004, phone A.Fabich 1 Technical drawings of TT2A and adjacent galleries Detail – CDD number Overview surface, ----PDP Overview TT2/TT2A/ISR,
Beam line Experiment area SC magnet Pion production target
NA61 11 October 2010Light Ion for NA61/ S. Maury1 Light Ion in SPS Foreseen to have primary Ar beam physics in 2012 Nothing runs in 2012 NA61 duty cycle.
East Area Consolidation Konstantinos Papastergiou CERN Technology Department | Electrical Power Converters 04 June 2015.
An introduction to Energy aspects at CERN June 2014.
Book Reference : Pages To understand that transformers are all around us in everyday life 2.To understand the significance of A.C. 3.To be able.
CERN Test Beam Update and Schedule
Dec7,2007 ie-FP7 Test Beams for detector R&D at CERN The PS East Area The SPS North Area Irradiation facilities.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
M.Moll, M.Silari, H.Vincke – 3.April Mixed field irradiation -- Who answered ?  In total 36 forms filled / 34 persons answered: 38% 62% CERN:
ATC-ABOPC Days 2008: Session 1 Summary ATC-ABOC days Summary Session; February Session coordinated by B. Mikulec AB-OP and O. Br ü ning AB-ABP Operation.
Transformer The working principle of a transformer
MERIT review, Dec. 2005CERN AB-ATB1 CERN installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
Magnets Attilio Milanese Doing Business with CERN
18, 19, 20 February 2002 Power Converters for magnets (PBS 1.2.3) R. GENAND SL/PO 1 Power Converters for Magnets –Introduction –Specification Magnet characteristics.
Breuker Feb Overview of future East Area Programme T8 : 24 GeV/c (primary protons) 2-3 x 10**11 per PS cycle; T9 (new) : 15 GeV/c 10**6 per spill;
J. G. Weisend II for the ESS Team Energy Efficiency & Recovery at ESS.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
PRESENT AND FUTURE TEST FACILITIES FOR HIGH- INTENSITY TARGETRY CERN I.Efthymiopoulos, CERN with input from Jacques Lettry & Rende Steerenberg.
ENERGY CONSERVATION IN MOTOR SYSTEMS. Introduction 2.
CERN accelerator chain (operating and approved projects)
Proton and neutron irradiation facilities in the CERN-PS East Hall Maurice Glaser and Michael Moll CERN- PH-DT2 - Geneva - Switzerland 6 th LHC Radiation.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
EXPERIMENTAL AREAS CONSOLIDATION EACONS part – early draft from comments.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
Overview on CERN Test Beam Facilities On behalf of the CERN SPS/PS test beam coordinator: Horst Breuker, CERN Courtesy: Matteo Alfonsi, CERN Horst Breuker,
TRANSFORMERS  A power station produces an AC pd of ~25 kV  This AC pd is stepped up to ~132 kV so that it can transport through cables without losing.
HNC/D Engineering Science
Status of HESR 18th March Gießen Dieter Prasuhn.
Emergency dumping of proton and ion beams in SIS100 F
What are transformers and how do they work?
Target and Horn status report
East Area Consolidation
Pierre-Alexandre Thonet
COOLING & VENTILATION INFRASTRUCTURE
CERN Testbeam facilities
Electromechanical Systems
Present and Future test facilities for High-intensity Targetry CERN
How to control the local beam density
ILO Industrial Opportunities Days, 6-7 June 2019
Presentation transcript:

Energy Saving Jean-Paul Burnet & Konstantinos Papastergiou CERN Technology Department | Electrical Power Converters

Contents Special thanks to all Contributors: Jonathan COTTET (original presentation), Lau GATIGNON, Ilias EFTHYMIOPOULOS, Davide TOMMASINI, Dominique BODART, Gilles LE GODEC, Jean-Luc BLANC, Denis ARNOULT, Mauro NONIS, Serge DELEVAL, Rende STEERENBERG, Helfried BURCKHART, Bernard MULTON Introduction The East Experimental Area at CERN Energy Requirements of the East Area Consolidation of Power Electronics and Magnets Energy Saving using pulsed magnet operation Conclusions

Introduction  Electricity at CERN  Energy consumed in the year 2011: 1.2TWh  An upwards Electricity price trend is foreseen  An increase of the consumption is expected  East Experimental Area: a good candidate  Old installation - consolidation programme foreseen in 2018  Evaluation of energy balance of the PS EAST area on-going  Use it as a model for other projects! CERN Energy Coordinator: “Improve Energy Efficiency” 3

The East Experimental Area 4

 Houses five beam lines  Protons derived from the PS  Momentum 3.5 to 24GeV/c  Slow extraction Targets  Beam T7 can be operated as :  a secondary test beam (<10 GeV/c) or  as an Irradiation facility with primary proton beam  T8 is a primary proton beam for DIRAC exp. (up to p+/cycle)  T9 is secondary test beam (<15 GeV/c at 0 mrad production angle)  T10 secondary test beam (<7 GeV/c at 60mrad production angle)  T11 can be used as  test beam (<3.6 GeV/c at 210 mrad) or  as a very large spot (almost 2x2 m2) hadron beam (CLOUD experiment) 5

