Team Radford Semi-Annual Community Meeting

Slides:



Advertisements
Similar presentations
Understanding SMS and Other Events June 6 th, 2012 by Sylwia LaBudde.
Advertisements

DEQ Mission By the end of the decade, Virginians will enjoy cleaner water available for all uses, improved air quality that supports communities and ecosystems,
Department of Environmental Quality Environmental Management System Overview.
Annual Inspections of First Nation Water and Wastewater Facilities Derek Hill, P.Eng., Senior Engineer Mohammed Karim, P.Eng., Senior Engineer, Water\Wastewater.
The Road To CPA Licensure Presented by: Tennessee State Board of Accountancy.
ANRC AACD Arkansas Conservation Districts Training Program Power Point 6 Appointments and Election of Directors.
The importance of a Compliance program is to ensure that our agency meets the highest possible standards for all relevant federal, state and local regulations,
Definition of Solid Waste Final Rule Public Meeting Charlotte Mooney Office of Resource Conservation and Recovery U.S. Environmental Protection Agency.
11. As part of its mission to protect human health and the environment, EPA works with various partners, including schools, to share information, resources.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
Foreign Affairs Security Training Center
UNCLASSIFIED 1 Team Radford Semi-Annual Community Meeting 8 May :00-8:00 pm NRV Business Center.
Community Meeting Team Radford 5 September AGENDA Introductions Ground Rules General Information about RFAAP Answers to questions posted in the.
Environmental Management Systems The ISO Approach Initial Environmental Review & Gap Analysis Presented by: NC Division of Pollution Prevention.
SSAI Sponsor Transition Webinar t We will start in 5 minutes. t Please dial in by following the instructions (to see those instructions again click the.
WELCOME: EPA PUBLIC MEETING
SCOPING MEETING FOR ENVIRONMENTAL IMPACT REPORT REQUIRED BY PUBLIC RESOURCES CODE SECTION 3161 (b)(3) AND (4) (SENATE BILL 4) (PAVLEY) C ALIFORNIA D EPARTMENT.
Federal Energy and Environmental Regulation Agencies and Laws
Staying on Top of Permits & Public Comments Public Comments Policy Track: Sunday, February 28, :30 pm.
Questions Resources 1 Charlie Saks Public Affairs Officer US Army Please raise your hand and.
Air Quality Beyond Ozone and PM2.5 Sheila Holman North Carolina Division of Air Quality 6 th Annual Unifour Air Quality Conference June 15, 2012.
Tribal Benefits from State Implementation Plan (SIP) Process Involvement Rosanne Sanchez New Mexico Environment Department Air Quality Bureau.
Blue Skies Delaware; Clean Air for Life Delaware’s Air Permitting Seminar 2008 Paul E. Foster, P.E. – Program Manager Delaware Department of Natural Resources.
Update on Chesapeake Bay Issues Presentation to the Chesapeake Bay and Water Resources Policy Committee July 17, 2009 Ted Graham & Steve Bieber COG Department.
ASARCO Tailings Violations Pima County Department of Environmental Quality.
Performance Reporting to the Management Review Team Department of Energy EMS Training Workshop Columbus, OH March 7-8, 2005 Daniel L. McCollum, Quality.
Where to find Information About Facilities. Overview of Title V Permits.
Hydrostatic Testing Draft General Permit Draft Permit Stakeholder Outreach Meeting April 23, 2015 Moderated by: Lillian Gonzalez, Unit Manager, Permits.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Steps in the Hazardous Waste Permit Reissuance Process December 10, 2014.
Kathy Alexander, Ph.D. Technical Specialist Water Availability Division Texas Commission on Environmental Quality.
Ron Pridgeon NC Division of Pollution Prevention & Environmental Assistance
