Data Exchange Standards for the interaction with the ITL 08 November 2004 Bonn, Germany Peggy Quarles Perrin Quarles Associates, Inc.

Slides:



Advertisements
Similar presentations
UNFCCC secretariat, Sustainable Development Mechanisms Programme Conor BARRY Improving and demonstrating efficiency in CDM processes 7 th Joint Coordination.
Advertisements

CCS – OVERVIEW OF THE MODALITIES AND PROCEDURES AND THEIR IMPLEMENTATION SDM JOINT COORDINATION WORKSHOP Bonn, Germany, March 2012.
UNFCCC secretariat, Sustainable Development Mechanisms Programme Modalities and procedures for direct communication with stakeholders 3/CMP 6, para. 21,
1 Functional specification: data exchange standards Pre-sessional consultations on registries 2 June 2003 Bonn, Germany Andrew Howard UNFCCC secretariat.
1 Toshiaki Nagata UNFCCC secretariat Progress on CDM registry development Inter-sessional consultations on registry systems.
Registry system data exchange General design requirements Pre-sessional Consultations on Registries 19 October 2002 New Delhi, India UNFCCC secretariat.
Major Incident Process
Fiscal Monitoring Fiscal Monitoring. Agenda I. Fiscal Monitoring I. Fiscal Monitoring II. Follow-up II. Follow-up III. Correction Action Plan III. Correction.
U.S. Department of Veterans Affairs Veterans Health Administration Supportive Services for Veteran Families (SSVF) Program SSVF Grantee Uniform Monitoring.
1 Andrew Howard UNFCCC secretariat International transaction log Roles and functions Intersessional consultations on.
1 Andrew Howard UNFCCC secretariat International transaction log Checks, public information and modalities Intersessional.
GRETA GREENHOUSE GAS REGISTRY FOR EMISSIONS TRADING ARRANGEMENTS Overview of the UNFCCC registries Workshop on China’s National administration and approval.
1 Andrew Howard UNFCCC secretariat Checks to be performed by the international transaction log Consultations on registry.
Draft Operational procedures for registry systems 09 November 2004 Bonn, Germany Technical Breakout Group.
1 Archive Access Audit Keys to Effective Compliance Lifecycle Management.
Chapter 19: Network Management Business Data Communications, 4e.
Information Security Policies and Standards
 Research data is an important asset.  We need to work together to build an infrastructure that facilitates good data management.
Internal Control Concepts Knowledge. Best Practices for IT Governance IT Governance Structure of Relationship Audit Role in IT Governance.
Chapter 9 - Control in Computerized Environment ATG 383 – Spring 2002.
E-tax system stages 1.Stage 1 - Information: online information about public services 2.Stage 2 - Interaction: downloading of forms 3.Stage 3: Two-way.
Long-term Archive Service Requirements draft-ietf-ltans-reqs-00.txt.
1 Andrew Howard UNFCCC secretariat Registry systems and transaction types Consultations on registry systems prior to.
1 Andrew Howard UNFCCC secretariat Cooperation among administrators of registry systems Consultations on registry systems.
1 Andrew Howard UNFCCC secretariat Registry systems and the data exchange standards Intersessional consultations on registry.
Accounting of Emissions and Assigned Amount under the Kyoto Protocol Clare Breidenich UNFCCC Consultant.
1 Andrew Howard UNFCCC secretariat Progress in implementing the international transaction log Consultations on registry.
The United Kingdom’s Experience and Perspective The Way Forward on Registries Martin Hession International Climate Policy DEFRA UK.
1 United Nations Framework Convention on Climate Change UNFCCC press conference, Bonn, 17 November 2008 by Sergey KONONOV (UNFCCC secretariat) UNFCCC data.
1 Andrew Howard Climate Change Secretariat Emissions trading and project-based mechanisms 1-3 April 2008 Bangkok, Thailand AWG-KP 5 In-session workshop.
1 Transaction log and the data exchange standards Introduction Pre-sessional consultations on registries 2 June 2003 Bonn, Germany Andrew Howard UNFCCC.
Data Exchange Standards in support of transaction processes 08 November 2004 Bonn, Germany Peggy Quarles Perrin Quarles Associates, Inc.
1 Andrew Howard UNFCCC secretariat International transaction log Transaction checks Intersessional consultations on registry.
Systems Analysis and Design: The Big Picture
Joint implementation, eligibility and the Compliance Committee Andrew Howard, Reporting Data and Analysis Cam Carruthers, Legal Affairs Bonn, October 2007.
SWIS Digital Inspections Project (SWIS DIP) Chris Allen, Information Management Branch California Integrated Waste Management Board November 5, 2008 The.
Trade Software Developer Technical Seminar Document Imaging System March 7, 2012.
UNFCCC secretariat Session 4 Meeting eligibility requirements First UNFCCC workshop on implementation of Article 6 projects under the Kyoto.
Quality assurance activities at EUROSTAT CCSA Conference Helsinki, 6-7 May 2010 Martina Hahn, Eurostat.
Information Assurance The Coordinated Approach To Improving Enterprise Data Quality.
Options and Recommendations Pre-sessional consultations on registries June 2002, Bonn, Germany DEVELOPMENT OF A NATIONAL REGISTRY IN BULGARIA Options.
Possible elements of the technical standards Pre-sessional consultations on registries Bonn, 2-3 June 2002 Andrew Howard UNFCCC secretariat
Expanded Public Works Programme EPWP 4 rd Summit Commission 4 1.
OPTIONS TO USE EXISTING INTERNATIONAL OFFSET PROGRAMS IN A DOMESTIC CONTEXT Case Study: The use of CDM in support of domestic offset schemes Sacramento,
Computer Emergency Notification System (CENS)
September 23, 2015 Sacramento, CA Zhang Xiaoguang Sinocarbon Innovation & Investment Co.,Ltd. T ITLE ADMINISTRATION OF REGISTRY IN CHINA W ORKSHOP “B UILDING.
© Mahindra Satyam 2009 Configuration Management QMS Training.
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
FY 2010 Data Collections Workshop Follow Up Q & A Session.
SMS Planning.  Safety management addresses all of the operational activities of the entire organization.  The four (4) components of an SMS are: 1)
European Commission: Environment Directorate General Slide: 1 Registry systems for the EU emissions trading scheme SBSTA pre-sessionals Bonn, Germany,
1 Standard Student Identification Method Jeanne Saunders Session 16.
® Incentive Programs New Functionality December 6, 2010.
A State Perspective Mentoring Conference New Orleans, LA 2/28/2005 RCRAInfo Network Exchange.
EU Study development of registries specifications IETA – Bonn SBSTA Laurent Segalen June 2003.
© Lloyd’s BINDER XML UPDATE from Lloyd’s Sarah Thacker, Delegated Authorities 28 November 2013.
NASFAA 2003: Reconnecting With Students!. 2 The Common Record - COD An Update on COD and XML.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
E-Authentication October Objectives Provide a flexible, easy to implement authentication system that meets the needs of AES and its clients. Ensure.
1 Andrew Howard UNFCCC secretariat Cooperation among administrators Overview and evolution Intersessional consultations.
1 Andrew Howard UNFCCC secretariat Cooperation among administrators Structure and modalities Intersessional consultations.
WESTERN PA CHAPTER OF THE AMERICAN PAYROLL ASSOCIATION – NOVEMBER 4, 2015 Risk Management for Payroll.
Introduction to registry systems
ACTED Accountability Systems 8 April General Overview ACTED was a member of the Humanitarian Accountability Partnership (HAP) ACTED’s accountability.
Board Financial Oversight Governing Board Online Training Module.
The OASIS Feedback Process Using OASIS to Drive Improvement.
EUETS Registry EUETS Registry; the UK Experience and Changes for Phase III Lee Oliver Workshop on EU Emission Trading Scheme – Monitoring, Reporting and.
Chapter 19: Network Management
نقش MIS در سازمانها نظارت و كنترل دقيق بر فعاليتهاي سازمان
Joint implementation and eligibility requirements
Presentation transcript:

Data Exchange Standards for the interaction with the ITL 08 November 2004 Bonn, Germany Peggy Quarles Perrin Quarles Associates, Inc.

Reconciliation The process by which data from different registry systems are compared and inconsistencies resolved.

Why do you need Reconciliation? Credibility Data accuracy Process to identify and correct problems

Reconciliation Registry and ITL agree on timing HOWEVER, if discrepancies exist… …an alternate process takes place.

Reconciliation (continued) If Data discrepancies exist… …the ITL works to isolate and identify units in question to facilitate the final step in the reconciliation process… ITL

Key Elements of Reconciliation Good communication Flexibility in timing, starting point and phases Technical feasibility

Notifications A Notification is a communication to a registry from the ITL about a required or recommended action involving unit transactions.

Types of Notifications Net source cancellation Non-compliance cancellation Impending tCER or lCER expiry Reversal of storage for CDM Project Non-submission of Certification Report for CDM Project Excess issuance for CDM Project CPR level problem Unit carry-over

Elements of a Notification Notification ID Number of Units Unit Blocks Update or status report for earlier notification

Typical Notification Process Registry ITL ITL sends notification of transaction requirements including Notification ID. Registry responds with transactions including the Notification ID. ITL monitors compliance with transaction requirements. ITL send updates to Registry indicating progress or completion of requirements ITL reports to CDM Executive Board and other entities ITL Administrator initiates notification.

Other Requirements in the DES Data Records Change Management Registry Testing and Initialization

What do Registry Systems Record? All transactions, including detail about unit blocks and response codes All reconciliation messages All notifications All internal activity (who changed what and when) A message archive (storage of XML files)

Change Management Change management is the process by which the Data Exchange Specifications can be modified.

Change Management Changes or enhancements are unavoidable Changes will be minimized to provide stability and reduce costs Registries and ITL will cooperate to implement changes methodically ITL Administrator will have key role in coordinating and communicating regarding changes

Registry Initialization Initialization is the process of bringing a registry system on-line, allowing it to fully participate with the ITL in a trading scheme. This is a technical process, not related to eligibility.

What does a Registry Need to Do? Establish and test communications Coordinate and perform testing with ITL, per Annex H Develop and submit documentation Provide government account information

Required Registry Documents Backup and Recovery Plan Disaster Recovery Plan Security Plan Time Validation and Data Logging Plans Version and Change Management Plan Test Plans and Reports Operational Plan