East Area Beam Lines Magnet current 6

ZoneTime in PS Supercycle EASTA4301 h EASTB4044 h EASTC3274 h Number of “EAST” area cycles: 7 Beam takes 400ms to 700ms to pass through the beam line Particles in East Area beam lines: 3.5s over 46.8s of the super-cycle! “duty cycle” is only 7.5 % Duty cycle of East Area installations A typical Super-cycle at CERN 46.8s (39 cycles of 1.2s) 7

East Area Energy and Water Consumption

Energy Consumption  The East Area consumes 15GWh per year after  PS (55GWh/year) and the Booster (25GWh/year) The East Area consumes energy continuously whereas it is used only during 7.5% of the PS Supercycle time  Electricity consumption appears in the form of:  Magnet thermal power losses  Water and Air Cooling pumps  But also indirect consumption of resources:  Water supply to compensate for evaporation in cooling towers  De-ionised Water and other cooling fluids 9

10 84% 12% 4% EquipmentEnergy in MWh T8 Spectrometer T7 Spectrometer NA Building SMH 57 AND 6122 Building Energy Consumption: detail 10

EAST AREA ENERGY CONSUMPTION in 2011 Energy in GWhPrice in kCHF Electrical energy Total cooling fluid 75 TOTAL energy cost 480 kCHF Key loads  Identified loads where potential savings can be gained  Calculated cost of energy loss and cost of cooling  Examine alternative, energy saving magnet operation 11

East Area Consolidation Programme

East Area Consolidation Project A consolidation programme includes:  A thorough maintenance/renovation of the infrastructure  A redesign, manufacture and installation or restoration of key equipment (magnets, power converters, power network). Facilities in East Area after the consolidation:  T8: Irradiation facilities for protons and “mixed field”  T9: Test beam facility and CLOUD experiment  T10: Test beam facility mainly for the ALICE collaboration 13

IRRAD East Area new layout 14

Future (3 beam lines)Present (5 beam lines) Energy in GWhPrice in kCHFEnergy in GWhPrice in kCHF Electrical energy Total cooling fluid TOTAL energy cost 653 kCHF 480 kCHF Future Energy Consumption  Assuming future operation in continuous mode  The total energy cost will rise by more than 25%  The cooling fluid (mainly water) costs will rise by 25%  Despite fewer users the operating cost is higher  Unless operation changes to “pulsed mode”… Pulsed operating mode: Magnet current is reduced to zero when no beam is present in its vacuum chamber (as opposed to the continuous operating mode) 15

Pulsed (or cycling) operation  Pulsed operation requires a di/dt through the magnet  23/55 magnets do not support cycling due to a solid steel yoke  Eddy currents would heat up the yoke material 16

Magnet refurbishment cost TypeEstimated Price magnet (kCHF) Number of magnetsTotal cost per family (kCHF) MDX M M Q Q Q74401 Total231.3 MCHF Solution Elaborated by the Magnet Groups at CERN  replacement all the solid steel yokes by new laminated yokes while keeping the present coils  Total magnet refurbishment cost is 1.3MCHF  Considerable cost – could it be finance by energy saving? 17

FUTURE OPERATION (HYPOTHESIS) Zonenumber of cycle per Supercycleduration in 2011 (in hr)duty cycle Total - East % EASTA243015% EASTA on T % EASTA on T % EASTB % CALCULATION RESULTS: ENERGY-WATER CONSUMPTION Pulsed ModeContinuous Mode Energy in MWhPrice in kCHFEnergy in MWhPrice in kCHF Total magnet electrical consumption Water cooling electrical consumption Air cooling electrical consumption Total electricity consumption Total cooling fluid cost TOTAL energy cost 40 kCHF 653 kCHF Pulsed Operation: consumption 18

Pulsed Operation: Impact  Pulsed operation will raise the project costs:  Magnet consolidation of solid steel yokes: 1.3MCHF  Power Converter replacement costs will increase by: 1.5MCHF  Power converter consolidation was already scheduled  Electrical distribution costs will be lower  2x2MVA transformers are sufficient to power the EAST Area (currently 8 transformers)  BUT pulsed operation will result in recurring savings:  10GWh/year  600kCHF/year  …and a much smaller carbon from the East Experimental Area AND pay back of the project costs will occur in 5 years 19

Conclusions  Energy Audits, a useful tool for identifying potential for saving  The PS East Area is a prime candidate  Continuously energised BUT used <4% of physics operations time  DC powering of magnets  unnecessary cooling requirements  Pulsing the magnets drastically reduces consumption  Energy requirement from 11GWh to 0.6GWh per year  Saving of 600kCHF per year  Great example of a self-funded project  Extra cost of approximately 3MCHF but,  Short investment depreciation time - approximately 5 years  East Area is a model for other projects (e.g. North area) 20