Interim Executive Director June  Financial Management Practices Audit Results Fiscal Year Audit Results Fiscal Year Internal.
Committee on Refinery Equipment November 2010 Update to the Refining Subcommittee Michael Lubcyik, Chevron Energy & Technology Company, Chair, CRE.
Adem.alabama.gov ADEM Land Division Update Chip Crockett Chief, Industrial Hazardous Waste Branch Air & Waste Management Association Southern Section Pine.
Title V Operating Permit Program 1 Section 1: Intro to Title V Laura McKelvey U.S. EPA.
MRWS GROUND WATER RULE (GWR) PREPARED BY JOHN CAMDEN MRWS GROUND WATER TECH
EXPEDITED PERMIT PILOT PROGRAM STAKEHOLDER MEETING EXPEDITED PERMIT PILOT PROGRAM STAKEHOLDER MEETING Wednesday, September 13, 2006.
Changes at IDEM Since EQSC House Environmental Affairs Committee January 28, 2009 Thomas W. Easterly, P.E., BCEE, QEP Commissioner IN Department of Environmental.
Informational Meeting Indirect Discharge Permit October 12, 2010.
Title V Operating Permits: A Compliance and Enforcement Tool Candace Carraway US Environmental Protection Agency Office of Air Quality Planning and Standards.
Solid Waste Management Plans Update Webinar Training March 5, 2014.
FINAL CLEAN POWER PLAN Before the Virginia Energy Efficiency Council Virginia Department of Environmental Quality November 12, 2015.
November 4,  Vermont Yankee Nuclear Power Station (VYNPS) ceased power operations on December 29, 2014 after 633 days of continuous power operation.
CLEAN POWER PLAN: Opportunities for Energy Efficiency in Affordable Housing Todd Nedwick Housing and Energy Efficiency Policy Director National Housing.
ENVIRONMENTAL COMPLIANCE STRATEGIES’ ROLE AND IMPACT, ALTERNATIVES AVAILABLE TO SELF POLICE, OR MONITOR COMPLIANCE.
How Tribes Can Influence State Title V Permits Virgil Frazier Southern Ute Indian Tribe Virgil Frazier Southern Ute Indian Tribe.
Changes to Contested Case Hearing Requirements and Procedures Janis Hudson Environmental Law Division Texas Commission on Environmental Quality Advanced.
Achievements in IPPC Directive Implementation: problems and constraints Albania Ministry of Environment 3 rd BERCEN Exchange Programme for the Environmental.
Grant County Zoning Ordinance Review Public Comment Forum Todd Kays:Executive Director – 1 st District Association of Local Governments.
Plans of Correction (PoC) Donna Tiberi, RN Standards Interpretation p: e: 1.
Local Assistance Section GUIDANCE FOR PREPARING THE AREA SOLID WASTE MANAGEMENT PLAN 5-Year Update Solid Waste Coordinator Training FEBRUARY.
Water Quality/Stormwater Seminar September House Bill 2031 Requires TCEQ to adopt an expedited permitting process for discharge permits for treated.
 Final Plan published on October 23, 2015  Employs different method to develop state targets  Uses the proposal’s first three building blocks ◦ BB1.
Radford Army Ammunition Plant
Julie Woosley, Division of Waste Management
Title I Program Monitoring: Common Findings from FY18
Parent and Family Engagement Policy
Enforcing the NAAQS Case Study Sean Taylor
Coordinate Operations Standard
Executive Order No. 23 Update Air & Waste Management Association Conference November 16, 2018 Presentation will focus on the latest policy development.
Radford Army Ammunition Plant
Radford Army Ammunition Plant
Hands-On: FSA Assessments For Foreign Schools
Julie Woosley, Division of Waste Management
TEXAS DSHS HIV Care services group
Time & Effort Reporting FY12 Time & Effort Reporting
Indiana Department of Environmental Management Office of Water Quality
LAUSD INJURY AND ILLNESS PREVENTION PROGRAM FOR SUPERVISORS AND EMPLOYEES As required by California Code of Regulations, Title 8, Section 3203.
REPUBLIC OF CROATIA MINISTRY OF ENVIRONMANTAL AND NATURE PROTECTION
Presentation transcript:

Team Radford Semi-Annual Community Meeting 10 December 2014 7:00-8:00 pm New River Valley Business Center

AGENDA Introductions Purpose of Meeting What Environmental Stewardship Means to Us Transparency Permit Applications Your Questions

INTRODUCTIONS US Army (USA) LTC Luis A. Ortiz Rob Davie Charlie Saks Commander, USA Radford Army Ammunition Plant (RFAAP) Rob Davie Charlie Saks BAE Systems Jay Stewart Alicia Gray

PURPOSE OF MEETING Community Engagement Transparency Your Voice This forum was requested by you Held twice yearly above and beyond any forums required by regulation or permit process Continue to improve based on your feedback Transparency Our information is public We want to have a two-way dialog with our community Your Voice This gives us the opportunity to hear what is important to you We want to share what, why and how we execute our mission of environmental stewardship beyond regulatory reports

Environmental Stewardship Built in 1941 to protect our nation, still proudly providing energetic material today Key to success: training and ownership We are committed to continuous improvement Protect this capability for our future troops and allies Protect this resource for our children Community engagement and transparency

Transparency We Perform Extensive Environmental Testing We use sophisticated monitoring equipment that continuously monitors our water and air discharges We perform annual soil sampling and quarterly groundwater sampling. We sample beyond our permit requirements and report those results Our Information Is Public Regulated and inspected by Virginia Department of Environmental Quality (VA DEQ) and (Environmental Protection Agency) EPA Air Quality Section of VADEQ inspected 4 times Solid Waste Section of VADEQ inspected 2 times Solid Waste Permit (SWP) 433 and 353 Virginia Department of Health inspected water filtration facilities 2 times EPA inspection in FEB 14 for 8 full days Our monitoring data is reported to VADEQ and is publicly available We self report upset conditions to both VADEQ and EPA

Transparency We go beyond our legal requirements International Standards Organization14001:2004 certified Internationally recognized standard of exemplary environmental management Surveillance Audit conducted in August 2014 Recertification Audit scheduled for February 2015 Conducted 13 Internal Audits We execute Daily Inspections for Storm Water, Wastewater, and Hazardous Waste Storage Areas We shut down processes based on environmental factors. We do this based on our monitoring and training to prevent problems before they occur.

NOV Notice of Violation (NOV): Opacity from Powerhouse During the period from 1 January 2014 to 31 March 2014, continuous emission monitors at the Powerhouse recorded emissions greater than 20% opacity for more than one six minute period in an hour including opacity greater than 60% during multiple six minute periods. On 6 February 2014 the opacity monitor recorded a maximum six minute period opacity of 88.8%. The exceedance was caused by a high steam demand in response to the record cold weather in February 2014. NOV AWCRO#8959 was issued by the DEQ on 6 June 2014. Shutting down production did not alleviate the stress on the power plant. The DEQ fined BAE Systems $37,925 for the permit exceedances.

Solution to NOV Construct a New Natural Gas Energy Center We expended over $40M on improvements to the existing powerhouse. Those improvements have yielded excellent results and better monitoring. Despite the improvements, our existing power house must be replaced to provide reliable energy and reduce emissions for the long term. Over $100M is committed to this project VADEQ has issued the required air permit and we have completed the public National Environmental Policy Act process. We are finalizing the design and expect to award a construction contract in 2015. In the interim period before the new energy center is constructed, we have committed additional funds and effort toward implementing additional measures to improve the existing coal plant.

NOV Notice of Violation: Biological Oxygen Demand (BOD) / Chemical Oxygen Demand (COD)and Failed Toxicity Test in our wastewater system. Occurred in February 2014 due to high water flow caused by freeze protection water combined with very low temperatures in the treatment basins. Wastewater tests indicated an exceedance of BOD and COD from Outfall 029 into the New River. This means that our treatment plant was not operating at optimal efficiency in the cold weather. A subsequent toxicity test conducted in April 2014 failed toxicity testing requirements. The toxicity test is a very sensitive biologically based lab test designed to detect a change in conditions within the flow. Our voluntary internal testing as well as additional testing discussed with DEQ did not reveal of a root cause for the failed test. We met with the DEQ in August 2014 and shared the following slide. Since the failed test in April 2014, two toxicity tests have been conducted and the wastewater discharge passed both tests.

NOV

Warning Letters Warning Letter: 16 June 2014 – Warning letter for self reported event. Flash suppressant from tenant was burned as a Group 15 Waste at the Explosive Waste Incinerator under operator assumption that it was a mixture of gunpowder and flash suppressant as normal. The container was pure flash suppressant and generated a high ash content. Resolution: Retrained area personnel, tenant personnel, and operators regarding waste characterization procedures Warning Letter: 14 October 2014 – Warning letter for self reported first half of 2014 Semi Annual Monitoring Report Deviations at the Explosive Waste Incinerator. We learned during an extreme cold spell that at 5 below zero our bag house sensors begin to alarm. We did not have a procedure to address this type of alarm. Resolution: We have developed a procedure for extreme low temperature alarm conditions.

PERMIT APPLICATIONS Explosive Waste Incinerator – Permit application submitted in April 2012. Resolve Notice of Deficiency (NOD) with DEQ by the end of 2015. Open Burning Grounds – Permit application to be submitted by 31 March 2015. VAPDES Wastewater Discharge Permit – Application submitted to the DEQ 19 November 2014. Permit expiration date is 9 June 2015.

NOD Notice of Deficiency: Notice of Deficiency (NOD), Hazardous Waste Permit. The Part B permit application for the renewal of Hazardous Waste Subpart O Explosive Waste Incinerator at Radford was submitted to the DEQ on 16 April 2012. On 7 October 2014 BAE Systems received a letter indicating that additional information is needed for VADEQ to process the permit. Meetings will continue with the VADEQ to discuss the NOD, to resolve outstanding issues, and to provide additional information. Additional NODs may be issued throughout the discussion process. These exchanges are public and available on the VADEQ website, Radford AAP section.

Steps in the Hazardous Waste Permit Reissuance Process December 10, 2014

DEQ Team Justin Williams, Director, Office of Waste Permitting & Compliance Leslie Romanchik, Hazardous Waste Program Manager Ashby Scott, Title V Coordinator  Russ McAvoy, Environmental Engineer Ann Regn, Public Information Manager www.deq.virginia.gov

Hazardous Waste Management Permit Helps ensure the safe treatment, storage & disposal of hazardous waste Based on applicable regulatory requirements developed by EPA to protect people & the environment Establishes specific requirements that must be followed Outlines facility design and operation; includes emergency plans, employee training requirements as well as monitoring and reporting requirements. Also includes unit specific requirements (e.g., requirements for incinerators)

Step 1: Starting the Renewal Process DEQ sends “call-in” letter 12 months before permit expiration. Facility submits application and fee. If timely, current permit conditions remain in effect.

Step 2: Receipt and Review of the Application Review for completeness within 30 days of receipt of the application. Technical review of the application follows. Completeness and technical reviews may be combined.

Step 3: Revisions After each review, DEQ may issue a Notice of Deficiency (NOD). NODs identify missing information. DEQ may issue several NODs until the application is complete. Reviews may take one to two years or more.

Step 4: Drafting the Permit for Public Review After reviews, draft permit is prepared. Public notified by mailing, notice in local paper and on radio. Public has 45 days to comment on proposed permit. Citizens may request public hearing by contacting DEQ.

Step 5: Final Permit Decision All public comments are considered, and DEQ must issue a "response to public comments.” Changes to the draft permit may be warranted before the final permit is issued.

How Can the Public Participate? Citizens can engage applicants and regulators in a dialogue. Applicant may also create informal opportunities for public input. Permitting process gives citizens several opportunities to express ideas and concerns.

How Can the Public Participate? For the Radford Army Ammunition Plant, here are several steps you can take to ensure that your voice is heard: Bookmark the Radford Army Ammunition Plant page on the DEQ website. www.deq.virginia.gov Know whom to call at DEQ.

How Can the Public Participate? Ask to be put on the facility mailing list for notices, fact sheets and other documents. Sign up for DEQ’s RSS news feed, and receive updates on permit renewal application status and progress. Review permit materials as they become available on the RAAP web page.

How Can the Public Participate? Submit written comments that are clear and well -documented. To ensure the effectiveness of comments, relate them to specific information in the proposed permit. Participate in public hearings and other meetings. If you need to clear up some details about the facility or the permitting process, email DEQ or BAE Systems.

If deemed technically complete, draft permit and fact sheet prepared Schedule of Actions Date Completed Application for HWI submitted April 16, 2012 DEQ Initial Completeness Review (1st CR) sent to BAE October 7, 2014 BAE request for 90 day extension for 1st CR response October 2014 Completeness Reviews TBD Technical Reviews If deemed technically complete, draft permit and fact sheet prepared Public notice published in newspaper Public comment period Public hearing Final permit determination, response to comments sent

Contact Information Email: Justin.Williams@deq.virginia.gov Leslie.Romanchik@deq.virginia.gov Ashby.Scott@deq.virginia.gov Russ McAvoy@deq.virginia.gov Ann.Regn@deq.virginia.gov Phone: 804-698-4000 Web: www.deq.virginia.gov

QUESTIONS Thank you! Our commitment to taking your questions doesn’t end tonight. Let us know what you think: Resources RadfordInfo@baesystems.com Public Affairs Officer US Army 540.731.5785 www.rfaap.army.mil Alicia Gray Community Relations BAE Systems 540.639.7709 alicia.gray@baesystems.com www.baesystems.com